How to Judge the Infrastructure of an Industrial Park Before You Rent

November 21, 2026

A factory is only as good as the park around it. A unit with the right floor, crane and power can still fail if the road floods, the wastewater plant is full or the substation trips every dry season. These ten checks look at the park rather than the building. Do them on your first visit, and repeat the ones that matter at a different time of day.

The ten checks at a glance

# Item What to look at Question to ask
1 Internal roads Width, surface, turning space, lighting Can two container trucks pass and turn?
2 Power supply Substation, feeders, backup, outage record Is there a second feed, and how often do cuts happen?
3 Water supply Source, pressure, interruptions What is the capacity and how often is supply cut?
4 Wastewater plant Capacity, load, accepted limits Can it take my volume and type of wastewater?
5 Drainage Channels, outfalls, flood history Where did water stand in the last heavy rain?
6 Fire cover Hydrants, pumps, fire team, response Who responds, and how fast?
7 Security Gate, patrol, cameras, visitor control Who is at the gate at night?
8 Telecom Fiber routes, providers Which providers have cable in the park?
9 Waste handling Collection of general and hazardous waste Which contractors serve the park?
10 Occupancy and management Plots filled, management response Who do I call when something fails?

1. Internal roads

Drive the park in a car, then walk part of it. Look for:

  • road width and surface, with potholes or patches
  • turning radius at junctions for a 40 ft container truck
  • lighting at night
  • parking of trucks on the road
  • signs, drains and kerbs

Trucks at your gate need space to turn without blocking the road. See our guide on loading docks and container access for the dock side of this check.

2. Power supply

Ask the park management where the power comes from. A park usually receives high voltage from the grid through one or more substations and distributes it by feeders to the plots. Ask:

  • Is there a substation in or next to the park?
  • Is there a second feed that can take over?
  • How many outages happened in the last year and how long did they last?
  • What is the capacity left for new tenants?

Combine this with the transformer check in your unit. Our guide on factory power supply and kVA shows what to read.

3. Water supply

Ask for the source, the daily capacity and the record of interruptions. Check the pressure at the unit with a gauge if you can. If you rely on water for cooling or process, plan a storage tank.

4. Wastewater treatment plant

Industrial parks normally have a central plant that treats the wastewater of all tenants. Tenants must pre-treat their water to the plant’s limits before it enters the sewer. Ask:

  • What is the plant’s design capacity and what is the current load?
  • What discharge limits does it set for tenants?
  • Does it accept the type of wastewater your process creates?
  • Is there a record of problems or complaints?

Get confirmation in writing if your process makes industrial wastewater. For fees, see the guide on wastewater costs in industrial parks.

5. Drainage and flooding

Look at the channels and outfalls around the park. Check where water collects after heavy rain. Ask tenants who have been there more than one rainy season. A low plot near a canal may flood even if the building has a raised floor. See the guide on flood risk.

6. Fire cover

Look for hydrants along the roads, a pump house and a water reserve. Ask who responds to a fire in the park and how long it takes. Some parks have their own fire team. Others depend on the local fire police. Ask to see the last drill or test record, if there is one. The unit has its own fire approval, but a fire in the next plot becomes your problem too.

7. Security

A staffed gate, patrol, cameras and a visitor register protect stock and equipment. Visit at night if you can, or ask tenants about thefts. Check who controls access for trucks and for visitors.

8. Telecom

Ask which providers have fiber in the park and where it enters your plot. See our guide to internet and fiber in industrial parks.

9. Waste handling

Ask which contractors collect general waste and which handle hazardous waste. A process that makes oil, solvents, sludge or chemicals needs a licensed handler. Ask the park management for the list.

Looking for a factory now? Send my requirements

10. Occupancy and management

Check how many plots are filled and who manages the park. A responsive management office solves problems in days. A slow one leaves you with broken lights and a pothole for months. Ask:

  • Who is my contact, and how do I reach them?
  • How are common area costs charged, and how are they set?
  • What are the park rules on working hours, trucks and noise?

Our guide on industrial park management fees shows what the fee should pay for.

Visit twice

One visit shows the park in good light. A second visit shows how it behaves under pressure.

  • At shift change, to see traffic and gate queues.
  • After heavy rain, to see drainage and roads.
  • At night, to see lighting and security.

Talk to at least two current tenants away from the park office, and ask what they would change.

Compare two parks side by side

After you visit, put the answers in one table so that the decision rests on facts and not on how good the gate looks.

Item Park A Park B
Road width and condition
Second power feed
Outages in the last 12 months
Water interruptions
Wastewater plant spare capacity
Flood history
Fire cover
Night security
Fiber providers
Hazardous waste handler
Plots occupied
Management response time

Score each line from 1 to 3. A park that scores 1 on power, wastewater or flooding is out for most processes, whatever the rent. The rest can be weighed against cost.

Common mistakes

  • Judging the park from the front gate. The gate is the best-kept part of a park. Drive the back roads.
  • Taking verbal promises. A planned substation or road is not a working substation or road. Ask for dates and ask whether they are funded.
  • Ignoring the neighbours. A noisy or polluting plant next door can affect your product and your workers.
  • Forgetting the route outside. The road from the park to the port or the highway matters as much as the roads inside.
  • Skipping the rainy season. If you visit in the dry season, ask for photos of the last wet season.

Ask for it in writing

Keep a short record of what the park management tells you: capacity, outage history, wastewater limits and planned works. Ask them to confirm the key points by email or in a letter. If a statement matters to your decision, for example that the wastewater plant can take your process, it should be in writing before you sign the lease, and ideally referenced in it.

Get a shortlist

We look at the park as well as the unit when we visit, and note roads, power, wastewater, flooding and management on each site. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

What infrastructure should an industrial park in Vietnam have?

Internal roads, a power supply with a substation, water supply, a central wastewater treatment plant, drainage, fire protection, security at the gate and telecom lines. Quality and capacity differ from park to park, so check each one.

How do I check if the wastewater plant has spare capacity?

Ask the park management for the plant's design capacity, current load and the discharge limits it accepts. Ask for confirmation in writing that it can take your volume and type of wastewater.

How can I find out about power cuts in a park?

Ask the park management and several current tenants about outages over the past year, how long they lasted and whether the park has a second feed. A visit during peak summer load is useful.

Is the park's occupancy rate important?

It helps. A park with many occupied plots usually has working services and neighbours who share the cost of upkeep. A mostly empty park may have gaps in services, or may offer lower prices. Ask what is planned.