Skip to content
Send requirements

Guides / Locations

Nhon Trach for Factory Tenants: Which Parks and What to Check

November 21, 2026

Nhon Trach is an industrial area in Dong Nai province, on the south bank of the Dong Nai river, directly across from Ho Chi Minh City. It has around ten parks, a mix of ready-built units and land plots, and road links to the city, the Cat Lai port, the Cai Mep ports and the new Long Thanh airport. It suits tenants who want a Dong Nai address with a short route to the city and do not need to be in Binh Duong.

The trade-off is the road. Everything leaving Nhon Trach by truck crosses a bridge, a ring road or an expressway, and those are where delays happen. Test the trip before you commit.

Where the parks are

Nhon Trach is a district-sized area with a cluster of numbered parks. Names that appear on public listings include Nhon Trach 1, 2, 3, 5 and 6, Nhon Trach 2 Loc Khang, Nhon Trach 2 Nhon Phu, Nhon Trach Textile, Ong Keo and Phuoc An. The parks differ in age, developer and the sectors they accept. Nhon Trach Textile, as the name says, was planned for textile and garment plants. Others take mixed manufacturing.

Dong Nai removed the district level when it reorganised in 2025, so Nhon Trach is now a set of communes and wards inside Dong Nai province. Older papers and listings still show “Nhon Trach district”. Ask each owner to show the current commune name on the lease and on the land papers. Our guide to the 2025 province merger and factory addresses covers what to update.

Roads to the city, ports and airport

Destination Main routes to ask about What to test
Ho Chi Minh City and Cat Lai port Road 25B corridor, the Dong Nai river bridges, the Ben Luc-Long Thanh expressway Trip time at 7:30 and at 17:00 with a loaded truck
Cai Mep and Thi Vai ports Expressway and National Highway 51 toward Phu My Truck time to the port gate, not to the city
Long Thanh airport Roads toward Long Thanh Whether your visitors and air freight will use it
Bien Hoa National Highway 51 Commute for staff who live in Bien Hoa

Route names change as new sections open, so confirm which parts are finished when you visit. Our guides to Cat Lai port and Cai Mep port explain the port side in more detail.

The new airport

The Long Thanh International Airport had its first technical landing in December 2025. Commercial operation has been proposed for December 2026, with long-haul services moving in a later schedule. The Wikipedia page on Long Thanh airport tracks the current status. Check it before you rely on a date. Nhon Trach is closer to the airport than any Binh Duong park. For a plant that ships by air or hosts frequent visitors, that is a real advantage once flights start. Until then it is a plan, not a service. See our guide to parks around the airport for the parks nearest to it.

Labor

Nhon Trach draws workers from Nhon Trach itself, from Long Thanh and from the Ho Chi Minh City side across the river. Large foreign plants already employ many people, so recruiting for skilled operators and technicians means competing with them. Ask the park management board which sectors are already present nearby and what shift patterns they run. Rather than rely on a headcount figure from a landlord, visit the gate at shift change and watch how workers arrive. For a method, read our guide on labor availability around a park.

Rent and terms

Ready-built units inside southern parks are commonly listed at about US$4 to US$7 per m² per month, before VAT. These are typical ranges seen on public listings, not offers. Nhon Trach units fall inside this range, and where a unit lands depends on age, spec and the park. A new unit with a dedicated transformer and 9 m or more of clear height sits higher. An older unit with shared power sits lower. The usual minimum term is 3 years and the deposit is commonly 3 to 6 months of rent. See the cost guide for the charges that come on top.

Looking for a factory now? Send my requirements

Checks that matter in Nhon Trach

  • Flood and drainage. Parts of Nhon Trach are low and near rivers. Ask about the floor level of the unit against the road and look at the drainage after rain. Our guide on flood risk lists what to look for.
  • Power. Ask for the transformer size in kVA and whether it is dedicated to the unit.
  • Wastewater. Confirm the park plant accepts your process water.
  • Business line fit. Some Nhon Trach parks were planned for textile or light industry. Check the accepted list.
  • Remaining land lease. Verify the years left on the park’s land lease against your term.

How Nhon Trach compares with its neighbours

Question Nhon Trach Binh Duong middle and north Long Thanh and Phu My
Closest to the city Short route, but over a river crossing Direct road, more congestion in the south Further out
Closest to Cai Mep Medium Longer Shortest
Plot and unit size Mixed, several thousand m² available in some parks Wide choice, large units in the north Check current availability of ready-built units
Airport access Nearest once Long Thanh opens Tan Son Nhat side Nearest to Long Thanh

The table is a way to frame the decision, not a ranking. A plant that ships mainly to US and EU buyers through Cai Mep will weigh the right column more heavily. A plant that supplies customers inside Ho Chi Minh City will lean to the first two.

A one-day visit plan

Tenants who fly in for two days get more from Nhon Trach if they plan the route. Start at the park gate at shift change and watch how workers arrive. Visit two units in two different parks, one older and one newer. Drive from the second unit to your port of choice with a truck driver or a local logistics contact and note the time. End the day at the park management board office with your list of questions on power, wastewater and accepted industries.

On day two, ask the owners for the papers you noted: the construction permit, the fire prevention approval and the sublease or land use documents. Our ready-built factory checklist has the full list. We can run this route for you before you travel and send photos and notes.

When Nhon Trach is the wrong choice

Nhon Trach is the wrong choice if most of your staff or your key customers are in Binh Duong, or if you need a port gate time that only the Cai Mep side can give. Then compare with the Binh Duong and Dong Nai guide or look at the Phu My area.

Get a shortlist

If Nhon Trach is on your list, tell us the area, height, power and crane you need. We check the factories on site and send up to 5. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

Which province is Nhon Trach in?

Dong Nai. Nhon Trach lies south of the Dong Nai river, across from Ho Chi Minh City. The province was enlarged in 2025 when Binh Phuoc merged into it, but Nhon Trach itself did not move.

Is Nhon Trach good for exporters?

It suits exporters who ship through the Ho Chi Minh City ports or the Cai Mep route, because it sits between the two. Trucking time depends on the park and on traffic, so test the route during working hours.

Are there large ready-built factories in Nhon Trach?

Some parks have units of several thousand square metres. Availability changes often, so ask for what is free now and for the spec in writing.

Does the new airport affect rents in Nhon Trach?

Owners often point to the Long Thanh airport when they set asking rents. Treat that as a claim to test: compare the unit with others in the same park and ask for the actual rent on recent leases.

Looking for a factory now?

Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.

Send my requirements

Keep reading