Renting a Factory With an Overhead Crane: What to Verify First
November 21, 2026
A factory listed “with crane” can mean four different things: a working bridge crane with papers, an old crane that has not run for years, crane beams with no crane or only a structure that might carry one. Check which one you are being offered, and check the capacity, the span, the hook height and the inspection records before you count the crane in your plan.
This guide covers an existing crane and the case where you add one later.
What to look at on an existing crane
Visit with the landlord or the last tenant’s maintenance person and ask for a demonstration under power.
Capacity and class
The nameplate on the crane states rated capacity in tons. Photograph it. Compare it with your heaviest lift, including the lifting beam, the slings and the mould or die being lifted, not just the product. Ask also about the duty class, which tells you how many lifts per hour the crane was designed for. A light-duty crane built for occasional lifts will not survive a shift of constant use.
Span and travel
The span is the distance between the two runway rails. The travel is how far the crane can run along the building. Both decide which parts of the floor you can reach. Mark the reach on the floor plan and compare it with your machine layout. Corners and the area under the end of the runway are often outside the crane’s reach.
Hook height
Hook height is the highest the hook can rise. It is lower than the clear height of the building, because the crane girder and hoist take up space. Compare it with the tallest lift, including slings. Our clear height guide explains how to measure the free space.
Condition
Run the crane through all motions: hoist up and down, bridge travel, trolley travel and the stop. Listen and look for:
- jerky movement or noise from the gearbox
- worn or frayed wire rope, or a stretched chain
- cracks or rust on the girder and the rails
- limit switches that do not stop the motion
- a pendant control or a remote that works in every direction
Records
Ask for the inspection certificate, the maintenance log and the manual. Lifting equipment in Vietnam is subject to occupational safety inspection rules. Ask a local adviser or the park management what applies to your crane, and who must hold the certificate. If the landlord has no records, treat the crane as uninspected and budget for a full inspection before you use it.
What a crane needs from the building
A crane places large loads on the structure. Check the following.
| Element | What to check |
|---|---|
| Columns | Designed to take the runway beam and the crane load, often with a bracket or a stepped column |
| Runway beams and rails | Straight, level, free of cracks, with end stops fitted |
| Foundations | Sized for the crane loads, not only the roof |
| Power to the crane | A conductor bar or cable festoon, with isolators you can lock out |
| Roof and walls | Designed for the extra bay height and wind loads |
If the crane is on a mezzanine or on crane columns inside the building, check that it does not block the dock or the fire exits.
Adding a crane later
Many tenants rent a plain unit and hope to add a crane. This works only when the structure has the capacity. Ask the owner:
- Was the building designed for a crane? What capacity and class?
- Can I see the structural drawings and calculations?
- Who approves modifications, and how long does approval take?
- Does the landlord build it or do I buy it?
- Who owns the crane at the end of the lease, and must it be removed?
For a crane that the building was not designed to carry, extra columns, new foundations and a stronger roof may cost more than the crane. In many cases the owner cannot allow it at all. Our site checklist lists the other structural items to check on the same visit.
Other lifting options
If the building cannot take a bridge crane, other tools may do the job:
- a freestanding gantry crane on its own rails
- a jib crane fixed to a column or the floor
- a mobile gantry on wheels
- a forklift, a hand pallet truck or an air skate for heavy moves
Each is cheaper and needs less approval than a bridge crane, but they reach less of the floor.
Looking for a factory now? Send my requirements
Fire and safety
A crane adds moving loads, wiring and sometimes a cab. If you fit a new crane or a cab, tell the landlord and check whether the fire safety approval for the building needs an update. Operators need training and the workplace needs safe procedures. A local safety adviser can set these up.
Cost points to settle in the lease
- The extra rent for the crane, and whether it drops if the crane fails.
- Who pays for yearly inspection and routine maintenance.
- Who pays for a major repair, such as a new hoist motor or rope.
- Insurance for lifting operations. See our guide to insurance for tenants.
- What happens to the crane at the end of the lease.
Match the crane to the floor
A heavy lift usually goes with a heavy machine, and both need a floor that can take the load. Read the floor load guide as well.
Before you rely on the crane
Run a short trial before you decide.
- Lift a load close to your heaviest, with the landlord’s operator present, and move it through the full reach.
- Check the crane stops where it should and the brakes hold.
- Check the pendant or remote works from every spot your operators will stand.
- Ask who the last operator was and what training they held.
- Check the electrical supply to the crane is from a switch you can isolate, and that the floor under the runway is clear.
If any item fails, ask the landlord to fix it before handover, and write the fix into the lease with a date. A crane that works on viewing day and fails in week two costs production time.
Which size of crane do you need
Pick the capacity from your heaviest regular lift, then add a margin. A crane working near its limit every day wears out sooner and is less safe. Think also about how many cranes you need. One crane serves one line at a time. Two lines that lift at the same time may need two cranes, or a crane plus a few jibs. The span you need depends on your layout: a crane that only covers the centre of the hall leaves the sides for forklifts.
Write down the three numbers you need: rated load, span and hook height under the girder. Send them to every landlord on your list. The replies will sort the units quickly, and you save visits to buildings that cannot meet them.
Get a shortlist
Tell us your heaviest lift, the span you need and whether you want a crane now or later. We check crane records and structure on site before a unit goes on your shortlist. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
Can I add an overhead crane to a ready-built factory?
Only if the structure was designed for it. Columns and foundations must carry the crane runway and the lifted load. Ask the owner for the structural drawings, and have an engineer confirm before you sign.
What crane capacity do ready-built factories usually have?
Units that include a crane commonly have a bridge crane of 3 to 10 tons, with larger sizes in heavy-industry buildings. The figure on a listing should be matched against the crane nameplate and the inspection record.
Who is responsible for crane inspection?
The party that operates and controls the crane, which is usually the tenant. Lifting equipment is subject to safety inspection rules in Vietnam, so agree in the lease who arranges and pays for inspection and what records the landlord hands over.
Does a crane change the rent?
Usually yes. A unit with a working crane and the right structure rents for more than a plain unit. Compare the extra rent with the cost of buying and installing a crane yourself.