Skip to content
Send requirements

Guides / Locations

EPZ or EPE: Does Export Processing Status Matter for Your Factory?

November 11, 2026

Export processing enterprise (EPE) status is a customs and investment regime for companies that produce mainly for export. It treats the site as outside Vietnam’s normal customs territory: goods moving between an EPE and the rest of Vietnam are handled as imports and exports, and the site must meet customs supervision conditions. Most tenants do not need it. It matters when nearly all of your output is exported and your inputs are imported, and when the saving in customs handling outweighs the extra rules.

This guide explains the basics in plain terms. It is not tax advice. Confirm the details with a licensed adviser and with customs.

EPZ and EPE: two terms

Export processing zone (EPZ). An area set up for export-oriented production, with a fence, a controlled gate and customs supervision. Ho Chi Minh City has older zones such as Tan Thuan and Linh Trung. These zones are mature and mostly full.

Export processing enterprise (EPE). A company that is registered and approved as an EPE, either inside an EPZ or in a separate part of an industrial park. Under Decree 35/2022/ND-CP, an industrial park may include a subdivision for EPEs. See the English text of Decree 35/2022/ND-CP.

So a modern tenant meets EPE status more often as a company status inside a park than as a zone with a famous name.

What EPE status means in practice

Based on the decree and customs guidance, the main points are:

  • The investor commits to customs conditions. The EPE application includes a commitment to meet customs inspection and supervision conditions.
  • Customs certifies the site before operation. After the site is built, customs must certify that it meets the conditions before the enterprise starts operating as an EPE. Without it, the enterprise does not get the free trade zone treatment.
  • The site is treated as a non-tariff area. Trade between an EPE and the rest of Vietnam is treated as an import-export relationship. An EPE can sell into the domestic market, but those goods are taxed under the customs rules.
  • Incentives follow the registration. EPEs receive the incentives set for free trade zones from the date the EPE objective is recorded in the investment certificate or EPE certificate.

The practical conditions usually include a clear physical boundary, a controlled gate and records that customs can check. The customs office confirms the final list for each site, so ask the local office.

When EPE status may help

  • Almost all output is exported and almost all inputs are imported, so few goods move into the domestic market.
  • Your volumes are large and steady, so the savings on customs handling matter and the extra record keeping is manageable.
  • The park already has an EPE area with the fence, gate and customs procedures in place.

When it may not

  • You sell a meaningful share in Vietnam. Each sale from an EPE to a domestic buyer is treated as an import by the buyer, which adds work.
  • You subcontract to other local factories often. Goods moving in and out of the EPE need customs paperwork each time.
  • You plan to use the factory for mixed purposes such as a showroom, a trading line and production.
  • The landlord’s unit is not in an EPE area. Fencing and customs conditions can be hard to add in a multi-tenant building.
  • Your volumes are small. The compliance work may outweigh the benefits.

Many exporters use other customs schemes for processing and production for export without becoming an EPE. Ask your customs agent which scheme fits your product and volume.

Questions for the landlord and the park

  1. Is this unit inside an EPE area or an export processing zone?
  2. If not, does the park allow an EPE inside a unit, and is a fence and gate possible?
  3. Which customs office covers the park, and have other tenants gone through certification here?
  4. Who pays for the fence, gate and any customs equipment?
  5. What happens to the lease if the customs certification is refused? Can you exit or change the unit?
  6. Does the lease allow you to change status later if your sales mix changes?

Put the answers to questions 4 and 5 in the lease. Our EPE requirements guide goes into customs conditions for a leased site.

Looking for a factory now? Send my requirements

The order of steps

EPE status is not something to sort out after you move in. A sensible order is:

  1. Decide with your adviser whether EPE status fits your sales mix.
  2. Choose a park or a unit that can support it.
  3. Check the lease for the right to build the needed boundary and gate.
  4. Include the EPE commitment in your investment registration application.
  5. Complete the customs certification before operating as an EPE.

Our lease and investment registration guide covers how the lease fits into the licensing sequence.

A simple decision table

Your situation Likely direction
More than nine tenths of sales leave Vietnam, steady volumes Ask an adviser whether EPE status pays off
Sales split between export and domestic Usually a normal enterprise
Just starting, volumes unknown Normal enterprise first
Unit is in a park with a marked EPE area EPE becomes easier to set up
Unit is in a multi-tenant building without a boundary EPE is hard to arrange

The first row is a rule of thumb for the conversation, not a legal threshold. Your adviser will know the current conditions.

Why the landlord’s view matters

Landlords of ready-built units usually think about a normal tenant. An EPE tenant asks for fences, a controlled gate and sometimes extra camera coverage, and customs officers visit the site. Some landlords agree gladly, some refuse and some agree for a higher deposit. Ask early. Also ask what happens at the end of the lease: you may have to remove the fence and gate, or the landlord may keep them.

Put it in the lease:

  • The right to build and operate the boundary and gate.
  • Who owns them at the end of the lease.
  • That the landlord cooperates with customs inspections.
  • An exit right if the certification fails for reasons outside your control.

Recent customs guidance

Customs issues instructions on goods supplied to EPEs from time to time. A February 2026 customs dispatch, for example, addressed procedures for goods supplied to EPEs. Rules like this change, so ask your customs agent for the current guidance instead of relying on an older article.

If you are unsure, start without it

Many tenants begin as a normal enterprise and consider EPE status after they see their real sales mix. A normal enterprise keeps more flexibility. The decision is easier with a few months of data, and landlords usually prefer a tenant who knows what it needs.

Get a shortlist

If you plan an EPE, say so in your request. We ask landlords and parks whether the unit can support it, and check the site on site before it reaches your shortlist of up to five. Send your requirements and we reply within 24 business hours. Tenants pay nothing. For a wider view of how parks differ, read about industrial parks and industrial clusters.

Frequently asked questions

What is the difference between an EPZ and an EPE?

An export processing zone (EPZ) is a defined area with its own rules, such as the older zones in Ho Chi Minh City. An export processing enterprise (EPE) is a company that mainly produces for export and meets customs supervision conditions, and it can be in a zone or in a marked area of an industrial park.

Do I need EPE status to export from Vietnam?

No. Most exporters operate as normal enterprises and use customs schemes for processing or production for export. EPE status is a choice for companies whose output is almost all exported.

Can any leased factory become an EPE?

Not automatically. EPE status needs customs supervision conditions at the site, and the location must be acceptable. Ask the landlord, the park and the customs office before you sign.

Looking for a factory now?

Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.

Send my requirements

Keep reading