Renting a Ready-Built Factory in a VSIP Park
November 21, 2026
VSIP is a brand of industrial parks, not a single park. In the south, the VSIP parks tenants ask about are VSIP I in Thuan An, VSIP II around Thu Dau Mot and Tan Uyen and VSIP III around Tan Uyen and Bac Tan Uyen. All three are in the old Binh Duong area, which is now part of Ho Chi Minh City. A newer project, VSIP 4, is in the Phu Giao area. The way to compare them is by age, distance and the specific unit, not by the logo.
VSIP stands for Vietnam-Singapore Industrial Park. The brand is run by a joint venture of Becamex IDC and Sembcorp Development. Sembcorp lists the Binh Duong parks on its VSIP Binh Duong page, which is the place to confirm areas and current phases.
The VSIP parks in the Binh Duong area
| Park | Area | Approximate size | What to know |
|---|---|---|---|
| VSIP I | Thuan An | About 500 ha | The first VSIP, open since 1996. Close to the city, few large units free |
| VSIP II | Thu Dau Mot and Tan Uyen | About 2,000 ha | Established 2006. Larger, with a mix of industries |
| VSIP III | Tan Uyen and Bac Tan Uyen | About 1,000 ha | Started in 2022. Newer buildings, more room, further out |
| VSIP 4 | Phu Giao | Over 700 ha planned | New project. Check the current phase before counting on a move-in date |
Sizes are rounded from developer and press descriptions and differ slightly between sources. Do not use them in a contract. Ask the park for the current figures.
How the three older parks differ for a tenant
VSIP I has the shortest road to the city. The buildings are older, so clear height and floor load can be lower than in new units, and large vacant units are rare. If your product is light and you need staff who live in the city, it is worth a look.
VSIP II is a large park with many foreign tenants. It sits between the city side and the northern Ben Cat parks, so it is a compromise on trucking time and labor. Availability is broader than in VSIP I.
VSIP III is the newest of the three. Buildings are more recent and the park has room for larger plots. It is further from the city, so check the commute for your supervisors.
What “ready-built” means inside a VSIP park
A ready-built factory is a standard building that exists before a tenant is found. In a VSIP park these units may come from different owners:
- The park developer, which sells or leases standard units.
- Another investor or former tenant, which holds a building under a sublease from the developer.
- A group that bought several units and leases them out.
The owner matters because it sets who signs the lease, who controls repairs and how flexible the terms are. The park remains the authority on utilities, waste and rules. Ask each owner for the sublease papers, the construction permit and the fire prevention approval. Our ready-built factory checklist lists the other site checks.
How to compare two VSIP offers
Put the offers side by side on the same six lines:
- Park and phase. VSIP I, II or III, and which part of the park.
- Landlord. Developer or private owner.
- Production floor area without offices or canopies.
- Clear height, floor load and crane. Written down, not described.
- Power in kVA and whether the transformer is dedicated to the unit.
- Monthly cost on one basis. Rent, management fee and any pass-through fees, all before VAT.
Rents on public listings for managed parks near the city sit toward the upper half of the US$4 to US$7 per m² per month range seen across southern parks. That is a typical range, not an offer. The management fee is on top. Our cost guide explains how to price the usable area.
Questions to ask a VSIP landlord
- How many years remain on the park’s land lease, and does it cover the term you want?
- Is your business line on the park’s accepted list, and who confirms it?
- What is free power capacity in the park substation, not only in the unit?
- Is the management fee fixed for the lease term or reviewed each year?
- What does the park require when you add a mezzanine, a crane or a new fire load?
- Which commune or ward is on the current address after the 2025 merger?
Looking for a factory now? Send my requirements
What the park decides and what the owner decides
Tenants often send one question to the wrong party. Split them like this:
| Topic | Park management | Unit owner |
|---|---|---|
| Accepted industries and sectors | Yes | No |
| Power capacity at the park substation | Yes | No |
| Wastewater limits and connection | Yes | No |
| Truck hours, gate and security rules | Yes | No |
| Rent, deposit, term and escalation | No | Yes |
| Condition and spec of the building | No | Yes |
| Rent-free months, fit-out and repairs | No | Yes |
Ask both in writing. A landlord who says “the park will allow it” has not given you permission. Get the park’s reply, even a short email, before you sign.
Timing: what to expect from a first visit to a lease
A realistic path in a VSIP park looks like this. Week one: send your brief and receive a first list. Weeks two and three: visit two or three units, one in each park you are weighing, and ask for the sublease and fire papers. Week four and after: negotiate the draft lease, then confirm business-line fit with the park and your licensing adviser. Dates vary with the owner and the park. A unit that needs a power upgrade or a crane takes longer than one that does not.
Do not rush the paper check to save a week. A missing fire approval or a short remaining land lease costs far more than the week.
Three signs a unit is a good fit
- The clear height, floor load and kVA are written in a spec sheet from the owner, and they match what you saw.
- The park confirms in writing that your business line and your wastewater are accepted.
- The remaining land lease term covers your lease term with room to renew.
If any of the three is missing, keep looking. There are usually other units in the same cluster.
When another park is the better fit
A managed, branded park is not always the right answer. If you need a very large plot, the northern Bau Bang and Ben Cat area has more land. If you need to be close to the new airport and the Cai Mep route, look at Dong Nai instead. The Binh Duong cluster guide shows where VSIP sits among the other parks.
Get a shortlist
If you want VSIP units compared with units in other parks on the same checks, send your requirements. We visit factories, check power, floor, crane, fire approval and papers on site and send up to 5 that fit. We reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
What does VSIP stand for?
VSIP means Vietnam-Singapore Industrial Park. The brand is run by a joint venture of Becamex IDC and Sembcorp Development, and parks carry the VSIP name in several provinces.
Are all VSIP factories owned by the park developer?
Not necessarily. A ready-built unit in a VSIP park may belong to the developer or to another owner who bought or built it. Ask who the landlord is and ask to see the papers.
Is rent in a VSIP park higher than elsewhere?
Public listings for managed parks near the city often sit at the upper half of the US$4 to US$7 per m² range seen in the south. The exact rent depends on the unit, so compare offers on the same basis.
Where are the VSIP parks in the Binh Duong area?
VSIP I is in Thuan An, VSIP II is in the Thu Dau Mot and Tan Uyen area and VSIP III is in the Tan Uyen and Bac Tan Uyen area. VSIP 4 is a newer project in the Phu Giao area.