Guides / Legal
Can You Run an Export Processing Enterprise in a Leased Factory?
November 10, 2026
An export processing enterprise (EPE) can operate in a leased factory, but only if the site meets customs conditions, and a normal multi-tenant building often cannot. The main test is physical: the EPE area must be separated from the outside by a hard boundary, with controlled gates through which all goods pass. If your unit shares a wall, a yard or a gate with a domestic tenant, the plan may fail before it starts.
This guide covers the site and lease side of EPE status. It is general information, not legal or tax advice. EPE rules touch customs, tax and investment law, and they change. Confirm with a licensed adviser and the local customs office.
What an EPE is
Vietnam treats companies that produce only for export, or provide services for export, as export processing enterprises. Decree 35/2022/ND-CP, which governs industrial parks and economic zones, defines the concept and sets conditions for an EPE to operate in an export processing zone or in an industrial park. An EPE receives different customs and tax treatment from a normal domestic company. In general terms, imports for its export production and exports of its products are handled under a special regime. Details are in customs and tax law.
The status is set up in the enterprise’s investment registration. It is a choice. Many exporters operate as normal enterprises with an export business, and use customs schemes such as processing and production for export.
Why the site matters
Customs must be able to control goods going in and out of an EPE. That is why the rules look at the site. In general terms, customs checks that:
- A hard fence or wall separates the EPE area from the outside
- Goods enter and leave only through designated gates
- The gates can be supervised, often with cameras and records
- The EPE does not use its tax-favoured assets for other activities
Customs inspects the site and confirms that the conditions are met before the enterprise starts. The rules were revised in 2025, including changes to how goods moving between EPEs and domestic companies are treated, so ask for the current text rather than an older guide.
For a tenant, this turns a lease question into a design question. Can the unit be separated, and who will build the separation?
Where it works and where it does not
| Situation | EPE fit |
|---|---|
| Standalone building on its own plot with a perimeter fence | Often feasible |
| Unit in a park zone already set up for EPEs | Usually the simplest route |
| Unit in a shared building with a common yard and gate | Often not feasible |
| Unit on a small plot with a shared access road | Needs design work and landlord consent |
| Warehouse or logistics unit | Depends on the business line and customs view |
Some parks have a dedicated EPE area. Ask the park management board if there is one, and whether units in it are available.
What to ask the landlord and the park
- Is the unit inside a park area where EPEs are allowed?
- Is there a fence now? Who built it and who owns it?
- How many gates are there and who controls them?
- May the tenant build or change the boundary and gates? Under what approval?
- Are other tenants nearby using the same road or yard?
- Has another EPE operated at this address? Under what customs approval?
- Will the landlord and the park cooperate with customs checks?
Get the answers in writing. A friendly yes in a site visit does not help when customs asks for evidence.
Lease clauses that matter
- Consent to fence and gates. The landlord agrees in writing to the boundary works, including design and location.
- Ownership and removal. The fence is the tenant’s fixture or the landlord’s, and the lease says who removes it at the end. See reinstatement at the end of a lease.
- Condition tied to approval. The lease start, or at least the full rent, depends on customs confirmation that the site meets the conditions. If it fails, you can exit without penalty.
- Access for customs. The landlord allows customs access and inspection where it affects the site.
- Use restriction. The landlord will not rent neighbouring space in a way that breaks the boundary, such as a shared gate for a domestic tenant.
- Change of status. If you give up EPE status, the lease still stands and the boundary works are handled as agreed.
Our guide to factory lease clauses covers the standard terms around these.
Looking for a factory now? Send my requirements
Tax points to raise with your adviser
EPE status affects the tax treatment of imports, exports and domestic sales, and also how the landlord’s rent and fees are invoiced. A landlord’s invoice to an EPE may be treated differently from an invoice to a domestic company, and the correct VAT approach depends on facts. Do not assume the rent is quoted before or after VAT in the same way. Ask your tax adviser to confirm, and ask the landlord to agree to the correct treatment in the lease. See also VAT on factory rent.
Do you need EPE status at all?
Many manufacturers do not. Consider it if:
- All or nearly all of your output is exported
- Your imported materials are large in value and customs treatment matters for cash flow
- You can accept restrictions on domestic sales and on shared use of the site
Skip it, or delay it, if:
- You plan to sell part of your output in Vietnam
- The unit is in a shared building that cannot be fenced
- You want the shortest start-up, since EPE set-up adds steps
Many tenants start as a normal enterprise and review EPE status later. Check whether changing status later is allowed for your registration, and what it costs.
Timeline risk
EPE steps run beside the lease: investment registration with EPE status, site works, customs inspection and system set-up. Ask for a rent-free or reduced-rent period that covers these steps. See rent-free periods in factory leases. Do not plan a first shipment until customs confirms the site.
A step list for a tenant considering EPE status
- Decide the business case. Ask your adviser what you gain and what you give up compared with a normal enterprise.
- Shortlist units that can be fenced. Prefer standalone buildings or units in an EPE area.
- Ask customs early. A short meeting with the local customs office tells you what they expect on the site.
- Negotiate the lease with the conditions in it. Use the clauses above.
- Apply for the investment registration with the EPE status, as your adviser directs.
- Build the boundary and gates to a design that meets the conditions.
- Have customs inspect and confirm before you start.
- Set up records and systems for the goods in and out, as the rules require.
Each step can take time. Keep the lease flexible until step 7 is done.
Questions for customs and your adviser
- Is a unit in a multi-tenant building ever accepted, and under what conditions?
- Can the landlord’s existing fence count, or must we build our own?
- Which gate arrangements are allowed for trucks and staff?
- What records and systems must we keep?
- What happens to the boundary if we later give up EPE status?
- How are domestic sales treated and what limits apply?
Write down the answers and the date. Rules and local practice change, so a note from one year ago may not hold now.
Get a shortlist
If EPE status is part of your plan, tell us. We check whether a unit has a perimeter and controlled gates, and ask the park about EPE use before it reaches your shortlist. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
What is an EPE in Vietnam?
An export processing enterprise is a company that makes goods only for export or provides services for export, and operates in an export processing zone or in a defined area under customs supervision. It has its own customs and tax treatment.
Can I be an EPE in a normal industrial park unit?
It can be possible, but customs sets conditions on the site, such as a physical boundary and controlled gates. A multi-tenant building often cannot meet them. Ask the park, the landlord and customs before you sign.
Who pays to fence the unit?
It depends on the lease. The fence is usually a tenant cost, but it needs the landlord's consent, and the lease should say who owns it and who removes it at the end.
Can an EPE sell some goods in Vietnam?
Sales to buyers in Vietnam are treated differently from export sales and carry customs and tax consequences. Customs rules for goods moving between EPEs and domestic companies changed in 2025, so confirm the current treatment with an adviser.