Landlord or Tenant: Who Pays When the Factory Needs Repair?
November 21, 2026
In a factory lease the landlord normally repairs the structure and the building systems it owns, and the tenant repairs what it installs and the small damage from daily use. The exact line is whatever your lease says. Vietnam’s Civil Code 2015 sets default rules, including a duty on the lessor to keep the property fit for its use and to repair defects, apart from minor damage that custom puts on the tenant. Because factories differ so much from houses, a lease that only repeats the general rule leaves too much open.
This guide shows how to split the duties by building part. It is general information, not legal advice. Have a licensed adviser check the clause before you sign.
Start from the default rule
The Civil Code treats a lease as a duty on the landlord to keep the leased property in the agreed condition and suitable for its purpose for the whole term. It also lets the tenant ask for repair, a rent reduction or other remedies when the property loses usable value through no fault of the tenant. The tenant must return the property in the condition received, apart from normal wear, or in the condition agreed.
Two points follow:
- These are defaults. The parties can agree something different, and many factory leases do.
- “Minor damage” and “normal wear” are not defined by number. That is why a table in the lease helps.
A split that works for factories
The table below is a common starting point. Adjust it to your building and bring it to your lawyer.
| Part of the building | Usually the landlord | Usually the tenant |
|---|---|---|
| Roof sheets, gutters and structure | Repair and replace, including leaks that are not caused by the tenant | Damage caused by tenant works or equipment on the roof |
| Columns, beams, slab and foundation | Structural repair | Damage from overloads, impact or machine anchoring done without approval |
| Floor surface | Cracks from settlement or age | Surface wear from forklifts, spills and heavy dragging. Epoxy added by tenant |
| Walls, cladding and doors | Structural parts and external walls | Interior partitions and damage by tenant staff or trucks |
| Loading docks and levellers | Fixed structure | Dock levellers, seals and doors that wear with daily use, as agreed |
| Main electrical supply, transformer, main panel | Landlord or park owned equipment | Tenant owned sub-boards, cables and machine connections |
| Water supply and drainage to the unit | Main pipes and connections | Internal lines and equipment installed by the tenant |
| Fire detection and fire fighting systems | Systems installed with the building, as agreed | Extra systems installed by tenant, plus inspections tied to your use |
| Lighting, ventilation, fans | Existing roof vents and base fittings | Lamps and fans that wear out, plus anything installed by tenant |
| Fit-out items | Not applicable | All fit-out the tenant installed |
Tenants should resist a clause that makes them responsible for “all repairs and maintenance of the premises”. That wording shifts the roof and the slab onto you. If the landlord insists, ask for carve-outs for structure and for defects that existed at handover.
Record the condition on day one
Most repair disputes are really disputes about what was already broken. A signed handover report with photos protects both sides. It should cover:
- Roof condition, with photos after rain if you can
- Floor cracks and joints
- Wall and door damage
- Meter readings for power and water
- The working state of docks, lights, fans and fire equipment
Our guide on the factory handover condition report has a longer list. Attach the report to the lease.
Set response times and a notice process
A repair duty without a deadline is hard to use. Ask for:
- How to report. A named contact and a written method, such as email, with the landlord’s reply time.
- Urgent repairs. A short deadline for faults that stop production or risk safety, such as a roof leak over machines or a failed main breaker.
- Normal repairs. A longer period, such as 15 to 30 days, which the parties agree.
- Tenant self-help. If the landlord does not act after notice, you may carry out the repair at a reasonable cost and claim it back or set it off against rent. Check with your lawyer that the clause is allowed and that the notice steps are followed.
- Emergency access. The landlord’s right to enter for urgent repairs, with notice.
Include an agreed reduction or pause of rent if a repair duty on the landlord leaves part of the unit unusable for a stated number of days.
Looking for a factory now? Send my requirements
Special cases
Typhoon and flood damage. Decide who pays for damage to the structure and who pays for tenant contents. Insurance should follow this split. See tenant insurance for a factory.
Machine foundations and pits. If you cut the slab for a machine, you must restore it at the end unless the landlord agrees otherwise. Get approval in writing before you cut.
Roof penetrations. Exhaust stacks, solar panels and cooling units add holes and load. Ask for written consent, and agree who fixes leaks around them.
Power upgrades. The transformer or main supply may need replacing for your load. Agree in advance who pays and who owns the new equipment. Read transformer upgrade cost.
Park services. The park often looks after roads, drains and common utilities. Faults there are not the landlord’s to repair. Know who to call.
Cost sharing for large repairs
For big items, such as a full roof replacement, a fair method is to share by remaining term. For example, if the landlord replaces the roof in year 2 of a 5 year lease and the roof lasts 15 years, some leases let the landlord recover a small share only if the tenant requested an upgrade. In most cases, structural renewal stays with the landlord. If a landlord wants to pass big repair costs to you, ask for a cap per year and a share that falls with the remaining term.
End of lease
On handback, the landlord will compare the unit with the handover report. Repair clauses and reinstatement clauses work together. Agree what you must remove, what you may leave and what counts as wear. See reinstatement cost at the end of a factory lease.
Preventive maintenance: agree who does what and when
Many repair disputes start with a failure that regular care would have prevented. Agree on a simple maintenance plan:
- The landlord checks the roof, gutters and drains before each rainy season and after a typhoon.
- The tenant keeps drains inside the unit clear and reports leaks at once.
- The tenant services its own equipment and the shared equipment it uses, such as dock levellers, on a set schedule.
- Both sides keep a log of inspections and repairs with dates and photos.
- Fire systems are inspected on the schedule the fire rules and the insurer require, and the lease says who arranges and pays.
A log is cheap and settles many arguments. When the lease ends, it also shows that you kept the unit in good order.
Example disputes and how a clear clause helps
A roof leak damages stock. Who pays for the stock? If the lease says the landlord repairs the roof but excludes liability for tenant contents, the tenant’s insurance must cover the stock. Check this against your policy. A landlord who ignores a leak after written notice is in a weaker position, so keep the notice.
A forklift cracks the floor at the dock. If the damage is from impact, it is the tenant’s. If the slab was already weak, the handover report decides. Photos at handover settle it.
The transformer fails. If the landlord or the park owns it, they repair it. The lease should say how fast and who pays for a temporary supply. Production losses are usually excluded, so consider business interruption cover.
An old fan wears out. If the lease lists the fan as the landlord’s, the landlord replaces it. If you installed it, you do. A fixture list at handover avoids doubt.
Get a shortlist
When we visit a factory we note roof, slab and utility condition with photos, so you start from a known state. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
Who repairs the roof in a leased factory?
Usually the landlord, because the roof is part of the structure, unless damage is caused by the tenant. Write it in the lease and note the roof condition at handover so that old leaks are not blamed on you.
What counts as normal wear and tear?
Gradual ageing from ordinary use, such as faded paint, light marks on the floor and worn door hardware. Damage from impact, spills, overloaded floors or misuse is not wear and tear.
Who pays for repairs to the power transformer and main panel?
It depends on who owns and operates them. If they belong to the landlord or the park, they usually repair them. Tenant-installed equipment and your own sub-boards are yours. Ask for this to be written clearly.
Can I deduct repair costs from rent if the landlord does not act?
Only if the lease or the law allows it. Vietnam's Civil Code gives the tenant some remedies when the landlord ignores defects, but follow the notice steps in the lease before you deduct anything, and ask a lawyer first.