Will the Floor Hold Your Machines? How to Check Slab Load

November 21, 2026

A floor load figure in tons per m² is only half of the answer. Ask for it, then check it against two things: the total weight of your equipment per m² and the heaviest single point load, such as a press foot or the base of a rack upright. A slab rated at 3 tons per m² can still crack under a 20 ton machine standing on four small feet.

This guide shows how to read the rating, how to calculate your own loads and what to look for on the slab during a visit.

What a floor load rating means

The rating is the weight the slab was designed to carry, spread evenly across the floor. Engineers write it in tons per m² or kN/m², where 1 ton per m² is about 10 kN/m².

Three details sit behind the number:

  • Slab thickness and reinforcement. More concrete and steel carry more load.
  • The ground under the slab. Much of southern Vietnam sits on soft alluvial soil. Designers deal with it by compacting the ground, using piles or limiting the load. A strong slab on weak ground still settles.
  • The design use. A slab designed for a light warehouse is not designed for machining or stacked steel coils, even if the building looks the same.

Ask for the structural drawings and the written design load. A figure repeated in a brochure is not proof.

Typical loads by use

These ranges are general engineering practice, not values for any specific building. Check your own equipment.

Use Rough floor load needed
Light assembly, garment, packing Low: about 1 to 2 tons per m²
General warehouse with pallets About 2 to 3 tons per m²
Plastic injection, light machining About 3 tons per m² or more, check each machine
Presses, heavy machine tools, steel stock Higher, and point loads decide the design
High-bay racking Depends on the rack, check upright loads

Calculate your own loads

Distributed load

Take the weight of each machine, add tooling, material in process and people, then divide by the floor area it occupies. A machine of 8 tons on a footprint of 4 m² puts 2 tons on every m² under it. Between machines the load is lower, but the slab design has to cover the worst area.

Point loads

Look at the machine’s installation drawing. It states the weight and the size of each foot or the whole base. Divide the machine weight by the contact area under its feet, and compare it with what the slab can take. Heavy and precision machines usually come with a foundation drawing from the supplier, which tells you how thick and how reinforced the base must be.

Racking

A pallet rack puts all the weight onto the base plates of its uprights. Four levels of 1 ton pallets can load each upright with several tons over a very small area. Ask the rack supplier for the upright load and the base plate size, then compare with the slab design.

Forklifts

A loaded forklift concentrates its weight on four wheels, and the front axle carries most of it. Check forklift weight with load, not empty weight.

What to look at on the slab

Walk the floor with a torch and a tape measure.

  • Cracks. Fine hairline cracks are normal. Wide cracks, cracks with a step between the sides and cracks that run across a whole bay point to movement.
  • Joints. Saw-cut joints should be intact. Broken edges where forklifts cross them show heavy use or a weak slab.
  • Patches. New concrete in the middle of an old floor may hide earlier repairs. Ask what was fixed.
  • Settlement. Look at the area near the walls and the dock. Gaps between slab and wall, or water standing in one spot after rain, show movement.
  • Surface. A dusty, flaking surface wears quickly under traffic. A hardener or epoxy coat helps. See our guide to fit-out cost for what coating adds to the budget.
  • Flatness. Narrow-aisle racking and automated vehicles need a very flat floor. A standard slab may not meet it.

Looking for a factory now? Send my requirements

Putting a machine in a standard slab

Many tenants add a foundation for one heavy machine. The usual route is:

  1. The machine supplier sends the foundation drawing.
  2. A structural engineer checks it against the slab drawings.
  3. The landlord approves in writing, including permission to cut the slab.
  4. A contractor builds the base and records the work.

Get step 3 into the lease or a side letter. Also agree what happens at the end: do you remove the base and patch the floor, or leave it? Our guide to reinstatement at the end of a lease shows why this matters.

Some changes also touch the building’s approvals. If you add a mezzanine or heavy structure, ask the landlord whether a permit is needed before work starts.

Questions to ask the landlord

  • What is the design floor load, and where is it written?
  • What is the slab thickness, and is it reinforced?
  • Are the foundations on piles or on compacted ground?
  • Has the floor shown cracks or settlement, and has it been repaired?
  • Can I install a machine foundation, and who approves it?
  • Is there a record of past load, such as the last tenant’s machines?

Pair this check with height and power

Floor load goes together with other limits of the building. A slab that carries your presses is no use if the building has no crane or too little height for them. Read the clear height guide next, and use the ready-built factory checklist on every visit.

Load plans that fail in practice

Most floor problems come from small gaps between the plan and the day-to-day use. Watch for these.

  • Stacking above the rating. Teams stack pallets or coils one level higher than planned. Mark the maximum stack height on the floor.
  • Moving the machine, not the load. A press moved to a new bay stands on a part of the slab that was never checked.
  • Wheel loads on weak edges. Heavy forklifts or pallet trucks cross joints, covers and trench lids that were not made for them. Check trench covers and drain gratings, which often fail first.
  • Vibration. Presses and compressors shake the slab and nearby machines. Heavy vibrating equipment often needs its own isolated base.
  • Temporary loads. During fit-out, delivery trucks and cranes drive on the slab. Ask where they may go.

Add a floor plan to your lease file that marks the heavy zones and the agreed loads. It helps both sides at handover. A short note and photos, taken on day one, will also help when you hand the unit back. See the handover condition report for what to record.

Get a shortlist

Tell us your heaviest machine, its footprint and your racking plan, and we will check the slab data of each unit on site before it reaches your shortlist. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

What floor load is normal for a ready-built factory in Vietnam?

Listings often state a rating of about 2 to 3 tons per m² for general use, and higher for heavy units. Treat any figure as a claim until you see the design drawings or a written statement from the owner.

What is the difference between distributed load and point load?

Distributed load is weight spread over the slab, stated in tons per m². Point load is weight concentrated on a small area, such as a press foot or a rack upright. A slab can pass the first test and still fail the second.

Can I install a heavy machine on a standard slab?

Often yes, with a dedicated foundation or load-spreading plate designed for that machine. The landlord must approve it in writing, and the lease should say whether you restore the floor at the end.

Who checks the floor before I sign?

Ask the landlord for the structural drawings and slab specification. For heavy or precision equipment, hire a structural engineer to review them and inspect the slab before you commit.