What Clear Height Do You Really Get in a Rented Factory?

November 14, 2026

Clear height is the free vertical space under the lowest thing in the building: the beam, the truss, a duct, a light or a sprinkler pipe. It is always less than the height in the listing, which is often eave height. Measure it yourself at several points, because you cannot add height after you sign.

A factory that is one metre too low can stop a rack plan, a crane or a tall machine. The check takes ten minutes with a laser distance meter.

Three heights, three numbers

Term Where it is measured Use for
Ridge height Highest point of the roof Almost nothing inside
Eave height Wall top, where roof meets wall A rough guide, often quoted in listings
Clear height Under the lowest beam, truss or fitting Racking, cranes, machines

In a typical steel portal frame building, the roof slopes up from the eaves to the ridge. Clear height is lowest near the walls and highest in the middle. Ask which point the landlord’s figure refers to.

How to measure it on a visit

  1. Bring a laser distance meter, or a tape and a helper with a ladder.
  2. Measure under the beam at the column line, which is the lowest point in the bay.
  3. Measure again at mid-span, where the roof is higher.
  4. Measure under sprinkler pipes, light fittings, cable trays and ducts. Those are your real limit for racking.
  5. Check the height at the dock doors and at the main entrance.
  6. Photograph each reading with the meter visible.

Write the lowest figure and the highest figure. Compare the lowest one with your needs.

What needs height

Pallet racking

A standard pallet position uses about 1.5 m: the load, the pallet, the beam and a gap above. Four levels therefore use about 6 m, five levels about 7.5 m. On top of this, leave space below the sprinkler heads and the lights. Sprinkler rules set a required clearance between the stored goods and the heads. Ask the fire adviser or the rack supplier what applies in your case.

For taller racks, check floor load too, as rack uprights concentrate weight on small plates. See our floor load guide.

Overhead cranes

A crane needs height above the lifting hook. Tally the load height, the slings, the hook block and the crane girder itself. The usable hook height under the crane is often 1.5 to 2.5 m lower than the clear height of the building. Our guide to factories with overhead cranes covers this in more detail.

Tall machines and lines

Some machines have a stated minimum room height: large presses, extruders, tall CNC machines with open doors, spray booths and dryers. Check the installation drawing for working height, which includes maintenance and part removal, not just the machine’s height.

Mezzanines

A mezzanine splits the height. For a floor with people working above and below, each level needs a comfortable head height, and the building needs enough height in total. Add the thickness of the mezzanine structure. Also check whether the mezzanine needs a permit and a fire approval update before you build it. We cover this in mezzanine permits.

Lighting, ventilation and ducts

High-bay lights, fans and duct work hang below the roof. In a building with 8 m clear height, they can take another 0.5 to 1 m. For workplaces with dust, heat or fumes, more height also helps the air move. See our ventilation guide.

Typical heights you will see

Newer ready-built units in southern industrial parks are commonly listed at 8 to 10 m. Older units are often 6 to 8 m. The exact figure varies by developer and age. Treat all of these as a range seen on listings, not a promise for any building. Always measure.

Height and money

More height raises the rent per m², but it can lower your cost per pallet or per machine. A rack plan with five levels in 8 m height stores more than four levels in 6 m on the same floor area. Work out the rent per pallet position, not only per m².

If you only need height for one part of the plant, consider a cheaper low-bay building plus a small high-bay unit, or a building with a taller bay on one side.

Looking for a factory now? Send my requirements

Questions for the landlord

  • What is the clear height under the lowest beam, and under the sprinklers?
  • Are there any ducts, lights or pipes that lower it in certain bays?
  • Was the roof designed for hanging loads, such as a conveyor or a crane?
  • Is the height the same across all bays?
  • Can I put in a pit or a mezzanine, and who approves it?

Next steps

Height is one of five checks that decide a lease, with power, floor, crane and fire approval. Take the full ready-built factory checklist on your visit.

Common height mistakes

Tenants mostly lose height in three ways.

  1. Reading the listing as clear height. A listed 10 m may mean 10 m at the eave, with 8.5 m under the beam and 7.8 m under the sprinklers. Ask for the figure under the lowest obstruction.
  2. Forgetting the sprinkler and light layer. Racking plans drawn on a floor plan ignore the pipes and fittings above. Draw a section view with every layer.
  3. Planning to the top. Goods stored right up to the sprinklers are a fire risk and may breach the rules. Leave clearance, and ask the fire adviser how much.

A quick check helps: draw a simple section of your racking or machine on paper, add the clearances at the top and see whether it fits under the lowest point. If it fits with less than 0.3 m to spare, ask for a different bay or a different unit.

Height and the budget for the lease

Height links to cost in two more ways. A taller building usually has a stronger frame, which can mean a higher floor rating and better crane options. It also has a larger air volume, which makes the hall easier to ventilate but harder to heat or cool if you air-condition it. If you plan an air-conditioned zone, partition it down to a lower ceiling to save energy.

When two units have the same rent, the taller one is the better pick for racking and cranes. When the rents differ, run the numbers per pallet position or per lifted ton, not per m² of floor.

Record the readings

Keep one table for all units you visit, with the lowest and highest clear height, the height under the sprinklers and the hook height if there is a crane. You will compare five or six units over several weeks, and your memory of the numbers will blur. A single sheet with the same columns for every unit makes the choice quicker and gives you a record to show the landlord when you ask for a change.

Get a shortlist

Give us your rack plan or your tallest machine, and we will measure clear height at the beam in every unit on your shortlist. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

What is the difference between eave height and clear height?

Eave height is measured to the point where the roof meets the wall. Clear height is the free space under the lowest beam, truss, duct or light fitting. Clear height is always the smaller number and the one that counts.

What clear height do newer ready-built factories have?

Newer units in southern parks are commonly listed at 8 to 10 m, older ones at 6 to 8 m. Check each building, because the listed figure is often the eave height.

How much height does pallet racking need?

Count each pallet level plus beam and gap, then leave clearance below the sprinklers and lights. Four levels of standard pallets usually need more than 7 m of clear height. Ask the rack supplier for the exact figure.

Can I add height later?

No. You cannot raise a roof on a leased building. You can lower the working level with a pit, but this needs landlord approval and structural advice.