Skip to content
Send requirements

Factory for Rent in Vietnam, Checked Before You Visit

Tell us the area, power and crane you need. We find ready-built factories in the southern industrial parks, check them on site and send you a shortlist of up to 5.

Floor plan of a ready-built factory with the specs checked before a site visitSPAN 48 MDEPTH 30 MOFFICE2 FLOORSCRANE 5 TCLEAR HEIGHT 9 MFLOOR 3 T/M²LOADING DOCK560 KVASAMPLE UNIT · 1,440 M²
The numbers that decide whether a factory fits, checked on site before it reaches your shortlist.
No fee for tenantsThe owner pays when a lease is signed.
Up to 5 factoriesOnly units that fit your specs.
Checked on sitePower, floor, crane, fire approval, papers.
Reply within 24 business hoursIn English, by email or WhatsApp.

What we check before a factory reaches your shortlist

Listing photos rarely show the things that stop a move: a transformer that is too small, a floor that cannot take your machines, or a building without fire approval for your use. We check these on site and send notes with photos.

Power supply

Transformer size in kVA, whether it is dedicated to the unit and how long an upgrade takes if your lines need more.

Floor load and height

Slab load in tons per square metre and clear height under the beam. Both decide which machines and racking fit.

Overhead crane

Whether crane beams exist, their span and rated capacity, and if the structure can take a crane added later.

Fire safety approval

Whether the building already has fire prevention approval and acceptance for the use you plan. Changing use can trigger a new approval.

Land and building papers

Land use rights, construction permit and the remaining land lease term inside the industrial park.

Investment fit

Whether your business line is allowed in that park and at that address, which matters for the investment and enterprise registration.

Water and waste

Water supply, wastewater connection to the park treatment plant and limits on discharge for your process.

Access and logistics

Container truck access, loading docks, distance to Cat Lai and Cai Mep ports and to the nearest highway.

Typical lease terms in southern industrial parks

Ranges seen on public listings for ready-built factories in 2026. Every site has its own numbers, and we confirm them in writing before you visit.

  • RentAbout US$4 to US$7 per m² per month inside industrial parks, depending on location, age and spec.
  • Minimum termUsually 3 years for ready-built units. Larger or custom units ask for 5 to 10 years.
  • DepositCommonly 3 to 6 months of rent, plus rent paid in advance.
  • Management feeA small fee per m² per month for park services, charged on top of rent.
  • UtilitiesPower, water and wastewater billed by the park or the utility at published rates.

Where we search

The southern manufacturing belt around Ho Chi Minh City, where most ready-built factories and most container routes to Cat Lai and Cai Mep are.

Binh Duong

Ben Cat, Tan Uyen, Bau Bang and Thuan An. The densest cluster of industrial parks in the south, now part of Ho Chi Minh City.

Dong Nai

Bien Hoa, Nhon Trach and Long Thanh. Close to Long Thanh airport and the Cai Mep port route.

Ho Chi Minh City outskirts

Cu Chi, Hoc Mon and Binh Chanh. Shorter trips to the city, smaller plots and higher rents.

Long An and Tay Ninh

Lower land cost on the western side, longer trucking time to the ports.

Rent a ready-built factory or build your own?

Most companies entering Vietnam rent first. Building makes sense when the process needs a building made around it.

Rent ready-built

  • Start production in a few months instead of one to two years
  • Lower upfront cash, no land lease premium to pay
  • Easier to exit or move if orders change

Lease land and build

  • Layout, floor load and power built around your process
  • Better fit for heavy, special or very large operations
  • Long land lease term needed, and a longer permit path

How it works

One brief from you. A short list of factories that fit. You negotiate and sign directly with the owner.

  1. Send your requirements

    Area, location, power, crane, move-in date and what you will produce. Takes about three minutes.

  2. We search and check

    We match units from owners and park developers, then check power, floor, crane, fire approval and papers on site.

  3. Visit your shortlist

    You get up to 5 factories with notes and photos. We arrange the visits and stay with you until the lease is signed.

Already know what you need?

Send the short version now and we will ask for anything missing. For a full brief with power, crane and lease term, use the full requirements form.

Your company details go only to owners of factories that fit.

Reply within 24 business hours.

Own an empty factory? List it free.

We introduce it privately to manufacturers whose requirements fit. A fee is due only when a lease is signed, on terms agreed before any introduction.

Questions tenants ask

Something else? Email .

Do tenants pay a fee?

No. You pay nothing for the search, the shortlist or the site visits. Our fee is paid by the property owner when a lease is signed.

What size of factory do you work with?

Mostly ready-built units from about 500 to 10,000 m². Larger or built-to-suit projects are possible, tell us what you need.

Which areas do you cover?

The southern industrial region: Binh Duong (now part of Ho Chi Minh City), Dong Nai, the outskirts of Ho Chi Minh City, Long An and Tay Ninh.

How fast can I get a shortlist?

We reply within 24 business hours. A shortlist of up to 5 factories usually follows within a week, depending on how specific your requirements are.

Can you help if I have not set up a company in Vietnam yet?

Yes. Many tenants sign a lease or a lease commitment as part of their investment registration. We check that your business line fits the park and can point you to licensing advisers.

Do you visit the factories yourselves?

Yes. Before a factory goes on your shortlist we check the power supply, floor, crane, fire safety approval and papers on site, and send photos and notes.