Phu My and Cai Mep: Renting a Factory Next to the Deep-Sea Ports

November 21, 2026

Phu My is the place to look when the port is the most important thing in your supply chain. It sits next to the Cai Mep and Thi Vai deep-sea terminals, about 60 km from central Ho Chi Minh City by road. Since 1 July 2025 it has been part of the city, because Ba Ria-Vung Tau merged into it. A factory here can put a loaded container on a ship with a short truck trip. The trade-off is that the area is built around heavy and port-linked industry, with fewer ready-built light-industrial units and a smaller local labor pool than Binh Duong.

Where Phu My is, after the merger

Phu My used to be a town in Ba Ria-Vung Tau province. With the merger, the area became part of Ho Chi Minh City, and the district and town levels were removed. Phu My is now a ward of the city, formed by joining the old Phu My and My Xuan wards, with neighboring wards such as Tan Phuoc, Tan Hai and Tan Thanh nearby. A ward is the smallest unit, so ask the owner for the current form of the address. Our article on the merger and addresses explains the paperwork side.

For a tenant, the practical change is small: the parks are the same and the ports are the same. What changes is who administers the area and which name goes on the lease and on your registration.

The parks

Park Position Notes from public sources
Phu My I Phu My Listed with Phu My II at about 1,570 ha combined
Phu My II Phu My Listed together with Phu My I
Phu My 3 Phu My About 1,050 ha, described as specialized, with the Cai Mep-Thi Vai port about 2 km away

Sizes and distances come from investment directories and may be out of date, so confirm them with the park. One listing places Phu My 3 about 60 km from Ho Chi Minh City and about 28 km from the new Long Thanh airport. A “specialized” park accepts a defined set of industries, so confirm early whether yours is one of them.

What the location gives you

Port access. The Cai Mep and Thi Vai terminals handle large container ships on direct services to the US and Europe. A plant that ships mostly by sea gets the shortest road leg here. Our guide to Cai Mep port access explains the routes and how to test them.

Heavy industry neighbors. The area is known for port-linked, energy and heavy industry. A plant in steel products, large metal fabrication, chemicals or other heavy processes may find the park rules, power and wastewater already set up for it. Always confirm that your process is allowed.

Room. Large plots are available in the bigger parks.

What it costs you

  • Distance from the city. Visits, customer meetings and airport trips take longer. The new Long Thanh airport, if it opens as proposed, will be closer than Tan Son Nhat. See our airport parks guide.
  • Labor. Workers commute from Phu My, Tan Thanh and the Long Thanh area. A plant that needs hundreds of operators at once should test the market first. Our labor guide shows how.
  • Fewer ready-built units. Some parks lease land first. Ask what is free now.
  • Industrial neighbors. Heavy neighbors bring truck traffic and sometimes noise or odor. Visit on a working day.
  • Expatriate services. Housing, schools and clinics near the parks are more limited than in the city. Ask where managers would live.

Sector fit: ask first

Your business Likely fit What to confirm
Heavy fabrication, steel products, machinery Good to check Floor load, crane, power
Export plant shipping most containers by sea Good to check Truck time to the port gate
Chemical or high-pollution process Park-specific Accepted list and wastewater limits in writing
Light assembly, electronics or garment Check carefully Labor supply and whether the park accepts the use
Warehouse near the port Good to check Bonded or non-bonded status

Looking for a factory now? Send my requirements

Rent and terms

Ready-built units in southern industrial parks are commonly listed at about US$4 to US$7 per m² per month, before VAT. These are typical ranges from public listings, not offers. Units in Phu My vary with the park and the spec. The usual minimum term is 3 years and the deposit is commonly 3 to 6 months. See the cost guide for fees on top. Compare the full monthly cost including trucking: a lower rent far from the port can cost more than a higher rent beside it.

A trucking example (illustration only)

The numbers below are made up to show the method. Suppose you ship 40 containers a month. A site near the ports saves one hour of truck time on each trip compared with a site in the northern Binh Duong area. If the hour costs US$25 in driver, fuel and waiting time, the saving is about US$1,000 a month, or US$12,000 a year. If a unit near the city costs more than that per year in extra rent, the port site wins on this measure alone. Use your real container count and your forwarder’s trip price, and test both routes at the hour your trucks would run.

Ports also matter for imports. If you bring in machines, raw material or parts by sea, a short trip from the port to the factory lowers handling cost and risk. Ask your forwarder which terminal your lines use, because Cai Mep and Thi Vai serve different services.

Questions for the park management board

  • Which sectors and processes are accepted, and which need special approval?
  • What is the free power capacity and when would a new connection be possible?
  • Are there weight or width limits on roads and bridges to the gate?
  • What are the truck hours and gate rules for container trucks?
  • Which tenants are already there, and are any in a similar process?
  • Which ward or commune name should appear on the lease?

Checks in Phu My

  1. Sector fit. Get the park’s reply in writing.
  2. Floor load, height and crane. Heavy processes need figures, not descriptions.
  3. Power. Ask for the transformer size in kVA and the substation capacity. See our power guide.
  4. Wastewater and environmental limits. Heavier industries face stricter limits.
  5. Truck access. Check roads to the port gate and any weight limits on bridges.
  6. Remaining land lease. It must cover your term.

The ready-built factory checklist covers the full site visit.

Phu My or Dong Nai?

If you want a Dong Nai address near the airport, compare Nhon Trach and the Long Thanh area. If you want the shortest trip to the ports, Phu My is hard to beat on distance. If you also need a large workforce and city access, Binh Duong or Dong Nai may suit you better.

Get a shortlist

Tell us the area, height, power, crane and the port you ship through. We check factories on site and send up to 5 that fit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

Is Phu My part of Ho Chi Minh City?

Yes. Ba Ria-Vung Tau merged into Ho Chi Minh City on 1 July 2025, and Phu My, once a town in that province, is now a ward of the city. People still use the old province name when they search.

Why rent a factory in Phu My?

The Cai Mep and Thi Vai deep-sea ports are close. For a plant that exports in volume to the US or Europe, a short truck trip to the port gate can cut cost and time.

Are there many ready-built factories in Phu My?

The area is known for heavy and port-linked industry, and part of it is land plots. Ready-built units exist but are fewer than in Binh Duong. Ask for what is free now and the full spec.

What is the main downside of Phu My?

Distance from the city and a smaller local pool of factory workers. Many staff commute from Phu My, Tan Thanh and the Long Thanh area.