Industrial Parks Around Long Thanh Airport: Timing and Access

November 21, 2026

Long Thanh is an area of Dong Nai province, east of Ho Chi Minh City, where the new Long Thanh International Airport is being brought into service. The industrial parks there are mostly Long Duc and newer parks planned or started around it. A tenant should treat the airport as a future benefit with a dated timeline, not as something already running. The factory still has to work on road access, power, labor and rent today.

The airport timeline in plain terms

Date What happened or is proposed
December 2025 First official technical landing at the airport
1 December 2026 Commercial opening proposed by the aviation authority
From March 2027 Long-haul international flights proposed for the summer schedule

The December 2026 opening and the 2027 long-haul phase are proposals in public reports, not guarantees. The Wikipedia entry on Long Thanh International Airport is updated as the schedule changes. Read it before you plan a move around a date. For a plant that mostly ships by sea, none of this is critical. For one that ships high-value parts by air or hosts frequent overseas visitors, it matters a lot.

Which parks are near the airport

Public listings and recent news point to these names:

  • Long Duc. An established park in the Long Thanh area, developed with Japanese partners. It is the one most foreign tenants hear about first.
  • Long Duc 3. A newer park of around 244 ha. Reports from August 2025 said construction was about to start, so check whether any ready-built units exist yet.
  • Long Thanh. A park carrying the area’s name, with its own management board.
  • Other new parks. Several large parks near the airport were reported as planned or under construction. Many are land plots and may not have ready-built units yet.

If you need to start production within a year, a park under construction is probably not the right one. A ready-built unit has to exist, with power and a fire approval, before it can be leased. Our ready-built factory checklist lists the papers to ask for.

What the location gives you

Airport. Once flights start, Long Thanh parks are the nearest to a major international airport in southern Vietnam. For now, Tan Son Nhat is still the airport most visitors use, and the trip from Long Thanh to the city can be long in traffic.

Roads. The area sits on National Highway 51 and close to the Ben Luc-Long Thanh expressway, with a connection toward the Ho Chi Minh City to Long Thanh to Dau Giay expressway. Road projects open in sections, so ask which parts are open on the day of your visit.

Cai Mep route. The deep-sea ports at Cai Mep and Thi Vai are reached from the Long Thanh area by National Highway 51 and the Phu My side. For US and EU exports this can cut the long feeder trip through Ho Chi Minh City. Our guide to Cai Mep port access goes into the detail.

Land. Parks near the airport are newer and, in several cases, still have open land, which suits tenants who want room for a second phase.

What it does not give you

  • A big skilled labor pool next door. Workers commute from Long Thanh, Nhon Trach and Bien Hoa. Competition from other plants is real. See our guide to judging labor supply around a park.
  • City convenience. Supermarkets, schools and hospitals for expatriate staff are fewer than near Ho Chi Minh City. Ask where staff would live.
  • A guaranteed price advantage. Owners know the airport story and may price a unit above similar ones. Compare units on the same basis, using the method in our cost guide.

Rent and terms

Ready-built units in southern parks are commonly listed at about US$4 to US$7 per m² per month, before VAT. These are typical ranges from public listings, not offers. A new unit close to the airport side may ask for the upper half of that range. The minimum term is usually 3 years and the deposit commonly 3 to 6 months. Longer terms can lower the rate per m².

Looking for a factory now? Send my requirements

Who Long Thanh suits

Tenant Fit Why
Exporter to the US or EU by sea Good to check Cai Mep route can shorten the port trip
Plant with frequent overseas visitors Good to check Airport saves a long drive once it runs
Plant that supplies customers in Ho Chi Minh City Weaker Trips to the city are long and traffic-dependent
Tenant needing a large skilled workforce at once Weaker Labor is shared with many other plants
Tenant planning phased growth Good to check Open land in newer parks

Use the table as a prompt for your own numbers. A plant with 300 workers and a tight start date has different needs from one with 40 workers and a long ramp-up.

Using the airport story in a negotiation

You can turn the owner’s airport pitch into a lever. If the owner asks for a premium because of the airport, ask for terms that match the uncertainty:

  • A longer rent-free period for fit-out if the unit is new.
  • A rent that steps up only after the commercial opening is confirmed, instead of a high flat rate from day one.
  • A cap on yearly increases.
  • A break option after the first period, so you can leave if the benefits do not appear.

Not every owner will agree, but those who believe their own story often accept a step-up that depends on it. See our guide to rent escalation clauses for the wording to ask for.

Timing risk: the “buy the airport” trap

Some tenants sign a long lease at a premium because they expect flights to change their business. Ask three questions before you accept that logic:

  1. Will your products ship by air in the first three years?
  2. Will your customers fly to Long Thanh instead of Ho Chi Minh City?
  3. Would the unit still be right for you if the airport opened a year late?

If the answer to the third is no, look for another site. A factory should pay for itself on trucking time, labor and rent, with the airport as a bonus.

What to verify in any Long Thanh park

  • The remaining land lease term of the park.
  • The power supply: transformer size and the park’s free capacity.
  • The fire prevention approval of the unit, for the use you plan.
  • The commune or ward name on the current address after the 2025 mergers. Our article on the merger and factory addresses explains what to update.
  • The accepted sectors list of the park.

If you are weighing Long Thanh against Nhon Trach, read our Nhon Trach guide.

Get a shortlist

Tell us what you need and when you must start. We check factories on site, including whether a unit is really ready to lease, and send up to 5 that fit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

Is Long Thanh airport open?

The first technical landing took place in December 2025. Commercial operation was proposed for 1 December 2026, with long-haul services in a later schedule. Check the airport operator's latest notice before you plan around a date.

Which province is Long Thanh in?

Dong Nai. Long Thanh is a former district of Dong Nai, now reorganised into communes and wards. Dong Nai was enlarged in 2025 when Binh Phuoc merged into it.

Will rents near the airport rise?

Owners often price in the airport. Compare any asking rent with other units in the same park and ask what recent leases signed for. Public listings for southern parks stay around US$4 to US$7 per m² per month.

Is a Long Thanh unit good for exports by sea?

It can be, because the Cai Mep ports are reachable by road from the Long Thanh area. Test the trucking time to the port gate during working hours.