How to Lease a Large Factory in Southern Vietnam
November 21, 2026
A large factory (10,000 m² and above) is available in southern Vietnam, but supply is thin and the details matter more than in a standard unit. The three issues that decide a large lease are the power connection, the land and expansion room and how the lease is staged. A phased lease with an option on neighbouring space is often better than taking all the area on day one.
What counts as large
In listings, most ready-built units for rent fall between about 500 and 10,000 m². Above that, you are in a different market:
- Single large buildings of 10,000 to 30,000 m² built by park developers.
- Blocks of connected units that can be joined or leased together.
- Built-to-suit projects on a plot with the developer building to your spec. See built to suit vs ready-built.
Whichever form you choose, expect fewer choices and longer decisions.
Where large sites are
Large buildings cluster in the bigger, newer parks where developers hold land for multiple buildings:
- Dong Nai. Nhon Trach and Long Thanh have big plots and good road links to the ports and the new airport. Binh Phuoc, now part of Dong Nai province, adds further land at lower cost and longer distances.
- The Binh Duong area, now part of Ho Chi Minh City. Ben Cat, Bau Bang and parts of Tan Uyen hold large buildings and still have room for more.
- Long An, now part of Tay Ninh province. Larger plots and lower land cost on the western side, with a longer haul to the ports.
- Phu My and Cai Mep, now part of Ho Chi Minh City. Large sites near the deep-sea port, mainly for logistics-heavy and export users.
Inner Ho Chi Minh City has very little large industrial space.
What drives the cost
The rate per m² for large units tends to sit lower in the US$4 to US$7 range seen on public listings. The reasons are scale and term: the landlord fills a big area for a long time with one tenant.
But the total bill is large, so small items count:
| Item | Why it matters at scale |
|---|---|
| Rent escalation | A small yearly rise on 10,000 m² is big money over the term |
| Management fee | A few cents per m² per month adds up |
| Deposit | 3 to 6 months of rent is a large amount of cash |
| Rent-free months | Each month free is worth the full monthly rent |
| Power upgrade | Cost sharing can reach a high amount |
Large tenants have more bargaining power, so use it. Our cost guide lists the levers, and the same ideas apply with higher stakes.
Power for a large plant
Power is the main risk for a large factory. A standard unit has a transformer sized for light industry. A large plant with heavy machines, furnaces, injection moulding or air compression can need much more, and the supply may need a new connection from the grid.
Ask these questions early:
- How many kVA does the building have today, and is it dedicated to the unit?
- What is the park’s spare capacity at its substation?
- How long does a connection or upgrade take, and who applies for it?
- Who pays, and how is it recovered in the rent?
- Is there a backup option if the park supply has outages?
A power plan written before you sign is worth far more than a promise made after. See reading the power supply.
Phased leases and expansion options
Most large tenants do not need the full area on day one. Three structures help:
Phased handover. You lease 6,000 m² now and 6,000 m² in month 12. The landlord holds the second block and you pay rent on each block from its handover date.
Right of first offer or first refusal. The landlord must offer you neighbouring space before leasing it to someone else. This protects your growth path. Agree how long the right lasts and how rent is set.
Expansion option. A fixed right to take an adjoining unit or plot at a pre-agreed price formula. Stronger than a first offer, and usually harder to get.
Write the dates, the rent for each phase and the penalties for late handover into the lease. Without them the landlord can lease the space to another tenant. See lease renewal options for related terms.
Land, access and site layout
Large plants need room outside the building:
- Truck yard and turning space for container trucks, with more than one gate if volume is high.
- Parking for workers’ motorbikes, which becomes a big area at a few thousand workers.
- Fire access around the building, as required by the fire approval.
- Room for a wastewater plan if your process creates it, with the park’s plant able to take the volume.
Ask for the site plan and walk the whole boundary, not only the building.
Looking for a factory now? Send my requirements
Labour and housing
A large plant means hundreds or thousands of workers. Check the labour pool in the district and whether other large employers compete for the same people. Worker housing and transport matter too. Read labour availability around a park before you commit to a location.
Approvals and papers
Large projects often need more approvals, from the investment registration to the environmental and fire prevention steps. The size of your project and your sector can change which steps apply. Ask a licensed adviser what applies to your project, and ask the landlord what is already in place for the building.
How to compare large sites
Score each site on the same lines: power available, expansion room, rent and escalation, handover date, truck access, labour and the quality of the papers. A site that is weak on power or expansion is out, whatever the rent.
A timeline for a large lease
Large leases take longer to agree than small ones. A realistic plan has these steps:
- Early brief. Area, phasing, power, docks, yard and handover dates. Allow flexibility on location.
- Market check. A first search shows which parks have a building of the right size and which would need a build.
- Site visits. Visit with your engineers, not only managers, since power, floor and fire details matter most.
- Heads of terms. Rent, escalation, phasing, rent-free, deposit and handover are agreed in principle.
- Due diligence. Review land and building papers, fire approval and the power plan.
- Lease and fit-out. Full contract, then fit-out in stages.
Because a large project also needs registration, power and often environmental approvals, start earlier than you think. See the setup timeline for how the steps overlap.
Questions for the landlord of a large building
- How many kVA does the building have and what is the spare capacity in the park?
- Can the building take an overhead crane, and what spans and capacities are possible?
- What is the floor load and the clear height under the beams?
- Which parts of the building share fire compartments?
- Is the yard big enough for the truck volume you plan?
- Which adjoining buildings or plots can be added later?
- What happens to the rent if handover is late?
- Who pays for a connection upgrade?
Large areas look good on paper, but the best-fitting building is the one that matches your process, not the one with the most m².
Get a shortlist
Large requirements need an early start. Send your requirements with the area, phasing, power and handover date. We reply within 24 business hours, check the sites on site and send a shortlist of up to 5. There is no fee for tenants.
Frequently asked questions
Are there ready-built factories over 10,000 m² in southern Vietnam?
Yes, in some parks, often as a block of several connected units or a single large building by a park developer. Supply is thin, so a large requirement usually needs an early search and some flexibility on location.
What is a phased lease?
A lease that starts with part of the area and adds more on agreed dates or triggers. You pay for what you use at each stage, and the landlord holds the rest of the space for you. The terms must be written into the contract.
Is rent per m² lower for large units?
Usually yes. Large areas and long terms get a lower rate than small units, and the landlord has more room to negotiate on rent-free months and escalation.
What power does a large factory need?
It depends on the process. Heavy machining, plastics and metal forming can need a dedicated connection well above what a standard unit has, and a new connection can take months. Ask for the available kVA and the upgrade timeline before you shortlist.