Canteen, Toilets and Motorbike Parking: Do They Fit Your Headcount?

November 21, 2026

The facilities for workers decide how easy it is to run a shift, and most listings say little about them. A unit can look perfect on power and floor load and still fail on a basic point: nowhere to park 200 motorbikes, one small toilet block for 300 people or no place to eat. Size each facility from your headcount and check it against what the unit and the park provide.

Start with your numbers

Before you visit, write down:

  • peak headcount on the largest shift
  • number of shifts and the overlap at shift change
  • share of women and men
  • expected share of workers who ride motorbikes, use a bus or walk
  • office staff and visitors on a normal day

Without these numbers, a visit becomes a general impression. With them you can compare units on the same basis.

Parking

In most plants in southern Vietnam, most workers commute by motorbike. Parking therefore means mostly motorbike space, with a smaller area for cars and a clear route for trucks.

Plan figures. Allow about 1.5 to 2 m² per motorbike including the aisle. Cars need much more per vehicle. These are planning figures, so use your own measure if you have one.

Workers riding in Motorbike area (about)
100 150 to 200 m²
300 450 to 600 m²
500 750 to 1,000 m²

Check on the visit:

  • How much yard do you control? Parking outside the lease boundary may be shared or not allowed.
  • Is it covered? A roof keeps seats dry in the rainy season and lowers complaints.
  • Where is the gate? Trucks and motorbikes should not use the same lane at shift change.
  • Is it safe and lit? Lighting and a security guard matter for evening shifts.
  • Can you charge e-bikes? Charging points need power and fire planning. Ask the landlord and the fire authority before you install any.

Canteen

Large plants usually need a canteen or a meal arrangement. Options:

  1. Canteen inside the unit. You give up production floor but meals are close.
  2. Separate canteen block in the yard or on the plot.
  3. Shared park canteen or food court. Check capacity and opening hours.
  4. Meal delivery from an outside caterer. Meals arrive at set times and workers eat in a dining area.

Whichever option you choose, check:

  • Seating. Plan seats for the largest group eating at once, not total headcount. Staggered breaks reduce the space needed.
  • Kitchen. A kitchen needs gas or electric supply, ventilation, drainage and a grease trap. Where food is prepared on site, food safety rules apply. Ask a local adviser what you need to register for your headcount.
  • Waste. Food waste and wash water must go to the right place. Check what the park wastewater system accepts. See our guide on wastewater fees.
  • Hygiene. Floors, hand wash and storage should be easy to clean.

Toilets and wash facilities

Count the toilets and wash basins in the unit and compare them to your headcount and gender mix. Ask your adviser or the park management what the occupational health rules require for your numbers, then check what exists.

Look at:

  • number of cubicles for women and men on each floor
  • water supply, flush and drainage
  • separate toilets for office and production if you want them
  • condition of tiles, doors and ventilation
  • changing rooms or lockers where your process needs them

Adding toilets later means plumbing, drains and sometimes a permit. Check early.

Rest areas, lockers and first aid

Facility What to check
Rest area Shaded space for breaks, away from machines
Lockers Space and fire route for the number of workers
Drinking water Points on the floor, filtered supply
First aid room A room with a door, running water and a bed
Prayer or quiet room Optional, depends on your workforce
Lactation room Many employers add one. Ask what applies to your numbers

These rooms take floor area from production. Add them to your area plan at the start, so you know the true size you need.

Looking for a factory now? Send my requirements

Look at the whole route

Walk the path of a worker from the gate to the machine.

  1. Where do they park?
  2. Where do they clock in?
  3. Where do they store their things?
  4. Where do they eat and rest?
  5. Where do they use the toilet?
  6. How do they reach the line without crossing forklifts or trucks?

If the path crosses a loading yard or passes a dock, ask what safety separation exists. Our guide on loading docks and container access covers the truck side of the same area.

Put it in the lease or fit-out budget

Facilities that do not exist will become fit-out costs. A new canteen, toilet block or parking roof can be a significant part of a first-year budget. Ask the landlord what they will provide, what you can build and what you must remove at the end. A landlord may agree to build some of it and recover the cost through rent. See the first-year budget guide for how to add these items.

Example: a plant with 300 workers

This example shows how the numbers work. It is an illustration, so replace the inputs with your own.

Input Value
Peak headcount 300 over two shifts of 150
Workers on motorbike 70% of all workers ride in, so about 210 bikes
Meal break Two sittings of 75 people

From these inputs:

  • Parking: 210 bikes at 1.5 to 2 m² each is roughly 315 to 420 m², plus a small car and visitor area.
  • Canteen: seats for 75 at a time, with a serving line and a place to return trays.
  • Toilets: sized for 150 people on shift plus office staff, split by gender mix.
  • Rest area: shaded space for the break overlap.

Now compare the numbers with a typical 3,000 m² unit. A 420 m² parking area plus a 150 m² canteen takes a large piece of the yard and building. If the plot is tight, a unit with a larger yard may suit better than one with a slightly lower rent.

Ask about the neighbours

Shared yards and gates need rules. Ask:

  1. Who else uses the access road and the gate?
  2. Are there time limits for trucks during shift change?
  3. Can your workers use a shared park canteen or food court?
  4. Are there local food stalls outside the gate, and are they allowed?

Visit at shift change to see how the traffic works in practice.

Costs to expect

Facilities rarely appear in the headline rent, but they appear in the budget. Expect separate lines for a parking roof, a canteen fit-out, kitchen equipment, extra toilets, lockers and first aid supplies. Some of these are a one-off build. Others, such as a caterer or cleaning, are monthly. Ask suppliers for written quotes and add them to the comparison between units, so that a cheap unit with no facilities is not compared with a dearer unit that has them.

Get a shortlist

Tell us your peak headcount and how your workers commute. We note parking, canteen options, toilets and rest areas for each unit we visit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

How much motorbike parking does a factory need?

Plan about 1.5 to 2 m² per motorbike including aisles, and count how many workers will ride in. In most southern plants, most workers commute by motorbike, so parking is often larger than people expect.

Does a ready-built factory include a canteen?

Usually not inside the unit. Some parks have shared canteens or food courts, and some tenants build a canteen as part of the fit-out. Many employers use an outside caterer.

How many toilets do I need?

The number depends on headcount, gender mix and shifts, and is set by occupational health rules. Ask the park management or a local adviser what applies, and compare it with the toilets that exist.

Can I use the yard for parking?

Only within the leased boundary and the park's rules. Check how much yard you control, whether it is covered and whether trucks and motorbikes must share the same gate.

Looking for a factory now?

Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.