Renting an Older Factory: The Defects That Do Not Show in Photos

November 21, 2026

Older factories can be good value, but they hide their problems in the roof, the slab, the steel, the drains and the wiring. Inspect those five areas on a rainy day if you can, list every defect on the handover report and put repair duties and costs into the lease before you sign. For a large unit or a long term, pay a building engineer for one day. It costs little compared with a failed roof over your machines.

Why age matters

A building a few years old shows its quality. A building fifteen or twenty years old shows its maintenance. Southern Vietnam is hard on buildings: heat, heavy rain, humidity, salt air near the coast, termites and flooding in low areas. A unit that was never maintained looks fine from the car and fails in the first rainy season.

An older unit is not a risk if you know what is wrong and who pays. It becomes a risk when the defects appear after you moved in.

The inspection list

Area What to look for Why it matters
Roof sheets Rust, holes, patched areas, loose fixings, old fibre-cement Leaks, heat, safety
Gutters and downpipes Blockage, rust, sagging, too few outlets Overflow into the hall
Steel frame Rust at column bases and bolts, bent members, repaired welds Load capacity, crane use
Floor slab Cracks, settlement, uneven joints, patched areas, soft spots Machines, forklifts, racking
Walls Cracks, damp, peeling, bulging Water ingress, structure
Drainage Standing water, slow drains, smell, blocked pits Flooding, hygiene
Electrical Old cables, overloaded panels, no earth, burn marks Fire risk, power limits
Doors, docks, levellers Seized, bent, leaking, weak seals Operation and security
Termites and pests Mud tubes, damaged wood, droppings Damage to wood, offices, pallets
Fire systems Corroded pipes, old extinguishers, dead alarm panels Approval and safety

Roof: the first thing to inspect

Roofs are the most common source of trouble in an older factory. See also roof heat and insulation.

  • Walk the hall during or just after rain, and look up for drips, wet patches and stained floors.
  • Look at the ceiling lines and under skylights for water marks.
  • From outside, look for sagging, rust streaks and patches of mismatched sheets.
  • Ask when the roof was last replaced, who did it and whether there are records.
  • Ask what happens after a typhoon or heavy storm.

A roof near the end of its life is not a reason to reject the unit. It is a reason to ask the landlord to replace it, or to share the cost, before you install machines under it.

Asbestos: handle with care

Older roofing and wall sheets in Vietnam were often made of fibre-cement, and some contained asbestos. You cannot tell from the surface. Asbestos is not a danger while the material is intact, but drilling, cutting, breaking or removing it can release fibres.

What to do:

  1. Ask the landlord what the roof and wall sheets are made of, and for purchase or installation records.
  2. Do not cut or drill old sheets for fans, skylights or mounts until the material is known.
  3. Test if in doubt. A specialist laboratory can test a sample taken by a trained person.
  4. Plan the removal through a qualified contractor if you need to alter or replace the sheets. Rules on asbestos materials and their handling have been changing, so ask your adviser or the park what applies now.
  5. Write it into the lease. The landlord states what it knows, handles removal at its cost if the material is hazardous and does not charge you for it.

Do not scare yourself, and do not ignore it. Intact sheets are managed by leaving them alone.

Cracks: read them, do not just count them

Not every crack is a defect. Hairline cracks in a slab are common. Others point to real trouble.

Crack pattern Possible meaning
Fine hairlines in a floor slab Normal shrinkage, usually no action
Wide cracks with height difference across them Settlement or poor base
Diagonal cracks near column bases or wall corners Movement or overload
Cracks that keep growing Active movement. Get an engineer
Cracks with rust stains Corroding reinforcement
Cracks and damp near drains Water under the slab

Photograph any crack with a coin or ruler for scale and note the date. Ask the landlord whether the cracks are old. If you are installing heavy machines, press lines or high racking, ask for a floor load check. See the floor load guide.

Looking for a factory now? Send my requirements

Steel, rust and termites

Steel. Look at column bases, anchor bolts, purlins and the lower part of wall cladding. Surface rust is common. Flaking rust, section loss and repaired welds need an engineer. If you plan an overhead crane, steel condition is part of the crane check. See crane checks.

Termites. Wooden doors, frames, office partitions and stored pallets are targets. Look for mud tubes on walls and damaged wood. Ask whether the unit has had pest treatment and when. Add a termite inspection to the engineer’s visit.

Drainage and flooding

Check where the water goes. Blocked yard drains, low spots at the gate and slab levels close to the road all turn rain into a problem. Ask what happened in the last heavy rain season. See flood risk.

Electrical and fire systems

Old wiring may be undersized, poorly earthed or patched. Ask for the single-line diagram and the last electrical inspection. Check that fire alarm and sprinkler equipment is working and has service records. Old equipment may not meet what your use needs. A building that has aged out of its fire approval is a bigger issue, see the risk of a unit without fire approval.

Who pays: a split to propose

The lease decides, and landlords differ. A common starting point:

Item Usually the landlord Usually the tenant
Roof structure and sheets Yes Damage caused by tenant’s use
Main structure, slab Yes Damage caused by tenant’s machines
Existing defects listed at handover Yes, or agreed rent credit No
Normal wear in fit-out No Yes
Asbestos found in the building Yes No
Pest treatment Shared or landlord Day-to-day control

See who pays repairs for clause wording and the handover report to record the starting condition.

Make the defects part of the deal

Do not use defects only to lower rent. Use them to get a repair plan. Ask for:

  • A written list of agreed repairs with dates before handover.
  • A rent-free period that starts when the repairs finish.
  • A rent credit for repairs you do yourself, with approval of the quote first.
  • A clause that existing defects are not your liability at the end of the lease.

Get a shortlist

When we visit a unit, we note roof condition, visible cracks, signs of leaks and pests, and the age of the electrical and fire equipment, with photos. We are not engineers, so for a long lease we suggest an independent inspection. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

Is an older factory a bad choice?

No. Older units are often cheaper and may fit your process well. They need a closer inspection, because age brings roof, floor, steel, electrical and drainage problems that photos do not show.

How can I tell if a roof contains asbestos?

You cannot tell by eye. Old fibre-cement sheets may contain asbestos. Ask the landlord for material records and, if in doubt, have a specialist test a sample. Do not drill, break or cut suspect sheets yourself.

Who pays to repair defects in a leased factory?

The lease decides. Usually the landlord repairs structure and roof and the tenant repairs what its use damages. Write the split into the lease and record existing defects on handover.

Should I hire an engineer to inspect?

For a large unit or a long lease, yes. A structural or building engineer can inspect in a day and give a short written note that you can use in the negotiation.