Will This Industrial Park Accept Your Business Line?
November 21, 2026
Not every factory in an industrial park can take every tenant. Each park has an approved plan, a developer and a management board, and they decide which industries the park accepts. A plant that makes cable harnesses will find almost any park open. A plant that runs plating, tanning or dyeing will find only a few. So the first check on any shortlisted unit is not the rent. It is whether your business line is allowed at that address.
This guide shows how the fit check works and what to ask. It is general information, not legal advice. Confirm your case with a licensed adviser or the park management board.
Why parks limit industries
There are three reasons.
Planning. An industrial park is approved by the authorities with a specific purpose. Decree 35/2022/ND-CP, which governs industrial parks and economic zones, also describes specialised parks, where a large share of the land is reserved for one sector. If a park is built for electronics, a foundry may not get in.
Infrastructure. The wastewater plant, the power substation and the fire services are built for an expected tenant mix. A park with a small treatment plant cannot take a plating line.
Neighbours. Developers keep a tenant mix that protects the park’s reputation. A food plant may not want a chemical plant next door, and the developer knows it.
Where the rules are written
You will not find a single national list of “allowed industries per park”. The information sits in several places, and you need to ask for each.
| Source | What it tells you |
|---|---|
| Park master plan and investment documents | The sectors the park was approved to attract |
| Park developer’s tenant rules | The developer’s own list of accepted and refused industries |
| Environmental papers of the park | What the wastewater plant and emissions limits can take |
| Your investment and enterprise registration | The business lines allowed to your company at that address |
| National rules on conditional sectors | Business lines where foreign investment has conditions |
The national investment law is the Law on Investment 2020 (Law 61/2020/QH14). It contains the list of sectors with conditional investment and the market access rules for foreign investors. Check the current text with your adviser, since the lists have been amended.
What the fit check involves
Do it in this order. It costs little and avoids the worst surprise.
- Write your business lines clearly. List the process steps, the materials, the chemicals, the daily water use and the waste. A one-line product name is not enough.
- Ask the developer. Send the description and ask in writing: “Is this process accepted in this park?” Ask the same of the park management board.
- Check the wastewater. Ask for the park’s discharge limits and ask whether your process fits.
- Check your registration. Make sure the business lines you list in your registration match what you will do on site. The address will appear in the registration.
- Check the environmental duty. Some processes need an EIA or a permit, which adds time. See our EIA guide for tenants.
- Get the answer in writing before you pay any deposit.
Typical fit questions by process
These are general patterns, not rules. Confirm every case with the park.
| Process | What to expect |
|---|---|
| Assembly, electronics, packaging | Accepted in most parks |
| Machining and metal fabrication | Accepted in most parks, check noise and coolant handling |
| Plastic injection | Accepted in most parks, check cooling water and power |
| Furniture and wood | Many parks accept, with limits on dust, spray finishing and fire load |
| Food processing | Accepted in some parks, with wastewater and hygiene checks |
| Textile dyeing, plating, tanning, chemicals | Limited to a small number of parks with matching treatment |
| Battery, paint, foam, recycling | Case by case, often with extra permits |
If your process is in the last two rows, start with the park and ask for a meeting before you visit units.
Looking for a factory now? Send my requirements
What can go wrong
The common problems are practical.
- You sign first and ask later. The park then refuses your process, or asks for a pre-treatment plant that costs more than the lease.
- Your registration lists too few business lines. An extra line added later takes more time, and may need a change to the registration.
- You change the process after the fit check. Adding a plating step to an assembly line changes your fit, your environmental group and your fire approval.
- The landlord says yes but the park says no. A private owner of a unit may not speak for the park. The park board and developer decide.
A short, written answer from the developer on your exact process is worth more than a verbal yes from the unit owner.
Put the fit check into the lease timeline
If you cannot get all answers before you must sign, protect yourself in the lease:
- Make the lease start, or at least the deposit release, depend on the park’s written acceptance of your process.
- Ask for a clause that lets you leave without penalty if registration is refused for reasons outside your control.
- Keep the first rent payment small until the papers are in hand. Our guide to factory lease clauses explains what to read first.
Sectors with extra rules
Defence, military, dual-use and some high-hazard products need extra approvals that go beyond the park. The same is true for certain regulated goods such as pharmaceuticals and some food products. Talk to a licensed adviser early if your product is in a regulated group.
Questions to put in the written request
When you write to the developer and the park board, a short, clear email gets a better answer than a phone call. Include:
- The company name, the country of the parent company and the planned Vietnamese entity
- The product, with a one-paragraph process description
- Estimated daily water use and wastewater type
- Chemicals, solvents, gases or hazardous materials used on site
- Expected headcount and shifts
- Expected size of the unit and whether you plan a mezzanine or a crane
- The planned start date
Ask three direct questions: Is this process accepted? Are there extra conditions? Who in the park signs off? Keep the reply. If the answer is “possible, subject to review”, ask what the review is and how long it takes.
Why the answer can differ between two units in one park
A park is not always uniform. Some parks have zones with different rules, for example a zone for export processing enterprises or an area reserved for a single sector. A unit near the wastewater plant may have different connection limits from one at the far end. Check the zone and the connection, not only the park name.
Landlords also differ. A park developer may lease through its own team and know the rules well. A private unit owner may repeat what the last tenant did without checking whether the rules changed. Treat the park board as the final source and the owner as a helpful guide.
Get a shortlist
We check the park’s accepted industries as part of the on-site check, and shortlist only units where your process fits. Send your requirements with a short description of your process and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
Can any manufacturer lease a factory in any industrial park?
No. Each park has an approved planning and often a list of target industries. Some parks accept only certain sectors, and some processes, such as heavy plating or chemicals, are limited to specific parks.
Where do I find the list of allowed industries for a park?
Ask the park developer and the park management board for it in writing. The list sits in the park's approved planning and investment documents. Do not rely on a sales brochure.
What happens if my business line does not fit?
The investment or enterprise registration for that address can be refused or delayed, and a lease signed before that point may leave you paying rent on a unit you cannot use. Check fit before you pay a deposit.
Does the fit check differ for foreign-owned companies?
It can. Vietnam has sectors where foreign investment is conditional or limited, and your registration lists the business lines. Ask a licensed adviser to check both the park fit and the foreign investment rules.