Which Industrial Parks Do the New Ring Roads and Expressways Help?

November 12, 2026

New roads are changing which parks are close to Ho Chi Minh City, the ports and the airport. Ring Road 3 is the project that matters most for tenants in the Thu Duc, Binh Duong, Dong Nai and Long An areas, because it links parks that used to be reached only through the city. Opening dates have moved more than once, so use a road in your plan only after the section you need is open, and judge a factory on access today.

This guide lists the main road projects, the parks they serve and a practical way to use them in a location decision.

Ring Road 3 in short

Ring Road 3 is a roughly 76 km ring around Ho Chi Minh City, with a total investment of about VND 75 trillion. By the project’s own breakdown it passes through four areas:

Section Approx. length Passes through
Ho Chi Minh City About 47.5 km Thu Duc, Cu Chi, Hoc Mon, Binh Chanh
Former Binh Duong About 10.8 km Di An, Thu Dau Mot, Thuan An
Dong Nai About 11.3 km Nhon Trach and nearby areas
Former Long An About 6.8 km Ben Luc

Binh Duong is now part of Ho Chi Minh City, and Long An is now part of Tay Ninh province, so the road crosses four former provinces but fewer current ones. See our province merger guide.

A December 2024 plan set a target to open the whole road by 30 June 2026 (see the VnEconomy report). Press reports later in 2026 described the project as in its final stages, with the Dong Nai section expected to open in October 2026 and the Tan Van interchange as one of the slower parts. We could not confirm which sections are open today. Treat any date as a target.

Other roads to watch

Road What it does What to check
Ho Chi Minh City to Long Thanh to Dau Giay expressway Links the city, Dong Nai and the Vung Tau direction Open, but busy on some stretches
Ben Luc to Long Thanh expressway Links the Long An side, Nhon Trach and Long Thanh airport without crossing the city Opening was reported for around September to October 2026. Check the current state
Ring Road 4 A further outer ring, in sections Two components were approved with construction expected from September 2026. Check whether work has started
Ho Chi Minh City to Thu Dau Mot to Chon Thanh expressway Links the city, Binh Duong and Chon Thanh in the former Binh Phuoc Groundbreaking in February 2025, with completion targeted for 2026 on the Binh Duong section. Check progress
Bien Hoa to Vung Tau expressway Shortens the trip from Dong Nai to Phu My and Cai Mep Under construction, with sections targeted in 2026. Check progress

These are the projects we have seen in public reports. They change, so ask your forwarder or the park for the latest.

Which parks may gain

Thu Duc, Thuan An and Di An. Ring Road 3 passes through this belt and links it with the Binh Duong, Dong Nai and western sides.

Nhon Trach and the Long Thanh side. Ring Road 3 and the Ben Luc to Long Thanh expressway are meant to give a route that avoids the city centre. Our Nhon Trach guide covers these parks.

Ben Luc and the Long An side. The corridor connects to the Mekong Delta, so cargo from the west can reach the east ports without going through the city. See our Long An guide.

Chon Thanh and the northern side. The expressway to Chon Thanh is meant to help the parks in the former Binh Phuoc. See our Binh Phuoc guide.

Phu My and Cai Mep. New links from Dong Nai toward the coast help trucks reach the deep-sea port. See our Cai Mep guide.

Looking for a factory now? Send my requirements

How to use road news in a lease decision

  1. Decide on today’s access. If a factory only works when a road opens, treat it as a risk. Delays on large projects are common.
  2. Measure the distance to the ramp, not the road. A road that passes 5 km away is no help if there is no interchange nearby. Ask where the nearest entry is and how trucks reach it.
  3. Ask whether the road is open to your vehicles. Some roads limit heavy trucks or specific lanes at certain hours.
  4. Expect construction disruption. Work near the site can block gates and slow trucks. Ask whether any is planned nearby.
  5. Expect landlords to know the news. Rents near a promised road can be priced for the future. Compare with parks of similar spec that have no new road coming.
  6. Add a review clause, not a bet. If rent is set today, fix the escalation in the lease. See our cost guide.

Questions for the landlord about roads

Ask these in writing, so you can compare answers between parks:

  1. Where is the nearest interchange or ramp, and how long does a loaded container truck take to reach it?
  2. Which sections of the road you mention are open today to heavy trucks?
  3. Is any road work planned near the park gate or on the main access road in the next two years?
  4. Has the landlord or the park told other tenants about changes in rent or fees linked to a new road?
  5. Which forwarders serve the park, and have their trip times changed since the last road opened?

The last question is the most useful. Forwarders know the real effect of a new section on trip times within a few weeks.

What the roads do not fix

A new road shortens the trip. It does not add workers, power or clear height. A park that is well connected but short of workers remains a hard place to staff, and a unit that is too low for your racking stays too low. Start from the spec and the labor test, then add the road. See our labor availability guide.

A simple test

Pick the two or three parks you like. For each, write down the current trip time to your port and to your main supplier at the hour you travel. Then write the trip time you hope for when the new road opens. If a park wins only on the second number, keep it on the list but rank it lower than a park that wins on the first.

Ports and roads together

Road projects change the case for Cat Lai and Cai Mep too. If you ship many containers, read both guides: Cat Lai and Cai Mep. Ask a forwarder for quotes on the routes you may use.

Get a shortlist

Tell us where your cargo and suppliers are, and we will compare parks by today’s access and flag where a new road is still a plan. We check each factory on site and send up to five. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

How long is Ring Road 3 in Ho Chi Minh City?

The project is about 76 km. It runs through Ho Chi Minh City, the former Binh Duong area, Dong Nai and the former Long An area, now part of Tay Ninh province.

Is Ring Road 3 fully open?

Targets were set for 2026 and several dates have moved, so we cannot state the current status of every section. Check recent official or press reports for the section you rely on before you sign a lease.

Will rents rise near new roads?

Landlords often price in better access once a road is open. We cannot predict rents. Ask for the current rent and a rent review clause, and decide on today's access, not a promised date.