Guides / Locations
Renting a Factory in Tan Uyen: Inner Parks or Outer Parks?
November 21, 2026
Tan Uyen is the middle of the old Binh Duong industrial belt: far enough from Ho Chi Minh City to avoid the highest rents, near enough for managers to visit a few times a week. Its parks include VSIP II, VSIP III, Nam Tan Uyen and Dat Cuoc. The main decision is between the inner parks, closer to Thu Dau Mot, and the outer parks, toward Bac Tan Uyen. Inner parks save travel time. Outer parks give more land and usually a lower rent.
Binh Duong merged into Ho Chi Minh City on 1 July 2025. Tan Uyen is therefore now a part of the city, although people in the industry still call it Binh Duong. Ward and commune names changed in the merger, so rely on the park name and the land papers, not on an older district name.
The parks in and around Tan Uyen
| Park | Position | What to know |
|---|---|---|
| VSIP II | Middle | Large Vietnam-Singapore park, established 2006, with a wide tenant base |
| Nam Tan Uyen | Inner | Smaller park of about 330 ha, licensed in 2005 |
| VSIP III | Outer, toward Bac Tan Uyen | Newer, started in 2022, with space for larger plots |
| Dat Cuoc | Outer | Smaller park, established in 2007 |
Areas are rounded from developer and press descriptions. The developer’s VSIP Binh Duong page is the place to confirm the current phases of VSIP II and III. For a comparison of the VSIP parks by age, see our VSIP guide.
Inner Tan Uyen: why choose it
The inner parks sit closer to Thu Dau Mot and to the roads that lead south to Thuan An and the city. Commutes are shorter, more services are within reach and the trip to Cat Lai port is easier than from the far north. Buildings are a mix of newer and older ones.
The trade-offs are fewer large plots and rents higher than in the outer parks. If you want a unit between 1,000 and 5,000 m² and a good commute for city-based staff, this is where to start.
Outer Tan Uyen: why choose it
The outer area has newer parks and more open land. VSIP III has newer buildings and room for larger plots. Rents sit lower than in the inner parks. You give up a longer drive to the city and the ports.
For this reason outer Tan Uyen suits tenants who plan to grow, who can stand a longer commute for managers or who run a steady, high-volume plant where the extra trucking leg is a small share of cost.
What sets Tan Uyen apart
The Dong Nai river side. Tan Uyen borders Bien Hoa in Dong Nai province across the river. Some workers commute from there, and some trucks can use roads and bridges on the Bien Hoa side. This gives two labor sources and two route options, but bridges and approach roads can jam at peak hours.
Provincial roads. The area is served by provincial roads such as 746 and 747, which carry heavy truck traffic. Ask for a loaded truck trip, not a map estimate.
Foreign neighbors. VSIP parks have many foreign-invested tenants, which means a supplier base and service providers (maintenance, packaging, forwarders) that know foreign standards.
Rent and terms
Ready-built units in southern industrial parks are commonly listed at about US$4 to US$7 per m² per month, before VAT. These are typical ranges from public listings, not offers. In Tan Uyen the inner parks tend toward the middle or upper part of the range and the outer parks toward the lower part. The usual minimum term is 3 years and the deposit commonly 3 to 6 months of rent. See the cost guide for the charges on top.
A worked comparison (illustration only)
Numbers below are examples to show the method, not quotes. Suppose an inner-park unit of 2,000 m² is listed at US$6 per m² per month and an outer-park unit of the same size at US$5. The difference is US$2,000 a month, or US$24,000 a year, before VAT.
Now add the cost of distance. If the outer unit adds one hour of driver time for each of 10 container trips a month, and your own cost for that hour is more than US$200, the saving is gone. If you ship two containers a month, the saving stands. The same logic applies to a manager’s time and to staff turnover from long commutes. Put your own figures into the sum before you decide. Our cost guide shows how to compare two offers on one basis.
Looking for a factory now? Send my requirements
Papers and the 2025 merger
Two kinds of paper may show an old name. The land and building papers of the park may refer to the old district or commune. Your own business licence will list the address you register. Before you sign, ask the owner to show the current ward or commune name for the unit and agree in the lease that the owner will help with any address update. Do not assume the lease address and the licence address are the same. Our article on factory addresses after the province merger explains the order of steps, and a licensed adviser should confirm what your registration needs.
Staff commute and housing
Plants in Tan Uyen draw workers from the local area and from the Bien Hoa side, but a foreign plant still needs a plan for managers and engineers. Many live in Thu Dau Mot, Thuan An or Ho Chi Minh City and drive in. Ask the park about shuttle rules and parking, and visit the gate at shift change. For a method to judge labor supply around a park, see our guide on labor availability.
A checklist for Tan Uyen visits
- Confirm the park and phase. VSIP II and VSIP III are different parks with different ages.
- Ask who the landlord is. The developer, a private owner or a former tenant.
- Measure the commute. Time the drive from your likely staff housing at 7:00, not at midday.
- Check the trucking route. Ask which roads your trucks must use to Cat Lai and what happens in the rainy season.
- Ask about power. Read the transformer size in kVA and ask for the free capacity in the substation.
- See the fire papers. The building’s fire prevention approval should match your use.
- Confirm accepted industries. Each park has a list. Get the reply in writing.
Our ready-built factory checklist covers the full site inspection.
Lease length in Tan Uyen
The usual minimum term for a ready-built unit is 3 years. In a newer park with a long remaining land lease, owners often prefer 5 years and may offer rent-free months for fit-out in return. In an older park, check the remaining land lease first: a term longer than the years left is not possible. If you are unsure about volume, ask for a break option after the first period. Our guide to the land lease term explains why the park’s term caps yours.
Choosing between Tan Uyen and its neighbors
If you need a very large plot, compare with Bau Bang. If port time matters more than land, compare with Dong Nai, as in our Binh Duong and Dong Nai guide. If you want the overview of all four Binh Duong clusters first, read the cluster guide.
Get a shortlist
Tell us the area, height, power and crane you need, and whether you prefer the inner or outer side of Tan Uyen. We check factories on site and send up to 5 that fit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
Where is Tan Uyen?
Tan Uyen is in the middle of the old Binh Duong area, north-east of Thu Dau Mot and across the Dong Nai river from Bien Hoa. Since 1 July 2025 it has been part of Ho Chi Minh City.
Which industrial parks are in Tan Uyen?
Public listings show VSIP II and VSIP III, Nam Tan Uyen and Dat Cuoc among others. VSIP III extends toward Bac Tan Uyen. Confirm the exact location of any unit on the land papers.
Is Tan Uyen cheaper than Thuan An?
Usually yes. Units closer to the city ask for higher rents, and Tan Uyen is further out. The actual rent depends on the unit and the park, so compare offers on the same basis.
Can a Tan Uyen plant use Bien Hoa for labor and shipping?
Tan Uyen borders Bien Hoa in Dong Nai across the river, so some workers commute from there and some trucks route through the Bien Hoa side. Check bridge and road conditions on the day of your visit.
Looking for a factory now?
Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.
Send my requirements