Will the Land Around Your Factory Change? How to Check Planning Risk

November 21, 2026

Check three things before you lease a factory: the approved plan for the land it stands on, any road or infrastructure planned beside it and how many years the land right still has. A unit inside an established industrial park carries low planning risk. A unit outside a park, on a road that is listed for widening or on land with an unclear purpose carries more. The checks are free or cheap, and they are quick compared with moving a plant.

This is general information, not legal advice. Planning rules change, so confirm each point in writing with the authority and with a licensed adviser.

What planning risk means for a tenant

The state plans land use in layers: national and provincial plans, local and zone plans and detailed plans for areas such as industrial parks. Those plans set which land is for industry, which is for roads and which is for housing or green space. They can change. When they change, owners and tenants can face:

  • Limits on use. The land is re-zoned and your business line is no longer allowed on the site, or only for a transition period.
  • Land recovery. The state takes all or part of the land for a road, a public project or a new zone, under the Land Law 2024 and its decrees.
  • Narrowed access. A new road cuts your truck route or a median blocks your gate.
  • Neighbour change. A residential or mixed zone is approved next to the site, and complaints about noise and trucks follow.
  • No more renewals. The planning has changed and the land right will not be extended.

Most of these take years to arrive. A lease of three to five years can still be hit, and heavy fit-out money can be lost.

Where the risk is high and low

Location Typical planning risk Why
Inside a developed industrial park Low Approved master plan, fixed land lease, infrastructure in place
Inside a new park still being built Medium Plan is approved, but roads and utilities may change in phases
Industrial cluster Medium Smaller scale and less central control. See park versus cluster
Outside any park Higher Land-use purpose, roads and nearby zoning vary. See factories outside parks
Along a main road or river Higher Widening, setbacks and flood works
Near new expressways or ring roads Mixed Land value rises and plans change. See ring roads and expressways

What to check, step by step

1. The land-use purpose

The land papers state the purpose of the land. For an industrial building it should be industrial production or trade land, or the equivalent inside a park. If the paper shows another purpose, such as agricultural or residential land, stop and read what to do when the land use is wrong.

2. The approved plan for the site

For a site inside a park, ask the management board for the approved detailed plan and the zone your unit sits in. For a site outside a park, ask the local authority or the land registry office what the current plan says about the plot and its neighbours. Ask your adviser to request written confirmation or a copy of the planning information, since the information is meant to be public.

3. Roads and infrastructure nearby

Ask what roads are planned or being widened within a few hundred metres, and whether any plan touches the boundary, the gate or the loading yard. Look at the road in person. Marker posts, survey stakes or notices on the roadside are clues. Ask nearby businesses what they have been told.

4. The remaining land term

The land right, not the building, sets the upper limit of your lease. Check how many years are left. See the land lease term guide.

5. Notices and projects

Ask the landlord in writing whether it has received any notice about land recovery, planning change, road works or a change of use for this plot or the park.

6. The neighbours’ plan

Look at what is planned next door. A residential or commercial project near the fence of a noisy plant leads to complaints. See bad neighbours.

Looking for a factory now? Send my requirements

Questions to ask, and who to ask

Question Ask
Is this plot within the approved plan for industrial use? Park board or local land authority
Is any part of the plot or the access road planned for recovery or widening? Local authority, transport department
Has the park master plan changed in the last years? Park board
How many years of land lease are left? Landlord and park board
Is the plot subject to a setback or protection corridor? Local authority
Are there pending projects next to the site? Local authority, nearby businesses

Keep the answers in writing. An email from the park board, a copy of a plan or a letter from the authority is far better than a promise on a call.

Protect yourself in the lease

You cannot remove planning risk, but you can allocate it.

  • Warranty. The landlord states that it knows of no plan or notice affecting the land, and agrees to tell you at once if one arrives.
  • Compensation. If the state recovers land, the lease says how compensation is split between landlord and tenant, including your fit-out and relocation costs, to the extent the law allows.
  • Termination right. You may leave without penalty if part of the site or the access is lost, or if a change makes your use unlawful.
  • Rent reduction. If part of the area or the yard is lost, the rent falls in proportion.
  • Notice period. The landlord must give you at least a stated number of months of notice of any change it learns of.
  • Fit-out schedule. Keep a list of your fit-out items with cost, since it supports a compensation claim.
  • Term. Choose a term that fits the risk. See early termination for exit clauses.

Whether a tenant can claim compensation from the state is a legal question that depends on the case. Ask your adviser, and do not assume the answer is yes.

A short example

This is a hypothetical example, not a real case. A tenant leases a unit outside a park on a provincial road. The road is on a widening list that nobody mentions. Two years in, survey stakes appear and part of the loading yard is marked for recovery. With a planning warranty and a rent-reduction clause, the tenant has grounds to renegotiate or leave. Without them, it has little leverage and a truck route that no longer works.

A five-minute screening for any site

  1. Is the site inside a park with an approved plan?
  2. Does the land paper show industrial use?
  3. Are there marker posts, survey stakes or notices nearby?
  4. Is the road in front planned for widening?
  5. Has the landlord confirmed in writing that it knows of no notice?
  6. Is the remaining land term longer than your lease?

If you answer “no” or “do not know” to any item, ask before you pay a deposit. See paying a deposit before checks.

Get a shortlist

We ask for the plan, the land term and any known notices before a unit reaches your shortlist, and we state what we could not confirm. Send your requirements and we reply within 24 business hours. Tenants pay nothing. For the full list of search errors, read factory search mistakes.

Frequently asked questions

What is planning risk for a leased factory?

It is the chance that a government plan changes how the land can be used or takes part of it, for example for a road, a new zone or a change of land use. A change can limit your use, cut the site or end the lease early.

Is a factory inside an industrial park safe from planning change?

It is lower risk, because the park has an approved master plan and a fixed land lease. It is not zero risk. Check the park plan, the remaining land term and any planned roads or infrastructure at the edge of the park.

Who can tell me about planning for a site?

The industrial park management board for sites inside a park, and the local authority and the land registry office for other sites. Ask your adviser to request written confirmation.

What happens to my lease if land is recovered by the state?

The Land Law sets rules on compensation for land recovery, and compensation is mainly for the land user and owner of assets. A tenant's position depends on the lease. Add a clause that covers termination, notice and compensation for your fit-out.