Skip to content
Send requirements

Guides / Locations

What Did the 2025 Province Merger Change for Factory Tenants?

November 21, 2026

On 1 July 2025 Vietnam cut its provincial-level units from 63 to 34. For factory tenants in the south, four changes matter: Binh Duong and Ba Ria-Vung Tau became part of Ho Chi Minh City, Binh Phuoc became part of Dong Nai and Long An became part of Tay Ninh. The parks, buildings and roads did not move. What changed is the name on the address, the authority that handles the paperwork and some of the labels you will see in older listings and contracts.

This guide shows the old and new names side by side and lists what to check when a document still uses the old ones.

Old names and new names

Old province Now part of Area people still search for
Binh Duong Ho Chi Minh City Thuan An, Di An, Ben Cat, Tan Uyen, Bau Bang
Ba Ria-Vung Tau Ho Chi Minh City Phu My, Tan Thanh, Cai Mep
Binh Phuoc Dong Nai Chon Thanh, Dong Xoai, Dong Phu
Dong Nai Dong Nai (now larger) Bien Hoa, Nhon Trach, Long Thanh
Long An Tay Ninh Ben Luc, Duc Hoa, Can Giuoc
Tay Ninh Tay Ninh (now larger) Trang Bang, Go Dau

Ho Chi Minh City is now a much larger unit than before. It runs from the old city centre north to Binh Duong and south-east to the coast at Ba Ria-Vung Tau. Tay Ninh keeps its name, but the administrative centre of the merged province is in the former Long An area. The Tuoi Tre report on the 34 units lists the new names and centres.

The reform also removed the district level of local government, so addresses written with a district name changed to a ward or commune under the new province. Old listings often still show “Ben Cat District, Binh Duong Province”. The same park may now carry a ward name inside Ho Chi Minh City.

What the merger does not change

The building and the park. A factory in an industrial park is still in the same place, on the same land, with the same power connection and the same developer.

Distances and logistics. Trucking time from Ben Cat to the port is the same as it was in June 2025. Only the label of the province on the map changed.

Your landlord and your lease. A lease is between you and the owner of the unit. We know of no rule that ends or changes a lease because a province was renamed or merged. Treat that as a question for your lawyer, not as a fact you can rely on without checking.

What can change in practice

Licensing contacts. Offices that handled your file may now sit in a larger unit with a different name, address or procedure. Management responsibilities for parks may also have moved to a different board after the merger. Ask the park which board covers it now and where tenants file their papers.

Minimum wage region. The regional minimum wage depends on the ward or commune where the employer is registered. Merged areas used mixed classifications. Check the current list in the wage decree for your exact location instead of assuming the old province rate. Our labor availability guide covers this in more detail.

Search and listing confusion. Brokers, maps and developer websites update at different speeds. The same park can appear under three province names. Always confirm the location by park name and by the developer’s own address.

Port and customs labels. Declarations, certificates of origin and customs registrations reference an address. Ask your forwarder and customs agent how they want the old and new address written, so documents match.

Documents to check in your lease

Go through these before you sign, and again if you already hold a lease with old names:

  • Lessor and lessee addresses. Use the full current address and add the old one in brackets, for example “Ben Cat area (formerly Binh Duong Province)”.
  • Property description. Describe the unit by park name, lot number and land certificate number, not by the province name alone.
  • A name-change clause. State that any change in administrative names or boundaries does not affect the lease or the rights of either side.
  • Land and building papers. Papers issued before July 2025 carry the old names. That is normal. Ask whether the owner has updated them and whether the landlord will help with notices of address change if the authorities need them.
  • Investment and enterprise registration. If you file an investment registration or enterprise registration for the factory address, use the form of address the licensing office currently accepts. Existing enterprises can generally keep their certificates, but confirm for your case.

Looking for a factory now? Send my requirements

How to write a search that still works

If you search listings in the south, use area names, not province names. “Factory for rent Ben Cat”, “factory for rent Nhon Trach” or “factory for rent Chon Thanh” find the right parks whatever the province is called this year. Our guides use old names as area names and say which province each area belongs to now. Compare the Binh Duong and Dong Nai areas or read about Phu My and Cai Mep if your cargo goes through the coast.

How to tell a good listing from a stale one

A listing that still says only “Binh Duong Province” may be an older post. That is not a problem by itself. It does mean the details deserve a second check:

  1. Ask for the date the listing was last confirmed.
  2. Ask for the current official address of the park, in the format the power utility and customs use.
  3. Ask for the lease form the landlord uses today and whether it uses the new names.

Reading an old listing: a worked example

Take a listing that says “Factory for rent, Ben Cat District, Binh Duong Province, 3,000 m²”. Read it in three steps.

  1. Ben Cat is the area. Keep this word. It is how people, forwarders and drivers still describe the place.
  2. Binh Duong is now part of Ho Chi Minh City. The park sits in a larger city, but the trip to Cat Lai or to a supplier in Thuan An is the same as before.
  3. The district no longer exists as a unit. Ask for the current ward or commune name and the park’s own address line, since that is what new documents will use.

Now do the same for “Tan Thanh District, Ba Ria-Vung Tau” (Ho Chi Minh City today), “Chon Thanh District, Binh Phuoc” (Dong Nai today) and “Ben Luc District, Long An” (Tay Ninh today).

Who to ask about what

Question Ask
Does my lease still read correctly? A licensed lawyer, with the lease in hand
Which office handles my investment or enterprise registration now? The licensing office, or a licensing adviser
Which board manages the park now and where do tenants file? The park management board
How should the address appear on customs papers? Your customs agent or forwarder
Which minimum wage region applies? The wage decree annex, checked with an HR or payroll adviser

None of these answers should come from a listing. Each one has an owner who can give it in writing.

Why the old names will stay in use

People searched for “Binh Duong factory” for years, and many buyers, forwarders and customers still use it. Park names rarely change, so a park keeps its name even when the province around it does not. Expect old and new names to run side by side for a long time. A good listing gives both. A good contract gives both too.

Get a shortlist

Tell us the area, power, height and move-in date you need. We check each factory on site and confirm the current park address and papers before we add it to a shortlist of up to five. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

Is Binh Duong still a province?

No. Since 1 July 2025 Binh Duong is part of Ho Chi Minh City, together with the former Ba Ria-Vung Tau province. People still say Binh Duong for the area, and its industrial parks are still where they were.

Do I have to change my enterprise registration because of the merger?

Ministry of Finance guidance from mid-2025 said existing business registration certificates stay valid and that businesses do not have to change their address wording only because boundaries changed. Confirm the current rule with your licensing adviser before you file anything.

Does the merger cancel an existing factory lease?

We know of no rule that ends a lease because a province name changed. The parties stay the same and the building stays the same. Ask a licensed lawyer to confirm for your contract, and add a clause that the new administrative name does not affect the lease.

Which province is Long An in now?

Long An merged into Tay Ninh province. The merged province keeps the Tay Ninh name, with its administrative centre in the former Long An area.

Looking for a factory now?

Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.

Send my requirements

Keep reading