Why the Park's Remaining Land Lease Caps Your Factory Lease

November 21, 2026

Your factory lease cannot safely run longer than the land lease under the building. In a Vietnam industrial park the State leases land to a developer for a fixed term. The developer or a later owner builds a factory and leases it to you. When the land lease ends, everyone below it loses their right to the land, whatever their own contract says. So the first date to check is the one on the land papers, not the one in your lease.

The chain of rights

Land in Vietnam belongs to the State. Everyone else holds a right to use it. In a ready-built unit the chain usually looks like this:

Layer Who What they hold What to check
1 State Land ownership Nothing for you to check
2 Park developer Land lease from the State for a fixed term End date, extension, how land rent was paid
3 Factory owner Land sublease or land use right plus the building The sublease contract, its end date and the right to lease on
4 You Lease of the building and the land under it Your end date against layers 2 and 3

In some units the developer owns the building and leases it directly. In others a company or investor bought or subleased the plot, built the factory and now leases it. A unit owned by a former tenant has one more layer. The more layers, the more papers you need to see.

Why the term matters in practice

A tenant normally wants a lease of three to ten years, with the option to renew. Land leases in industrial parks usually run for decades, so a young park gives you room. An older park may not. A park whose land lease has only eight years left cannot give you a lease that safely runs for ten.

Here is a simple example.

  • A park developer’s land lease ends in 2038.
  • A factory owner subleases land from that developer and builds a factory. Its sublease cannot reasonably run past 2038.
  • You sign in 2027 for a 10 year term, which ends in 2037. That fits.
  • You also want a 5 year renewal option, which would end in 2042. That does not fit, unless the land lease is extended.

The renewal option in the example is only as good as the extension behind it. The Land Law 2024 allows extension of land use terms in some conditions, but an extension is a decision by the authorities and not something the landlord can promise.

What happens when the land lease ends

The answer depends on the land papers, the investment licence of the developer and the terms of the extension, if any. Ask the landlord in writing:

  • Has the developer applied for an extension, or does it plan to?
  • What happens to buildings on the land at the end of the term?
  • Will tenants be told in advance, and how long before?
  • Does the lease give you a right to end it early if the land term is cut short or not extended?

Do not accept “we will always renew”. Ask for the answer on paper, then give it to your adviser.

Papers to ask for

  1. The land lease between the State and the park developer, or the land use right certificate that shows the term.
  2. The landlord’s own land sublease or ownership papers, if the landlord is not the developer.
  3. A letter from the developer or the landlord confirming the remaining land term at the date of your lease.
  4. The construction permit and the handover or completion papers for the building.
  5. For a sublease, the written consent of the head landlord. See subleasing a factory.

If any of these cannot be produced, the unit is not ready for a shortlist. See landlord papers and due diligence for the full set.

Does the way land rent was paid matter?

Land rent can be paid for the whole term in one payment or year by year. Under the Land Law 2024 this choice can change what a land user may do with its rights, including whether it may sublease. A landlord who paid annually may have fewer rights to lease on than one who paid for the whole term. We cannot tell you which case applies to a given unit. Ask the landlord how land rent was paid and ask your adviser whether the landlord is allowed to lease the unit to you for your full term.

Looking for a factory now? Send my requirements

Write the term into the lease

Once you know the remaining land term, write it into the contract.

  • State the land lease end date in the lease, and add a clause that the landlord confirms it is correct.
  • Make the lease term shorter than the land term. Keep a margin, since extensions and delays happen.
  • Make renewal conditional. Write that the renewal option applies if the land term is extended and the landlord can lawfully lease the unit.
  • Add an exit. If the land term is cut short, you should be able to end the lease and get the deposit back without penalty.
  • Write the hand-back date so that you have time to move out, ship machines and finish reinstatement before the land lease ends.

These points sit beside the other clauses in the lease agreement clause guide. For renewal rules in detail, see the lease renewal option guide.

A note on payback

Fit-out is spent once and paid back over the years you stay. A 3 year term and a 5 year term can both fit in the land lease and still differ a lot in cost per year. If you are putting in a cleanroom, heavy foundations or large utilities, ask for a term long enough to repay them, and check that the land term supports it. If it does not, either lower the fit-out budget or look at another park. The method in our ready-built factory checklist covers the other checks to run at the same visit.

Questions to ask the park developer

The developer knows the land term better than any tenant or sub-landlord. A short email with these questions often gets a clear answer.

  1. What is the end date of the park’s land lease, and has an extension been requested?
  2. Which plots inside the park are subleased on a fixed term, and which are sold or transferred with land use rights?
  3. If a plot owner leases a factory to me, what is the longest term you will accept for that plot?
  4. Do you charge a fee or need to approve a lease of a factory to a new tenant?
  5. What are the park’s rules on change of use, extensions to the building and new equipment on the roof?

Keep the reply. If the developer will not answer, the landlord should supply the papers instead.

When the remaining term is short

A short remaining term is not always a reason to walk away. It can mean a lower rent, and it may suit a company that wants a fast start with a plan to move in five years. In that case:

  • Keep fit-out light and movable. Machines and racking move. Poured foundations and built-in cleanrooms do not.
  • Ask for a rent level that reflects the shorter horizon.
  • Make sure the lease ends before the land term, with time to hand back.
  • Keep a second option in mind, such as a newer unit in the same area, so that you are not forced to move on short notice.

If your plan needs ten years or more, a short remaining term rules the unit out.

Get a shortlist

We read the land papers of each factory before it reaches your shortlist and note the remaining land term next to the rent. Send your requirements, including how many years you want to stay, and we reply within 24 business hours. Tenants pay nothing for the search.

Frequently asked questions

How long is the land lease of an industrial park in Vietnam?

Each park developer holds its own land lease from the State for a fixed term, often decades. The exact start date, end date and any extension are on the land papers, so ask to see them rather than relying on a general figure.

Can my lease be longer than the remaining land lease?

Treat the remaining land term as the practical limit. A lease that runs past it depends on an extension that is not guaranteed, so any renewal option should be conditional and clearly worded.

What should I ask for to confirm the land lease term?

Ask for a copy of the land lease or land certificate showing the end date, and a letter from the park developer or landlord stating the remaining term. Have a licensed adviser read the papers.

Does the way land rent was paid matter to me?

It can. Under the Land Law 2024 the rights of a land user to sublease depend partly on how land rent was paid, so ask your adviser to check that the landlord is allowed to lease the unit to you.