Hot and Leaky? What to Check on a Factory Roof Before You Lease

November 21, 2026

Look at four things on the roof of any factory you consider: the sheet and its insulation, the skylights and joints where water gets in, the gutters and downpipes and the signs of past leaks inside. In a tropical climate with a long rainy season and hot sun, a roof decides how comfortable the work floor is and how much risk your stock carries.

A bad roof is cheap to spot and expensive to ignore. A leak over a machine or a stack of cartons costs more than a month of rent.

Why the roof matters here

Southern Vietnam is hot all year and has a long rainy season, roughly from May to November. A metal roof in direct sun gets very hot and radiates heat down onto the workers and the machines. Heavy rain finds every weak spot, especially around fasteners, skylights, ridge caps and joints.

Two problems follow: heat and water. They need different checks.

Roof types you will see

Type Heat Leak risk Notes
Single-skin metal sheet High heat gain Medium: fasteners and laps Common in older units. Often has a thin insulation layer or none.
Metal sheet with insulation layer Better Medium Glass wool or foam under the sheet, with a foil facing. Check for damp, torn or missing sections.
Insulated sandwich panel Best of the three Lower Two metal skins with a core. Joints between panels still need to be sealed.
Concrete or tile roof Slower heat gain Varies Rare in factory halls.

Ask the landlord what the roof is made of, when it was installed and whether it was ever replaced.

Checking the heat side

Insulation

Look at the underside of the roof. You should see either a foil-faced blanket, sandwich panel lining or bare metal. Check for sagging, torn facing and wet patches in the blanket. Wet insulation loses its effect and can rust the sheet above it.

Roof colour and finish

Light, reflective roof coatings reduce heat gain. A dull dark roof absorbs more. If you can, take a surface temperature reading with an infrared thermometer on a sunny afternoon, and compare the air temperature on the floor with the outside. A large gap suggests the roof helps. A hot hall suggests it does not.

Ventilation at the roof

Ridge ventilators, turbine vents and roof louvres let hot air out. Without them, the hot air stays under the roof. Check that these are present, open and in good condition. Our ventilation guide covers this in more detail.

Skylights

Translucent panels bring daylight and cut lighting costs, but they also let in sun heat. A few are useful. Too many make the hall hot. They also age: plastic panels yellow and crack, and the joints around them are a common leak point.

Checking the leak side

Walk the floor and look up. Then look at the roof from outside, if the landlord allows safe access.

  • Stains and rust streaks on the roof underside, purlins or columns.
  • Drips or damp patches near skylights, ridge lines and valley gutters.
  • Fasteners. Look for rusted or missing screws, and signs of sealant patches.
  • Laps and joints. Water can pass through the overlaps in the sheeting, especially on a low roof pitch.
  • Gutters and downpipes. Look for rust, blockage, standing water and leaks at the joints. Check where water goes: it should flow away from the building, not pool against the wall or flood the dock.
  • Roof penetrations. Pipes, flues, fans and vents all need proper flashing.
  • Floor. Look for stains, dried water marks or sections of damaged paint under the roof joints.

If you can only visit on a dry day, ask the landlord for photos taken in the rain and the repair log. Better, ask the neighbours in the same park.

Add loads to the roof carefully

Tenants often add things to the roof: solar panels, extra fans, ducts and cooling equipment. The roof structure and sheet were designed for a certain load. Ask the landlord and an engineer before you add anything. For solar panels, agree in writing who owns them and what happens at the end of the lease.

Looking for a factory now? Send my requirements

Questions for the landlord

  • What type of roof is it, and how old?
  • Is there insulation, and what type?
  • Has the roof leaked? Where, and what was done?
  • Who repairs the roof, how fast and at whose cost?
  • Can I fix a skylight or fit extra ventilation, and who approves it?
  • Is there a roof access route and fall protection for maintenance?

Make sure the answers appear in the lease. Our guide on who pays for repairs explains the usual structural and non-structural split.

Insurance

Rain damage to stock and machines is a common claim. Check what your insurance covers and what the landlord insures. Our guide on tenant insurance lists the questions.

Roof and the rest of the checklist

A roof check fits into a wider site visit with power, floor, height and fire approval. Take the ready-built factory checklist with you.

Roof repairs and upgrades

If the roof is weak, you have a few options. None is free, so agree who pays before you sign.

Option What it does Who usually pays
Re-seal fasteners and laps Stops minor leaks Landlord, as a repair
Replace skylights or flashing Stops leaks at the weak points Landlord, if the roof is theirs to maintain
Add insulation under the sheet Cuts heat at the work level Often the tenant, as fit-out, or shared
Reflective roof coating Cuts heat gain from the sun Negotiable
New roof sheet or panels Resolves ageing or major leaks Landlord, usually through the rent

Ask for the work to be done before handover, with a date. Roof work in the rainy season is slow and risky, so schedule it for the dry months where you can.

A quick test during the visit

Stand in the middle of the hall at mid-afternoon on a sunny day. If the air under the roof is much hotter than at head height, and the roof surface feels hot to the touch from a safe place, the heat load is high. Compare two or three units on the same day. The difference between them is often clear within a few minutes.

Reading the roof from the outside

If you can safely view the roof from a mezzanine, a nearby building or a drone shot supplied by the landlord, look at the colour and condition of the sheets. Chalky, faded sheets show age. Dark streaks mark where water runs and pools. Rust around fasteners and at the edges shows the coating has failed. Heavy moss or debris in the gutters means maintenance has been poor.

Ask whether there is a roof walkway or safety line for maintenance. Staff who walk on a thin metal roof without proper access risk a fall. If maintenance is your responsibility, you need a safe system of work before anyone goes up.

Get a shortlist

We look at the underside of every roof we visit and ask about leak history, and we note it in the report for each shortlisted unit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

What roof types are common in ready-built factories?

Most are steel frame buildings with a profiled metal roof. Better units add insulation under the sheet or use sandwich panels. Older units often have single-skin sheeting with little or no insulation.

How can I tell if a roof leaks?

Visit after heavy rain if you can. Look for stains on the underside, drips at the skylights and fasteners, rust streaks and puddles on the floor. Ask the landlord for the repair history.

Who pays to fix a leaking roof?

It depends on the lease. A leak in the roof structure or sheeting is normally the landlord's repair. Agree this in writing, with a response time, and make sure damage to your goods is covered by your insurance.

Does roof insulation lower the electricity bill?

Insulation lowers the heat under the roof, which helps comfort and reduces cooling load if you air-condition. It does not cut the bill much in a naturally ventilated hall, but it makes the work area cooler.

Looking for a factory now?

Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.

Send my requirements