Skip to content
Send requirements

Guides / Legal

Subleasing a Factory in Vietnam: When It Is Allowed

November 21, 2026

A tenant in Vietnam may sublease a factory only if the landlord agrees. That is the rule in the Civil Code 2015 (Article 475), and most leases repeat it. A sublease cannot safely run longer than the head lease it comes from, and it carries the risks of the head lease. If you are the incoming tenant, the main checks are the head landlord’s written consent, the end date of the head lease and the sublessor’s own right to lease. This guide covers both sides: taking a sublease and granting one.

This is general information, not legal advice. Have a licensed adviser review the papers.

When subleases appear

Subleases are common in industrial parks for ordinary reasons.

  • A company leased a unit, then closed a line, downsized or moved, and wants to pass on the rest of its term.
  • An investor leased a whole building from a developer and splits it among several tenants.
  • A tenant has more space than it needs and sublets a part to an affiliate or a supplier.
  • A trading or logistics company holds a long lease and re-lets to manufacturers.

Subleases can be cheaper or quicker than a new unit, and sometimes they come already fitted out. They also add legal layers, so they need more checking.

The rules in plain terms

  1. Consent. The sublessor needs the head landlord’s agreement. Without it, the head landlord may treat the sublease as a breach, and the Civil Code lets a landlord end a lease where the tenant uses the premises outside the agreed purpose (Article 480). Check the head lease for any other limits on subleasing.
  2. Term. The sublessor cannot give more than it has. A sublease that runs past the head lease depends on the head lease being renewed.
  3. Land rights. In an industrial park the head landlord’s right to lease also rests on its land rights, which have a fixed term. See land lease term.
  4. Business. Leasing buildings as a business is regulated by the Law on Real Estate Business 2023, and the sublessor’s own status can matter. See the 2023 real estate law and factory leases.
  5. Registration. Your own investment and company registration lists the factory address, so the sublease should be a document the registration authority accepts as proof of the site. Ask your adviser.

Papers to ask for

Paper Why
The head lease, full text To see the term, use clause, rent and the subleasing rules
The head landlord’s written consent To prove the sublease is allowed
Land and construction papers of the building To check the right to lease exists
Fire approval and acceptance for the building To confirm the approved use
Recent utility bills and park fee invoices To see actual costs and any arrears
Proof that rent is paid up to date To avoid inheriting a default
The handover report and fit-out list To know what is yours and what must be removed

If the sublessor refuses to share the head lease, treat that as a reason to stop.

The main risks

Early end of the head lease

If the sublessor defaults on rent or breaches the head lease, the head landlord can end it, and your sublease may end with it. The Civil Code lets a landlord terminate where rent is unpaid for three consecutive periods in a periodic lease, unless the parties agreed otherwise (Article 481). You may not know the sublessor is behind.

Double charges

The head landlord may charge the sublessor for services, and the sublessor may pass on more than the actual cost. Ask for the invoices and how each charge is calculated.

Hand-back duties

At the end, the head landlord may require reinstatement of the whole unit. If you took over a unit with changes made by an earlier tenant, find out who is responsible for removing them. See reinstatement at the end of a lease.

Shared services

If you take part of a building, utilities, access and dock use are often shared. Write down meter arrangements, the power split and the rules for trucks. The standalone vs shared building guide covers this.

Ways to reduce the risk

  • Tripartite agreement. Ask the head landlord to sign a short document with you and the sublessor. It confirms the consent, the term and your right to stay if the sublessor defaults, as long as you pay rent directly to the landlord.
  • Direct payment. Pay the head landlord for the part of rent that belongs to the head lease, with the sublessor’s agreement.
  • Warranty and indemnity. The sublessor states that the head lease is valid, rent is paid and no breach exists, and agrees to compensate you if not.
  • Deposit rules. Keep the deposit in a form that can be returned if the head lease fails.
  • Exit right. Add the right to end the sublease if the head lease ends early, with refund of unused deposit and rent.

Looking for a factory now? Send my requirements

If you are the sublessor

You also have duties. Get the consent first, tell the incoming tenant the whole truth about the head lease, and check that the incoming tenant’s business fits the park and the fire approval. Keep your tax and invoice duties in order. If you are leaving Vietnam or closing the site, plan the exit with the early termination guide in mind, since a sublease is one of the routes out.

Taking over a lease versus subleasing

The two are different, and the difference matters for your risk.

Sublease Assignment of the lease
Who is your landlord? The sublessor, with the head landlord above The head landlord directly
Does the original tenant stay liable? Yes, to the head landlord Usually released, if the landlord agrees
Term Up to the end of the head lease Remaining term of the head lease
Consent needed Head landlord Head landlord, and often a new lease or amendment
Fits Taking part of a building or a short period Taking over the whole unit for the rest of the term

If you are taking over a whole unit, ask for an assignment or a new direct lease. It removes a layer. The head landlord may agree, especially when a creditworthy tenant is ready to take over. If you are taking only a part of a building, a sublease is the normal form.

Checking the sublessor

Treat the sublessor as you would any landlord. Confirm who they are, who signs and with what authority. Ask how long they have held the head lease and whether they have received any notice from the head landlord. Ask for recent rent receipts. A sublessor who is in a hurry to leave and cannot show clean papers may be selling you its problems.

Check that the sublessor’s own business registration allows it to lease buildings to others, and that it can issue proper invoices. Without correct invoices, you may have trouble with your own tax records. See landlord invoices and tax compliance.

A short checklist before you sign

  1. Read the head lease from start to end, including annexes.
  2. Get the head landlord’s written consent, signed by an authorised person.
  3. Compare the end date of your sublease with the head lease and the land lease.
  4. Check rent and fees against the invoices the sublessor pays.
  5. Confirm the building’s fire approval covers your use.
  6. Ask for a tripartite agreement or at least a comfort letter from the head landlord.
  7. Agree what happens to your deposit if the head lease ends early.
  8. Inspect the unit and sign a handover report that lists existing damage.

If any item cannot be completed, either fix it or choose another unit. The extra layer in a sublease is worth taking only when the papers are clear.

Get a shortlist

Most units we check are leased directly from the owner or the park developer. If a sublease is the better fit, we note the head lease end date and the consent status next to the rent. Send your requirements and we reply within 24 business hours. Tenants pay nothing for the search.

Frequently asked questions

Can a tenant sublease a factory in Vietnam?

Under the Civil Code 2015 a tenant may sublease the property only if the landlord agrees. Get that consent in writing and check the head lease for further conditions.

How long can a sublease run?

Treat the end date of the head lease as the limit. A sublease that outlasts it depends on the head lease being extended, which is not certain.

Is subleasing riskier than leasing from the owner?

It adds a layer. If the head tenant defaults or the head lease ends early, your right can end too. A written agreement with the owner reduces that risk.

Can I sublease part of my own factory to another company?

Only with the landlord's consent, and the other company needs the address to fit its own registration. Check the park rules as well.

Looking for a factory now?

Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.

Send my requirements

Keep reading