Skip to content
Send requirements

Guides / Cost

How Much Deposit Does a Landlord Ask for When You Rent a Factory?

November 21, 2026

Landlords of ready-built factories in southern Vietnam commonly ask for a deposit of 3 to 6 months of rent, plus one to three months of rent paid in advance. For a 2,000 m² unit at US$5.50 per m², that is US$33,000 to US$66,000 in deposit and another US$11,000 to US$33,000 in advance rent, so US$44,000 to US$99,000 before you start fit-out. The amount is negotiable. The conditions for getting it back matter just as much as the number.

Two deposits, not one

Tenants often meet two different deposits and mix them up.

Holding deposit. You pay it before the lease is signed, to take the unit off the market while you finish due diligence and the contract. It is often a smaller sum, such as one month of rent. Vietnamese law treats a deposit given to secure a future contract in a specific way: under the Civil Code (Article 328), if the party who paid refuses to sign, the deposit can be lost, and if the receiving party refuses, it may have to return the deposit plus an equal amount. Ask a licensed adviser to read the holding deposit agreement before you pay, and write down the conditions under which you can walk away and get the money back, such as failed due diligence or a missing permit.

Lease deposit. This is the security held during the lease for unpaid rent, utility bills and damage. It is usually larger and is dealt with in the lease itself. The holding deposit should be credited against it.

Keep them in separate documents, so one does not quietly become the other.

How much, and why it varies

Factor Pushes the deposit up Pushes it down
Unit New, high spec, custom works by landlord Older unit, standard shell
Tenant New company, no local track record Tenant with a parent guarantee or bank guarantee
Term Short term, high landlord set-up cost Five years or longer
Landlord Individual owner, small portfolio Park developer with standard contract

A new foreign-invested company with no operating history often receives the higher end of the range. A parent company guarantee or a bank guarantee can bring it down, or let you pay less cash.

Cash, bank guarantee or other forms

Form How it works Points to check
Cash deposit Paid to the landlord, usually by bank transfer Currency of refund, any interest (normally none), account details
Bank guarantee A bank promises to pay the landlord if you default Issuing fee, collateral the bank asks for, expiry date and renewal
Parent company guarantee Your overseas parent signs a guarantee Needs legal review and often notarisation; landlords vary on acceptance
Mixed Part cash, part guarantee Common compromise, write down the split

A bank guarantee keeps cash in your business, which is useful in year one when fit-out and machines take most of your funds. The cost is the bank fee and the collateral the bank may require. Check the expiry date: a three year lease needs a guarantee that stays valid for the whole term and for a period after, or one that is renewed on time. A guarantee that lapses can be treated as a breach.

When the deposit is paid

Do not hand over the full deposit at the same moment you sign if handover comes weeks later. Common structures:

  1. Part at signing, balance at handover. The landlord has comfort, you hold cash until you receive the unit.
  2. All at signing. Standard in park developer contracts. Ask that the lease states what happens if the landlord fails to hand over on time, including a refund of deposit and advance rent.
  3. Staged with milestones. Used for built-to-suit works, tied to construction stages.

The lease should say that if the landlord cannot hand over the unit by a long-stop date, you can cancel and receive everything back.

What the landlord can deduct

At the end of the lease, landlords normally deduct unpaid rent and fees, outstanding utility bills and the cost of damage beyond normal wear. Disputes start when the lease has no clear standard for the condition of the building. Protect yourself in three ways:

  • Sign a handover condition report on day one, with photos and meter readings.
  • Ask what “reinstatement” means for your fit-out. Partitions, epoxy floors and mezzanines may have to be removed, or you may be allowed to leave them. Our guide to factory reinstatement at lease end goes into this.
  • Ask that deductions must be itemised in writing with supporting invoices.

Looking for a factory now? Send my requirements

Getting the money back

A clear refund clause has four parts:

  • A fixed deadline. For example, a stated number of days after you hand back the keys and the final meter readings are agreed.
  • A joint inspection. Both sides walk the unit and list defects on the same day.
  • A defined deduction process. Itemised, with evidence, and a limit on what can be deducted for wear and tear.
  • Same currency. If you paid in US dollars, the refund should be in the same terms. Read our note on USD or VND in a factory lease for how exchange rates can change the amount you receive.

A deposit usually earns no interest. Do not assume otherwise unless the lease says so.

If the landlord sells the building

A deposit is a claim against the landlord who received it. If ownership changes during the lease, the lease usually continues, but the deposit does not always follow automatically. Ask the lease to say that a new owner takes over the deposit obligation, and ask for written confirmation of the deposit balance when the transfer happens. See what happens to your lease when a landlord sells.

Questions to ask before you pay

  • Is the deposit calculated on rent only, or on rent plus management fee and VAT?
  • Will you accept a bank guarantee or a parent guarantee for part of it?
  • When exactly is each payment due, and what is refunded if handover is late?
  • Is the holding deposit credited against the lease deposit?
  • What deductions are allowed, and what is the refund deadline?

An example cash plan

Take a 2,000 m² unit at US$5.50 per m² per month, so monthly rent of US$11,000, on a three year lease. The cash due at signing could look like this, using the ranges above:

Item Low case High case
Lease deposit (3 to 6 months) US$33,000 US$66,000
Advance rent (1 to 3 months) US$11,000 US$33,000
Total at signing, before VAT US$44,000 US$99,000

These are typical ranges from public listings, not an offer from any landlord. The point is the gap: the same unit can need more than twice the cash depending on terms. If you have a fixed year-one budget, negotiate the deposit multiple and the form (cash or guarantee) before you negotiate a small change in the rent.

Deposit versus advance rent

Advance rent is paid in advance for a future period and is used up as the lease runs. The deposit is held and returned. Contracts sometimes blur the two, so check:

  • Is advance rent applied to the first months, or to the last months of the lease?
  • Is the deposit allowed to be used as the last months’ rent, and if so, on what notice?
  • If you terminate early, which of the two is kept?

A clean contract names each amount, the date it is due, what it is for and when it is returned.

Get a shortlist

Deposit terms differ a lot between park developers and private owners, so compare them on the same units. Send your requirements and we reply within 24 business hours. We then check factories on site and send a shortlist of up to five. Tenants pay nothing. For the full cost picture, start with our factory rent cost guide.

Frequently asked questions

How much deposit is normal for a factory lease in Vietnam?

Commonly 3 to 6 months of rent, plus one to three months of rent paid in advance. Larger or custom units can ask for more.

Can I give a bank guarantee instead of cash?

Some landlords accept it, especially for larger tenants or longer terms. Others insist on cash. Ask early, since a guarantee needs a bank, a fee and time to issue.

What is the difference between a holding deposit and a lease deposit?

A holding deposit is paid before the lease is signed to take the unit off the market. A lease deposit is the security held during the lease. Each has its own rules on when it is refunded, so keep them in separate documents.

How long does the landlord have to return the deposit?

The lease should set a fixed number of days after handback and a final meter reading. If the contract says nothing, you have no clear date to enforce, so agree one before signing.

Looking for a factory now?

Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.

Send my requirements

Keep reading