Which Insurance Does a Factory Tenant Need in Vietnam?
November 21, 2026
In a leased factory the landlord normally insures the building. The tenant insures everything that belongs to the tenant: machines, stock, fit-out and the risk of harming other people or property. Business interruption, storm and flood need a decision from you. The lease should state each point in writing, because a gap between the landlord’s policy and yours is where uninsured losses happen.
This guide is general information and is not insurance or legal advice. An insurance broker should confirm the cover for your site and process.
The five types of cover
| Cover | What it protects | Usually bought by |
|---|---|---|
| Building property | Structure, roof, fixed systems | Landlord |
| Contents and machinery | Your machines, tools, stock and fit-out | Tenant |
| Business interruption | Lost income after an insured loss | Tenant |
| Public liability | Injury or damage to third parties on site | Tenant |
| Product liability | Claims from products you ship | Tenant |
Building property
The landlord insures the structure. Ask for a copy of the policy summary and the list of risks covered. Check whether the policy includes storm and flood, and whether it covers the fixed systems you will rely on, such as the transformer, the fire system and the roof.
Contents and machinery
Your equipment is not covered by the landlord’s policy. Insure it for the replacement value, not the book value, and include stock, tools and any fit-out you paid for. Add transit cover if you move machines from another country.
Business interruption
If a fire stops production for four months, the rent still falls due and orders go elsewhere. Business interruption cover pays part of the lost income while you rebuild. It costs extra and has conditions, so ask a broker to explain the waiting period and the indemnity period.
Public liability and product liability
Public liability covers injury or damage to third parties on your site, such as a visitor, a truck driver or a neighbor tenant. Product liability covers claims from products you sell, which many foreign customers require in supply contracts.
Compulsory cover
Vietnamese rules make some insurance compulsory. Fire and explosion insurance applies to a defined list of facilities with higher fire risk. Whether your factory is on the list depends on the process, the materials and the size. Do not guess. Ask the park management board and a licensed insurance broker, and write the answer in your file.
Employee insurance is a separate duty. Social, health and unemployment insurance for staff follows labor and insurance law. Your adviser or payroll provider handles it.
Who pays for what in the lease
| Question | What to agree |
|---|---|
| Does the tenant pay a share of the building premium? | Yes or no, and how it is calculated |
| Must the tenant name the landlord on its policy? | Often the landlord is named as an interested party |
| Minimum cover | A sum or a standard such as full replacement value |
| Evidence | A certificate before handover and again at each renewal |
| Claims | Who deals with the insurer, who receives the money |
| Waiver | Whether insurers can claim against the other party after a loss |
Ask for a copy of the landlord’s policy and for a short list of exclusions. A landlord who cannot provide it before signing may not have the cover you assume.
Risks specific to the south
Fire
Factories with plastics, wood, foam or packaging hold a high fire load. A change of process can also change the fire approval, which may affect the cover. See our guide on factory fire safety approval.
Storm and flood
The rainy season brings heavy rain and some areas flood. Check the floor level and the history, and ask insurers whether flood is covered or excluded for the site. Read the flood risk guide for the site checks.
Theft and security
Parks provide gate security, but not protection for your stock. Ask about theft cover and the conditions, such as alarms and guards.
Power surges
A weak supply can damage electronics. Cover for machine breakdown and for electrical damage is worth pricing if you run sensitive equipment.
A simple way to set the sums insured
- List every asset: machines, tools, racking, IT, stock and fit-out.
- Price each at replacement cost delivered and installed.
- Add stock at its replacement cost at the peak of the year.
- Estimate monthly gross profit and the months it would take to restart.
- Give the list to a broker and ask for a quote on each cover.
Repeat the list each year. Under-insurance is common after a plant grows.
Looking for a factory now? Send my requirements
Insurance and the rest of your cost plan
Premiums are a recurring cost like rent and utilities. Add them to your monthly figure, as shown in the guide to costs outside the headline rent. For the contract wording, see the guide to factory lease agreement clauses.
What to ask a broker
A broker works for you when you hire one. Take the draft lease and the process description to the first meeting, and ask:
- Which covers does the lease require, and with what minimum sums?
- Which risks does the landlord’s policy exclude that matter for my process?
- Is fire and explosion insurance compulsory for this site and process?
- What is the waiting period and the indemnity period for business interruption?
- How are machines valued at claim time: replacement or depreciated value?
- Which exclusions apply to flood, storm and electrical damage?
- What documents must I keep to support a claim?
Compare at least two quotes on the same specification, line by line. Premiums are only comparable if the cover, the excess and the sum insured are the same.
Common gaps
- Fit-out not insured. Partitions, floors and air lines you paid for belong to nobody’s policy unless you insure them.
- Sum insured too low. Machines bought five years ago cost more to replace today.
- Stock peaks forgotten. Stock before a holiday or a peak season can be double the average.
- No cover for goods stored in the yard. Policies often limit cover to goods inside the building.
- Landlord policy assumed. Nobody asked for a copy, and the cover turns out to exclude the cause of the loss.
Documents to collect before handover
Make a folder with the landlord’s policy summary, your own certificates, the park rules on fire protection and the fire approval papers. If a loss happens, you will need all of them in one place. This folder pairs well with the day-one condition record described in our guide to the factory handover report.
Claims: what to do after a loss
Insurers pay faster when the file is complete. After a fire, flood or theft:
- Make the site safe and protect people first.
- Tell the insurer and the landlord in writing within the time the policy sets.
- Photograph everything before clearing or repairing, unless safety requires it.
- Keep damaged items until the insurer agrees to release them.
- List the lost items with purchase dates and values.
- Do not start permanent repairs before the insurer agrees the scope.
The deadlines in the policy are strict, so read them before a loss happens, not after.
Get a shortlist
Tell us your process, area and move-in date. We check each factory on site, note the fire approval status and the building condition, and send up to 5 that fit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
Who insures the building in a leased factory?
Usually the landlord insures the building structure. Check the lease, because some landlords pass part of the premium on to the tenant, and ask for a copy of the policy.
Is fire insurance compulsory for a factory in Vietnam?
Vietnamese rules make fire and explosion insurance compulsory for certain facilities with a higher fire risk. Ask the park management board or an insurance broker whether your site and process fall under it.
What should a tenant insure?
Machines, stock and fit-out you paid for, plus liability for injury and damage to others. Many tenants add business interruption and cover for storm and flood.
Does employee insurance count as factory insurance?
It is a separate duty. Social, health and unemployment insurance for employees follow labor and insurance law, and your adviser should set it up. This guide covers property and liability cover.