How Much Does Electricity Cost for a Factory in Vietnam?
November 16, 2026
A factory in Vietnam pays for electricity by the kWh, at a tariff that changes with your supply voltage and the time of day. Peak hours cost much more than off-peak hours, and a higher supply voltage gets a lower rate. The exact rates are set by the state utility, EVN, and are revised from time to time, so this guide does not give a single number. It shows how the bill is built and how to estimate yours before you lease.
The three things that set the bill
1. The tariff group. The published retail tariff has separate lines for production users. They are grouped by supply voltage, from below 6 kV up to 110 kV and above. Higher voltage means a lower price per kWh. A ready-built unit in an industrial park is usually fed from a medium-voltage line and a transformer, so you will normally fall in a middle group. Check the voltage level on the current tariff table on the EVN website.
2. The time of day. Production tariffs have three bands: peak, normal and off-peak. In April 2026 the Ministry of Industry and Trade moved the peak band into the evening (Decision 963/QD-BCT). The new bands take effect together with a retail price adjustment, so for a while some bills may still follow the old schedule.
| Band | New schedule, Monday to Saturday | Old schedule, Monday to Saturday | Sunday (new) |
|---|---|---|---|
| Peak | 17:30 to 22:30 | 9:30 to 11:30 and 17:00 to 20:00 | No peak hours |
| Normal | 6:00 to 17:30 and 22:30 to 24:00 | 4:00 to 9:30, 11:30 to 17:00 and 20:00 to 22:00 | 6:00 to 24:00 |
| Off-peak | 0:00 to 6:00 | 22:00 to 4:00 | 0:00 to 6:00 |
The peak rate is much higher than the normal rate, and the off-peak rate is well below it. The change matters for shift planning: under the new schedule a day shift runs almost entirely at the normal rate, while an evening shift falls into peak hours. Ask the utility or the park which schedule your meter is billed on before you budget.
3. Your load profile. A plant that runs a second shift into the evening will have peak hours inside its working day. A plant with a night shift can move heavy loads into off-peak hours. A plant that runs 24 hours spreads across all bands.
Other items on the invoice
- Reactive power charge. If your power factor falls below the threshold in the supply contract, a charge applies. Motors, compressors and welding machines lower the power factor. Capacitor banks in the electrical room fix it. Ask whether the unit already has them.
- Metering and transformer losses. If you share a transformer or are metered at the low-voltage side, losses may be allocated to you. Ask how the meter is placed.
- Park markup or service fee. Some parks buy power from the utility and bill tenants with a small addition. Ask for a sample invoice.
- VAT. Electricity invoices carry VAT. Ask your tax adviser which rate currently applies.
How to estimate a monthly bill
You need four numbers: connected load, how much of it runs on average, working hours and the average price per kWh.
- Average draw in kW. Take the machine list with the rated power of each item. Multiply by a utilisation factor, since machines do not all run at full load at once. Your equipment suppliers can usually give typical figures.
- Hours per month. Shift length multiplied by working days.
- kWh per month. Average draw multiplied by hours.
- Blended price. A weighted mix of normal, peak and off-peak, based on when you run.
An illustration, using made-up round numbers, not a quote: a plant averaging 300 kW over 16 hours a day, 26 days a month, uses 124,800 kWh. If the blended price is VND 2,000 per kWh, the bill is about VND 250 million, which is roughly US$9,600 at an exchange rate of 26,000 VND per US dollar. At 2,000 m² and US$5.50 rent, that is close to the monthly rent of US$11,000. For electronics, plastics and metal plants, power is often as large as rent, so it belongs in your comparison from the start.
Replace the blended price with the real rates from the current EVN table, and ask the park for a recent invoice from a tenant with a similar process.
What the unit must be able to supply
A bill estimate only helps if the unit can deliver the power. Compare these with your plan:
- The transformer size in kVA and whether it is dedicated to the unit. Read our guide to factory power supply in kVA.
- The incoming voltage and the main switchboard rating.
- The spare capacity after your peak load, with a margin for growth.
- The time and cost to upgrade, and who pays. See transformer upgrade cost.
A unit with a transformer that is too small can force a delay of several months while a new connection is built. Raise it before you sign.
Looking for a factory now? Send my requirements
Ways to lower the bill
- Shift heavy loads to off-peak hours when your process allows it, for example batch heating, charging or compressor-heavy tasks.
- Fix the power factor with capacitor banks.
- Choose efficient motors and drives for fans, pumps and compressors.
- Reduce lighting load with LED lighting, and use roof skylights where the roof allows.
- Ask about rooftop solar. Some parks and landlords allow it, others do not. Check that the lease permits roof installation, who owns the system and what the structure can carry.
None of these is free, so set the saving against the cost and the lease term.
Questions for the landlord and the park
- At which voltage is the unit supplied, and what is the tariff group?
- Am I billed directly by the utility or through the park? With what markup?
- What is the transformer rating, and is it dedicated?
- Is there a backup feed or a generator, and how often did the park lose power last year?
- What is the lead time and cost to increase capacity?
- Can I see a recent power invoice for a tenant of my size?
Link to the rest of your budget
Power is one of several costs added to rent. For the full list, see our factory rent cost guide and the water and wastewater guide.
Meters, read dates and billing cycles
Small points in billing can cost money, so ask about them before you sign:
- Where is the meter? At the transformer, at your switchboard or at the park’s intake. The meter position decides who pays for losses in cables and the transformer.
- Who reads it and when? A read date at month end matches your accounting. A read date mid-month means two partial months in your cost reports.
- Is there a sub-meter for your unit? In some parks a single utility meter serves several tenants, and the park splits the bill. Ask for the formula and the right to check sub-meter readings.
- When is payment due? A late payment can lead to a power cut-off notice, which is a serious risk for a running plant. Check the cure period.
- What deposit does the utility or park ask for? Some require a deposit for a new connection, based on expected monthly use.
Backup power
Most industrial parks have a stable supply, but outages and voltage dips happen, and a few minutes of lost power can scrap a batch in injection moulding, plating or food processing. Ask the park how often tenants lost power in the last year and how long each outage lasted. If your process cannot stop, plan for a generator or a UPS. Check whether the unit has space and an approved location for a generator, whether the lease allows it and whether the landlord needs to approve the fuel storage. These items sit in fit-out, so include them in your budget.
Get a shortlist
Tell us your connected load, shifts and any heavy equipment, and we check the transformer, switchboard and supply on site for each factory we put on your shortlist. Send your requirements and we reply within 24 business hours. Tenants pay no fee.
Frequently asked questions
How is electricity priced for factories in Vietnam?
Production users pay a per kWh tariff set by the state utility. The rate depends on the supply voltage and on the time of day: normal, peak and off-peak hours each have a different price.
What are the peak hours?
The bands were revised in 2026. Under the new schedule peak hours are 17:30 to 22:30 from Monday to Saturday and off-peak is 0:00 to 6:00, with no peak on Sundays. The new bands apply from a retail price adjustment, so confirm which schedule is on your bill with the utility.
Does a higher supply voltage lower the tariff?
Yes. The published production tariff is lower for users connected at higher voltage levels. Most ready-built units in parks are supplied at medium voltage through a transformer.
Can the park charge more than the published tariff?
Some parks resell power and add a small charge. Ask whether you are billed at the regulated rate directly or through the park, and what extra items appear on the invoice.