The Lowest Rent Is Not the Lowest Cost: Traps in Cheap Factory Offers
November 21, 2026
A low rent per m² is a starting point, not a result. A factory that costs 20 percent less on the listing can cost more over the lease once you add the power upgrade, the roof repair, the fire approval, the delay before you can start and the exit costs. Compare units by total cost per productive month, and ask why the cheap one is cheap.
Cheap does not mean bad. Many older or less central units are fair value. The trap is paying less for a building that needs money you did not budget.
What a low rent usually hides
| Reason for the low price | What it can cost you |
|---|---|
| Old building | Roof, floor and electrical repairs. See old factory defects |
| Weak or shared power | Transformer upgrade and a months-long wait. See power not delivered |
| No valid fire approval for your use | New approval, works and a delay. See fire approval risk |
| Wrong land use or short land lease | Legal trouble or a forced exit. See land use problems |
| Remote location | Longer trucking, harder hiring, higher transport cost |
| Poor park services | Weak roads, drainage, security, internet |
| Rent excludes items | Management fee, VAT, utilities minimums charged on top |
| Smaller usable area | Rent per m² looks low, rent per usable m² does not. See gross vs usable area |
| Landlord in a hurry | Debt, mortgage, a lease that cannot be sold. See mortgaged factories |
| Unclear lessor | Sublease or agent with no authority. See when the lessor is not the owner |
None of these is certain. Each is a question to put to the landlord.
A worked comparison
This is a hypothetical example with made-up figures to show the method. Two units of 2,000 m². Management fee, utilities and fit-out are assumed equal and left out.
| Unit L (low rent) | Unit H (higher rent) | |
|---|---|---|
| Rent per m² per month | US$4.00 | US$5.20 |
| Monthly rent | US$8,000 | US$10,400 |
| Rent over 36 months | US$288,000 | US$374,400 |
| Transformer upgrade | US$40,000 | none |
| Roof repair | US$18,000 | none |
| Fire approval update | US$8,000 | none |
| Total over 36 months | US$354,000 | US$374,400 |
| Months before production starts | 4 | 1 |
| Productive months | 32 | 35 |
| Cost per productive month | US$11,063 | US$10,697 |
On the listing, Unit L is 23 percent cheaper. After the extras and the delay, it is more expensive per month of production. The gap is small here. Change one assumption, such as a longer power wait or a landlord who refuses to share repair costs, and it widens. Change another, such as a landlord who pays for the roof, and Unit L wins. That is the point: the answer comes from the questions, not from the rent.
Ten traps to check
- Rent per m² on gross area. Offices, canopy and mezzanine inflate the area. Divide by production floor.
- Rent before VAT and fees. Ask for the monthly invoice a current tenant receives. See hidden costs.
- Teaser rent that rises. A low first year followed by steep escalation. See rent escalation.
- Short rent-free period traded for high rent. Or the reverse. Compare totals.
- Large deposit or long advance payment. Cash tied up for the term. See deposit amounts.
- Repairs shifted to the tenant. A lease that says “tenant maintains everything” turns the roof into your bill. See who pays repairs.
- Reinstatement duties. You must remove all fit-out and repair damage at the end. See reinstatement cost.
- Power priced separately. Low rent, but power resold at a margin or limited by a sub-meter.
- Short land lease. The building is cheap because the land right ends soon. See land lease term.
- Pressure to pay first. Cheap units often come with a rush. See paying before checks.
Looking for a factory now? Send my requirements
How to compare fairly
- Fix the spec. Write the area, clear height, floor load, power and crane you need. Compare only units that meet it. The requirements template helps.
- Use production area. Not the listed total.
- Add monthly costs. Rent, management fee, service charges, VAT.
- Add one-off costs. Repairs, upgrades, approvals, fit-out that differs between units.
- Add time. Months from signing to production. Rent paid while waiting is a cost.
- Add exit costs. Reinstatement, notice, forfeited deposit.
- Divide by productive months. Compare the result.
- Weigh the risk. A unit with several unknowns deserves a margin. A scoring sheet helps; see comparing shortlisted factories.
Questions that test a low price
- Why is this unit cheaper than the ones next to it?
- When was the roof last replaced? Is the unit free of leaks in the rainy season?
- What is the transformer rating and who does it serve?
- Does the fire approval cover my use?
- How long is the land lease left, and who is the lessor?
- What is on the monthly invoice besides rent?
- What will you repair before handover, and in writing?
A landlord who answers calmly and in writing is usually a better partner than one who changes the subject.
Turning a cheap unit into a fair deal
If the unit fits and the landlord is open, use the weak points as terms to negotiate rather than reasons to leave.
- Repairs before handover. Ask the landlord to fix the roof and the known defects at its cost, with dates and an acceptance check.
- Rent-free period that starts at power. Link the first rent day to the date the power and approvals are in place, not to the date of the keys.
- Shared upgrade cost. Split the transformer or the dock works, or recover them from rent over the term.
- Capped escalation. A low rent that rises sharply loses its value. Fix the yearly rate.
- Break right. A right to leave after a set period gives you an exit if the unit disappoints.
- Papers as conditions. Make the signing depend on the ownership papers, the fire approval and the land term being confirmed.
A landlord with a cheap unit often has room on these points, because the rent is already low. Ask for them in one list, in writing, and compare the total again. See the negotiation guide for the levers that tend to move.
When a cheap unit is a good choice
A cheaper unit works when three things hold:
- The spec fits your process now, not after upgrades.
- The papers are clean and the lessor is the owner or has proved authority.
- The known defects are priced into the deal, and you have a repair plan in the lease.
An older unit with enough power, a sound slab and a repaired roof can be a sensible choice for a first plant or a three-year project. See small factory options if size is the main driver.
Get a shortlist
We compare units on spec and papers first, and note the rent as listed with the fees and extras we could confirm. Send your requirements and we reply within 24 business hours. Tenants pay nothing. For the larger set of errors in a search, read factory search mistakes.
Frequently asked questions
Why is one factory much cheaper than others nearby?
Common reasons are age, weak power, a poor roof, a bad location in the park, a short land lease, missing approvals or a landlord who wants to fill the unit fast. Ask for the reason and check it on site.
What is a normal rent range?
Public listings for ready-built units in southern industrial parks commonly show about US$4 to US$7 per m² per month. A figure far below that range for a modern unit in a good park needs an explanation.
How do I compare a cheap unit with a dearer one?
Add rent, fees, one-off repairs and upgrades over the lease term, then divide by the months you can actually produce. The unit with the lowest rent per m² is not always the lowest result.
Is a cheap factory ever a good choice?
Yes, when the spec fits your process, the papers are clean and the defects are known and priced. A low rent for an older unit with the right power and floor can be a good deal.