Guides / Locations
Binh Duong Industrial Parks by Cluster: A Tenant's Map
November 21, 2026
Binh Duong has four clusters of industrial parks that matter to a tenant. The southern cluster (Thuan An and Di An) is closest to the city and the oldest. The middle cluster (Thu Dau Mot and Tan Uyen) is the one most foreign tenants know. The northern cluster (Ben Cat and My Phuoc) offers larger plots and more units. The far north (Bau Bang) has the most land and the longest trip to the city. Pick the cluster first, then the park, then the unit.
One note on the name. Binh Duong is no longer a province. On 1 July 2025 it merged into Ho Chi Minh City, together with Ba Ria-Vung Tau. The parks did not move and most still carry the same names, but ward and commune names changed. In this guide “Binh Duong” means the area that people still search for.
The four clusters at a glance
| Cluster | Old district names | Parks often seen on listings | Usually suits |
|---|---|---|---|
| South | Thuan An, Di An | VSIP I, Song Than | Light assembly, electronics, packaging, small units near the city |
| Middle | Thu Dau Mot, Tan Uyen | VSIP II, VSIP III, Dat Cuoc, Nam Tan Uyen | Mixed manufacturing, mid-size units, foreign tenants |
| North | Ben Cat | My Phuoc 1, 2 and 3 | Larger units, wood, metal, plastics, logistics-heavy plants |
| Far north | Bau Bang | Bau Bang industrial park | Large floor area, heavy lines, tenants who can accept distance |
Park names above come from public listings and developer pages. Areas, availability and rents change, so treat the table as a starting map, not a catalogue.
South: Thuan An and Di An
This is where the Binh Duong industrial story started. VSIP I in Thuan An opened in 1996 and is one of the first Vietnam-Singapore industrial parks. Song Than in Di An is also among the older zones. Both sit right on the edge of the city, so trips to Cat Lai port, Tan Son Nhat airport and the city centre are the shortest in Binh Duong.
The trade-off is space and age. Plots are small, large vacant units are rare and many buildings are older. Rent per m² is usually higher than further north. Choose this cluster if your staff commute from the city, if you ship small and frequent loads or if your customers visit often.
Middle: Thu Dau Mot and Tan Uyen
The middle cluster has VSIP II and VSIP III (see the developer’s VSIP Binh Duong page), both run by the Vietnam-Singapore joint venture of Becamex IDC and Sembcorp. VSIP III was started in 2022 and extends into the Bac Tan Uyen area. Dat Cuoc and Nam Tan Uyen are smaller parks in the same belt. Our separate guide to Tan Uyen factories covers the inner and outer parts of this area.
This cluster suits tenants who want a managed park, foreign neighbors and a trip to the city that a plant manager can still make several times a week. Units tend to be newer than in the south and the parks have clear rules for utilities and waste.
North: Ben Cat and My Phuoc
My Phuoc 1, 2 and 3 are Becamex IDC parks and together cover several thousand hectares. Ben Cat is the cluster to look at when you need a larger unit or room to expand later. Many wood, furniture, metal and plastics plants sit here. The labor pool is deep, and the parks have their own utility systems.
The cost of this cluster is distance. A truck from Ben Cat to Cat Lai port takes noticeably longer than one from Thuan An, especially in the morning. Plan shipping windows with that in mind and ask current tenants what their typical trip is.
Far north: Bau Bang
Bau Bang is a large Becamex IDC park on National Highway 13, with more than 2,000 ha announced and a further expansion area. It is the right place for large floor plates and phased growth. It is also the furthest from the city and the airport, and the pool of skilled supervisors who live nearby is thinner. See the dedicated Bau Bang guide for the distance and labor trade-off.
Looking for a factory now? Send my requirements
How to choose a cluster
Answer five questions in this order:
- How big is the unit? Under 1,500 m² points south or middle. Over 5,000 m² points north.
- How often do you ship and to where? Port-heavy exporters feel every extra hour of trucking. Domestic or regional shippers feel it less.
- Who commutes? Check where your supervisors and engineers will live. A 90 minute commute loses staff.
- What is your power load? Ask the park, not only the owner, how much capacity is free. Our power supply guide explains what to ask.
- Does your business line fit the park? Parks have lists of accepted sectors. Confirm this before you visit.
Rent and terms by cluster
Public listings for ready-built units in southern parks sit at about US$4 to US$7 per m² per month, before VAT. Inside Binh Duong the pattern is simple. Units near the city and in the newest managed parks sit toward the top of that range. Units in the far north and in older buildings sit toward the bottom. These are typical ranges seen on public listings, not offers, and each owner sets the real number. The minimum term is usually 3 years, the deposit commonly 3 to 6 months of rent. Our rent cost guide shows the costs that come on top.
A common mistake: choosing by park name
Tenants often arrive with one park name from a customer or a competitor and look only there. A park name tells you the developer and the rules. It does not tell you the condition of a specific unit. Two buildings in the same park can differ by 2 m in clear height, have different transformers and carry different fire approvals. Start with the cluster that fits your logistics and labor, then compare units, not brands.
It also helps to ask which units are held by the developer and which by private owners or former tenants. Developer units come with standard contracts. Private owners may be more flexible on rent-free months and fit-out, but need more document checks.
What to check in any Binh Duong park
- Remaining land lease term. A park that has 15 years left cannot give you a 20 year lease.
- Current vacancy. Parks in the south often have no large units free. Ask for what is free now, not the master plan.
- Management board rules. Waste, wastewater, working hours for trucks and fire rules are set by the park.
- Address on the papers. After the merger, the commune or ward name on a lease may differ from the one on older documents. Ask the owner to show the current name.
Our ready-built factory checklist has the full site list, and the Binh Duong and Dong Nai comparison helps if you are still choosing between provinces. For park-by-park detail on one developer, read the VSIP guide.
Get a shortlist
Tell us the area, height, power, crane and move-in date you need and which clusters you would consider. We check factories on site and send up to 5 that fit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
Is Binh Duong still a province?
No. On 1 July 2025 Binh Duong merged into Ho Chi Minh City. People still search and talk about Binh Duong as an area, but new leases, licences and addresses use the Ho Chi Minh City administrative names.
Which part of Binh Duong is closest to Ho Chi Minh City?
The southern cluster around Thuan An and Di An. It has the oldest parks, the shortest trip to the city centre and the airport, and usually the highest rents in the area.
Can I find large ready-built units in the northern parks?
Larger plots and bigger units are more common around Ben Cat and Bau Bang than in the south. Availability changes by month, so ask for current units that match your area, height and power needs.
How many parks should I visit before choosing?
Visit units in two or three parks from at least two clusters. The differences in trucking time, labor and rent only become clear when you compare them on the same day.
Looking for a factory now?
Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.
Send my requirements