Guides / Locations
Long An Factories After the Merger: What a Tenant Needs to Know
November 21, 2026
A factory in “Long An” is now a factory in Tay Ninh province. That is the first thing a tenant needs to know. The area is the same, the parks are the same and people in the trade still say Long An. But the province on a new lease, licence or invoice is Tay Ninh. The area suits tenants who want lower land cost than Binh Duong, a western route to Ho Chi Minh City and ports on the south side, and who accept a longer trucking time to the east-side ports.
The province change in one paragraph
On 1 July 2025 Long An merged with Tay Ninh. The new province is called Tay Ninh and its administrative centre is Tan An city, which used to be the capital of Long An. The Tay Ninh provincial newspaper reported the plan in its article on the new Tay Ninh province. District names were also removed in the reorganisation, so addresses now show communes and wards. Our guide to the province merger and factory addresses covers the paperwork side. For the north-western part of the new province, read our Tay Ninh guide.
Where the parks are
| Old district | Parks seen on public listings | Position |
|---|---|---|
| Duc Hoa | Xuyen A, Tan Duc, Nam Thuan | East side of the old Long An, bordering the Cu Chi and Hoc Mon side of Ho Chi Minh City |
| Ben Luc | Thu Hien, Phuc Long, Vinh Loc 2 | Along the expressway and National Highway 1, toward Ho Chi Minh City |
| Can Duoc | Kien Thanh | South of Ben Luc, toward Can Giuoc |
| Can Giuoc | Long Hau | Near Ho Chi Minh City’s southern ports at Hiep Phuoc |
Park names come from broker and consultancy listings, which also mention more parks than shown here. Newer projects were announced in Duc Hue and Thu Thua in 2025. Treat any park not yet built as a plan: a ready-built factory needs a building, power and a fire approval first.
Access: the real trade-off
Long An sits on the western side of the southern industrial region. That helps in some ways and hurts in others.
To Ho Chi Minh City. National Highways 1 and 50, the Ben Luc-Long Thanh expressway and the Ho Chi Minh City to Trung Luong expressway link the area to the city. Ben Luc and Can Giuoc are the closest parts. Duc Hoa reaches the city through the north-west side.
To the south ports. Can Giuoc’s Long Hau park is about 3 km from the Hiep Phuoc port cluster according to a consultancy description. Check the figure and the road on your visit.
To Cat Lai and Cai Mep. Trucks from Long An cross or skirt Ho Chi Minh City to reach the eastern ports. The trip is longer than from Thuan An or Nhon Trach and depends heavily on traffic. Our guides to Cat Lai port and Cai Mep port show how to test a route.
To the Mekong Delta. If your suppliers or customers are in the delta, Long An is the first industrial stop on the way. This is a real reason to choose it.
What the area gives you
- Lower land cost on the western side. Land and rents are often lower than in the Binh Duong and Dong Nai core. Typical ranges on public listings for ready-built units in southern parks are about US$4 to US$7 per m² per month, and units further from the city sit toward the lower part. This is a typical range, not an offer.
- Room for growth. Several parks have open land and expansion phases.
- Access to a labor pool from Long An and the delta. Workers commute from nearby communes and from Ho Chi Minh City’s western wards.
What to watch
- Soft ground and flooding. Parts of Long An are low and close to rivers. Ask about floor level, ground improvement and drainage. See our guide to flood risk.
- Bridges and river crossings. Some routes depend on bridges. A closure can add hours to a trip.
- Park maturity. Some parks are well developed and others are still building roads, wastewater plants or substations. Our industrial park infrastructure check shows what to verify.
- Papers after the merger. Check the province on the land papers and the owner’s licences.
Looking for a factory now? Send my requirements
How to read a Long An listing after the merger
Listings written before mid-2025 say “Long An province”. Newer ones may say “Tay Ninh province” or still use both. Three habits avoid confusion:
- Search with both names. Use Long An for the area and Tay Ninh for the province, so you see old and new listings.
- Read the park name, not the heading. The park name stays stable while the address changes.
- Ask for the current address in writing. The owner should state province, commune or ward and the park, and confirm that the same text appears on the land papers.
If you plan to register a company or an investment project at the address, a licensed adviser should confirm the wording the authority will accept.
Questions for a Long An owner
- Is the unit on firm ground, and has it flooded in the last five years?
- Which roads and bridges does a 40 ft container truck use to reach the city and each port, and are there weight limits?
- How many years remain on the park’s land lease?
- What is the transformer size in kVA, and is it dedicated to the unit? Our power supply guide explains the answer to look for.
- Does the park wastewater plant accept your process water?
- Which tenants are already in the park, and where do their workers live?
Rent and terms
Owners in Long An quote like those elsewhere in the south: in US dollars before VAT, with a management fee on top, a deposit commonly of 3 to 6 months and a minimum term usually of 3 years. Longer terms and larger units bring a lower rate per m². Because trucking costs more from Long An to the eastern ports, add that cost before you compare it with a Binh Duong unit. Our cost guide shows the method, and the Long An price guide looks at the price drivers.
When Long An fits
Long An fits if three things hold. Your products or suppliers connect to the delta or the south-west, you can accept longer trips to the eastern ports and you gain from lower land cost or room to expand. It fits less well if you ship most containers through Cai Mep or if managers must be in the city every day.
If you are still choosing between the west and the east of the region, compare Long An with the Dong Nai side in our Binh Duong and Dong Nai guide. A tenant who runs the numbers on trucking time, labor and rent for one real product usually finds the answer quickly. Bring one product, its weight, its monthly volume and its destination port, and the comparison becomes concrete.
Get a shortlist
Tell us the area, height, power and crane you need, and which side of Ho Chi Minh City you prefer. We check factories on site and send up to 5 that fit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
Does Long An still exist as a province?
No. On 1 July 2025 Long An merged with Tay Ninh to form a new Tay Ninh province, with its administrative centre in Tan An city. Long An remains a common search term and a useful name for the area.
Which Long An areas have industrial parks?
Public listings show parks in Duc Hoa, Ben Luc, Can Duoc and Can Giuoc, among others. Duc Hoa borders the north-west of Ho Chi Minh City. Can Giuoc and Ben Luc are nearer the south and the Hiep Phuoc port area.
Is Long An cheaper than Binh Duong?
Land and rent can be lower on the western side, but the saving depends on the unit. Compare the full monthly cost including trucking, not only the rent per m².
Should the lease show Long An or Tay Ninh?
Use the administrative name on the current land papers and the licence. Ask the owner for the present province, commune or ward and agree who updates old documents.
Looking for a factory now?
Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.
Send my requirements