KCN or CCN: What Is the Difference for a Foreign Tenant?

November 21, 2026

An industrial park (KCN) is a large, developer-led area with shared power, roads, wastewater treatment and a management board. An industrial cluster (CCN) is a smaller area, generally 10 to 75 hectares, set up mainly for small and medium production. For a foreign tenant renting a ready-built factory, a park is usually the lower-risk choice, because the papers, services and approvals are easier to check. A cluster can work, but you must verify more yourself.

This guide explains the difference in plain terms and gives you a checklist for each.

Two names, two rule books

The abbreviations come from Vietnamese: khu cong nghiep (KCN) and cum cong nghiep (CCN). They are not the same legal category.

  • Industrial parks fall under the rules for industrial parks and economic zones. Decree 35/2022/ND-CP is the main decree. The English text on Luat Viet Nam sets out park types and management.
  • Industrial clusters fall under Decree 32/2024/ND-CP, which replaced earlier cluster decrees. Law firm summaries describe a cluster boundary within 10 to 75 hectares.

Rules are updated from time to time, so confirm the current text with your adviser or the park authority.

Side by side

Point Industrial park (KCN) Industrial cluster (CCN)
Typical size Many hectares to thousands of hectares About 10 to 75 hectares
Who develops it A park developer, often a large company A developer or an infrastructure investor, often a local company
Management A provincial park management board A local authority and the cluster investor
Main purpose Manufacturing and logistics at scale, including foreign-invested projects Small and medium production, and moving small workshops out of residential areas
Infrastructure Usually a central wastewater plant, power substation, roads, security Required by law, but quality varies
Ready-built factories Common, from many developers Fewer, usually smaller units

Why the difference matters to a tenant

Wastewater. Environmental law requires every industrial cluster to have rainwater drainage and a central wastewater treatment system. In practice the build-out varies. A Dong Nai provincial report found that investment in treatment and collection for whole clusters was very limited in some cases, and that some clusters were carved out of areas that already held factories, which made drainage hard to plan. See the Dong Nai government article. Ask to see the plant and its operating papers.

Power and water. Parks often have a dedicated substation and a tested supply. In a cluster, ask the transformer size, who owns the line and how outages are handled. Small clusters share a smaller feed.

Papers. Check that the cluster itself was established by a decision of the competent authority, that the infrastructure investor holds the land use right, and that the unit was built under a permit. The Dong Nai report mentions a cluster where companies operated while the technical infrastructure was not built and the establishment decision had not been approved. That is the kind of risk a paper check catches.

Investment fit. A foreign project needs an investment registration at an address where the site is legal for the use. Some clusters were designed for local production. Ask the licensing office whether your project can be registered at that address before you pay a deposit. Our business line fit guide explains the order of checks.

Fire safety and services. Parks often have their own fire brigade access, security and a management board that answers tenant questions. A cluster may not. Check fire approval for the unit using our fire safety guide.

Rent. Cluster units are sometimes listed at lower rent than park units. That can be a real saving for the right process, but price the extra checks and the risk before you count it.

A checklist for a cluster

Before you visit a unit in a cluster, ask the landlord for:

  1. The decision that established the cluster, and its current area and status.
  2. Proof that the cluster has a working wastewater plant, with its operating papers.
  3. The land use right paper for the unit and the construction permit.
  4. Fire prevention approval and acceptance for the current use.
  5. The transformer size and a recent power bill.
  6. A written statement of which authority handles tenant questions and fees.
  7. A letter from the licensing office, or at least a phone-call note, confirming that your business line can be registered at this address.

If the landlord cannot supply items 1 to 4, stop. It is not worth more of your time.

Looking for a factory now? Send my requirements

A checklist for a park

For a unit in an industrial park, use the standard checks in our ready-built factory checklist plus:

  • The park’s allowed industry list.
  • The remaining land lease term of the park.
  • The management fee and what it covers.
  • The wastewater plant’s capacity and discharge limits for your process.

What about an “industrial area” listed on a map?

Some listings use “industrial area” or “industrial zone” loosely for a group of factories on industrial land that was never formally set up as a park or cluster. Treat these as a third category: land outside an approved park or cluster. The legal and licensing risks are higher. See our guide on factories outside industrial parks.

How to tell what you are looking at

Listings often skip the category. You can find it in three ways:

  1. Look at the name. Names with “KCN” or “Industrial Park” are parks. Names with “CCN” or “Industrial Cluster” are clusters. “Industrial Zone” in English is used for both, so do not rely on it.
  2. Look at the size. A site of a few dozen hectares with a few dozen factories is more likely a cluster. A site of hundreds of hectares with a gate house, a management office and a wastewater plant is a park.
  3. Ask who manages it. A park has a management board. A cluster has an investor and a local authority. The answer shows where to go with problems.

What the difference means for the lease

Park leases are often on a standard form from the developer, with clear fee schedules. Cluster leases are more often one-off documents from the owner. Read cluster leases more slowly. Check the deposit return, the repair split and what happens if the cluster’s status changes. Our landlord papers guide covers the checks on the owner’s side.

A note on change of status

Rules for clusters have been updated in recent years. A cluster that was set up under older rules may be reviewed or adjusted. Ask whether the cluster is on the current plan of the province and whether any expansion or change is planned. A site that is removed from the plan is a risk for a multi-year lease.

When a cluster makes sense

A cluster unit can fit when your process is small, clean and not tied to a park’s industry list, when the cluster’s papers all check out, and when the rent saving is large enough to cover the extra due diligence. For most foreign-invested first factories, a park remains the easier route.

Get a shortlist

Tell us what you need and whether you will consider clusters. We check each factory on site, including the papers, and send up to five. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

What is the difference between KCN and CCN?

KCN (khu cong nghiep) is an industrial park, usually large, with a developer, shared infrastructure and a management board. CCN (cum cong nghiep) is an industrial cluster, smaller and mainly meant for small and medium production, set up and managed under a separate decree.

Can a foreign company rent a factory in an industrial cluster?

It may be possible, but it depends on the cluster's planning and the investment authority's view of your project. Confirm with the licensing office and a licensed adviser before you sign.

Which is safer for a first factory, a park or a cluster?

For a first factory, a park with a developer, a wastewater plant and a management board is usually easier to check and to license. A cluster can still work if its papers and infrastructure pass the same checks.

Looking for a factory now?

Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.

Send my requirements

Keep reading