Moving Used Machines to Your New Factory: What to Check First
November 21, 2026
You can import used machinery into Vietnam, but it is a controlled import: the machine must meet an age limit, standards on safety, energy and the environment and customs checks. The general rule is a maximum age counted from the year of manufacture to the year of arrival, commonly 10 years, with different limits for some sectors. The rules are amended from time to time, so confirm the current rule and the documents for each machine with a customs broker before you book the ship. Start the check at the same time as the lease, because machines held at the port stop the whole schedule.
This article gives the general picture and a planning method. It is not legal or customs advice.
The general framework
Vietnam regulates the import of used machinery, equipment and production lines under a decision of the Prime Minister that has been in force since 2019 (Decision 18/2019/QD-TTg) and has been amended more than once since then, so use the consolidated current text. Separate sector rules also exist. For example, new rules from 1 January 2026 set different conditions for used lines and equipment used in semiconductor and some digital technology work. Check which rule applies to your sector and your machine.
In general terms, the rules look at:
- Age. A maximum age from the year of manufacture to the year of arrival. The general figure is commonly 10 years, and some sectors or equipment types have a different figure.
- Condition and performance. For production lines, a minimum share of design capacity, and limits on energy and material use, may apply.
- Standards. The machine should meet Vietnamese technical regulations on safety, energy efficiency and the environment, or equivalent recognised standards where none exist.
- Exporting country’s lists. Machines listed as outdated, poor quality or polluting in the exporting country may not be allowed.
- Documents and checks. Customs may require an assessment by an organisation approved by the authorities, and a mismatch between documents and the machine can lead to fines or a requirement to re-export.
Do not assume that a machine accepted in a neighbouring country will be accepted here. Check by model, year and sector.
What to find out for each machine
Make a list of every used machine you plan to bring and record:
| Item | Why it matters |
|---|---|
| Make, model and serial number | Customs matches documents to the machine |
| Year of manufacture | Decides the age check |
| Supplier or current owner | Origin and sale documents |
| Value | Duty and VAT base |
| Current condition and test records | Supports the condition check |
| Safety and energy standards | Compliance with Vietnamese requirements |
| Intended use and sector | Decides which age rule applies |
A nameplate photo, a purchase invoice and a service history are a good start.
Duty, tax and registration
Import duty and VAT on machines depend on the tariff code and on your investment registration. Some projects get duty exemption for fixed assets that are part of an investment project, with a list of goods registered with the authorities. This is a technical area. Ask your adviser:
- What is the tariff code for each machine?
- Does our project qualify for duty exemption on fixed assets, and what must be registered first?
- What is the VAT treatment and when is it paid?
- What documents must the supplier provide?
Your registration order matters here, since an exemption list usually needs an investment registration in place. See lease and investment registration.
Fit machine arrival into the factory schedule
Machine imports sit on the critical path. A realistic way to plan:
- Month 0. Choose the factory. List the used machines and check their age and documents.
- Month 1 to 2. Get the customs broker’s view on each machine. Replace any machine that fails the age rule with a newer unit or a local purchase.
- Month 2 to 3. Sign the lease, agree the handover date and the floor and power for each machine.
- Month 3 to 4. Fit-out starts. Book shipping so that machines arrive near the end of fit-out, not before.
- Arrival. Customs clearance, inspection if required, trucking to the park, crane or forklift for placing.
- Installation and tests. Power connection, levelling, calibration, trial runs.
If the machines arrive too early, you need to store them, which may mean a paid store or the factory itself before it is ready. If they arrive late, production starts late. For the whole sequence, read the setup timeline.
Looking for a factory now? Send my requirements
Match machines to the factory
A used machine still has to fit the building. Before you ship, check:
- Floor load. Weight per m² and point loads under feet. See floor load capacity.
- Clear height and door size. Can the machine enter and stand under the beam?
- Power. Voltage, phase and kVA, plus the plug or panel it needs.
- Crane. Do you need an overhead crane to place or service it? See factories with overhead cranes.
- Dock and route. A path from the truck to the machine position.
Give the landlord the machine list with weights and power. It is much easier to fix a floor or a power gap before handover than after.
Common mistakes
- Shipping first and checking later. A machine over the age limit may have to be sent back at your cost.
- Mixed documents. Invoice, packing list and nameplate that do not match slow down clearance.
- Underdeclaring value. This creates tax and customs risk. Declare the real value.
- Treating a production line as a pile of machines. Lines may have extra tests. Ask how your set-up will be classified.
- Forgetting the lease. Heavy machines may need foundations or slab work that the landlord must approve.
Questions for your customs broker
- Which rule and age limit apply to our sector and each machine?
- What assessment or inspection will customs ask for, and who can do it?
- Which documents must the seller supply, in which language?
- How long does clearance take at the port we plan to use?
- What happens if a machine fails the check?
If a machine fails the check
Sometimes a machine is too old or lacks the documents. You have four options:
- Buy a newer used machine that meets the age and standard checks.
- Buy new equipment, locally or imported, often with a longer lead time.
- Use a local contract manufacturer for that step until your own machine is ready.
- Ask your adviser whether another rule applies, for example for your sector or for a research use.
Decide early, before the machine is shipped. A machine that sits at the port while you argue costs storage and delays the fit-out.
Alternatives to importing used
Some tenants avoid the issue by buying equipment already in Vietnam, from other plants that are closing or upgrading. This avoids import checks, but the machine must still fit your floor, power and process, and you must verify ownership and condition. A local machinery dealer or a former tenant of your unit can be a source. Treat every purchase as a technical inspection first and a commercial deal second.
Another route is to lease machines, or to have a supplier install and commission them. In either case, check the lease and the import status with your adviser.
Get a shortlist
Tell us your machines’ weight, height and power with your brief and we will check which factories can take them. Send your requirements and we reply within 24 business hours. There is no fee for tenants.
Frequently asked questions
Is there an age limit for used machinery imported into Vietnam?
Yes. The general rule for used machinery, equipment and production lines is a maximum age counted from the year of manufacture to the year of arrival, commonly 10 years, with different limits for some sectors and equipment types. Rules are amended from time to time, so confirm the current text for your machines.
Do used machines need an inspection?
Often yes. Customs can require an assessment by an organisation designated by the authorities to check age, condition and standards. Ask your customs broker what documents and inspections apply to your machine before it ships.
Can I bring used machines from my plant in another country?
You can, if they meet the conditions for used equipment. Moving your own machines does not remove the age and standard checks. Some investment projects have separate treatment for fixed assets, so ask an adviser early.
How early should I start?
Before you order shipping. Document checks, inspection and customs steps can take weeks, and a machine stuck at the port delays your fit-out and first shipment.