Tay Ninh Industrial Parks: Border Trade, Land Cost and Distance

November 21, 2026

Tay Ninh is the western edge of the southern industrial region. It suits manufacturers who want large parks, lower land cost and a road link toward Cambodia, and who can accept a longer truck trip to the sea ports. For a ready-built factory, the practical choice is among a few parks along National Highway 22, with Trang Bang closest to Ho Chi Minh City, Phuoc Dong around Go Dau and the Moc Bai border zone at the far end.

Which Tay Ninh this guide covers

Since 1 July 2025 the province called Tay Ninh includes the former Long An. Its administrative centre is Tan An city. In this guide “Tay Ninh” means the north-west part of that province, along the road from Ho Chi Minh City toward the Moc Bai border gate. Parks in the former Long An, such as those in Duc Hoa and Ben Luc, are covered in our Long An guide. Addresses now show communes and wards, because the district level was removed in the 2025 reorganisation.

The main parks

Park Area What public sources say
Trang Bang Trang Bang, on National Highway 22 About 1,650 ha, along the Trans-Asia highway
Phuoc Dong Go Dau, near the Moc Bai road About 3,285 ha in total, of which about 2,190 ha is industrial land
Thanh Thanh Cong Trang Bang area An expansion to around 479 ha was reported
Moc Bai border zone Near the Cambodia border Several large industrial and logistics projects planned

Figures come from the national investment promotion portal, provincial press and directories, and differ between sources. The portal’s Phuoc Dong page gives the developer’s description. A 2026 press report said the province had 51 industrial parks covering over 15,000 ha and aimed for many more by 2030. Many of these are new or partly built, so a park on the list may have no ready-built unit.

Why choose Tay Ninh

Land cost and room. Land in Tay Ninh is generally cheaper than in the Binh Duong and Dong Nai core, and the parks are big. A tenant who may add buildings later has more choice.

Highway 22 and Cambodia. The road runs from Ho Chi Minh City through Cu Chi and Trang Bang to the Moc Bai gate. If you sell to Cambodia, source inputs there or plan a regional route, a Tay Ninh address saves a long leg. Ask your customs adviser how border clearance would work for your goods, because rules differ by product.

Possibly less hiring competition. Parks further from the city may have fewer large foreign plants competing for the same workers. Check this by visiting the gate at shift change.

What Tay Ninh costs you

Item Effect What to do
Distance to Cat Lai and Cai Mep The longest leg of any southern option Price trucking per container, not per m² of rent
Distance to Ho Chi Minh City Long commute for city-based managers Plan housing near the park
Supplier base Local machining, packaging and service firms may be fewer than near the city Ask which suppliers already serve the park
Fewer ready-built units Many parks have land plots first Ask for what is free now and the handover date

If you export in volume through Cai Mep, test a loaded truck trip from the park gate to the port gate before you decide. Our guides to Cat Lai and Cai Mep explain how to measure the route.

Border trade: what to ask

The Moc Bai border gate economic zone is a planned zone with large projects for industry, services and logistics. At the time of the sources we checked, its master plan to 2045 was awaiting final approval and the 2026 to 2030 list of priority projects included several large industrial and urban areas. That means two things for a tenant. The zone may offer land and policies in the future. It is also not a place to count on a move-in date for a ready-built unit. Ask the zone management board:

  • Which areas are open now and which are only planned?
  • What sectors are accepted, and what incentives apply?
  • What does the customs process look like for goods moving in and out?

Confirm the incentives with a licensed adviser, because they change.

Looking for a factory now? Send my requirements

Who Tay Ninh suits

Tenant Fit Reason
Plant with heavy, bulky or low-value products Good to check Rent and land savings can outweigh a longer truck leg
Plant selling to Cambodia or the region by road Good to check The border gate is on the same highway
Plant needing a large plot for phased growth Good to check Parks are big and still developing
High-volume exporter to the US or EU through Cai Mep Weaker Longest leg to the deep-sea ports
Plant with managers who must be in the city daily Weaker Long daily commute

A cost test before you decide

Take one product and work out the monthly cost at two sites: one in Tay Ninh and one in Binh Duong or Dong Nai. Use the same unit size. Add rent and management fee, then add trucking for your real monthly container count, then add the extra commute cost for managers. If Tay Ninh wins after trucking, it is a real saving. If it wins only on rent per m², it is not. The method is the same one we use in our factory rent cost guide.

Also ask how the owner treats a lease that starts before a park’s roads, power or wastewater plant are complete. In a developing park, the lease should say who delivers each service, by what date and what happens to your rent if the date slips.

Rent and terms

Ready-built units in southern parks are commonly listed at about US$4 to US$7 per m² per month, before VAT. These are typical ranges from public listings, not offers. In Tay Ninh units can sit toward the lower part of the range, and some owners may offer more rent-free months for longer terms. The usual minimum term is 3 years and the deposit commonly 3 to 6 months. See the cost guide for fees on top, and compare the full monthly cost including trucking.

Checks that matter in Tay Ninh

  1. Is the unit built and ready? Many parks sell land first. Ask for the construction permit and the fire prevention approval.
  2. Power. Ask about the park substation and the transformer in kVA. New parks may still be waiting for capacity. Our power supply guide shows what to read.
  3. Wastewater. Confirm the plant is built and accepts your process water.
  4. Flood and road access. Check the road to the park in the rainy season.
  5. Accepted industries. Get the list in writing.
  6. Land lease term. It must cover your lease.

Our industrial park infrastructure check covers roads, substations and security.

Get a shortlist

Tell us the area, height, power and crane you need and how many containers you ship a month. We check factories on site and send up to 5 that fit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

What is Tay Ninh province now?

Since 1 July 2025 Tay Ninh is the province formed by merging the old Tay Ninh and Long An. Its administrative centre is Tan An city. This guide covers the north-west part, around Trang Bang, Go Dau and Moc Bai.

Why would a manufacturer choose Tay Ninh?

For lower land cost, large parks with room to grow and a road link to Cambodia through the Moc Bai border gate. The price is a longer trip to the Ho Chi Minh City and Cai Mep ports.

Which Tay Ninh parks do foreign tenants look at?

Public sources name Trang Bang, Phuoc Dong and Thanh Thanh Cong among the main ones. Availability of ready-built units varies, so ask for what is free now.

Is the Moc Bai border zone ready for tenants?

Parts of the Moc Bai border gate economic zone are planned or being built, and its master plan was under review at the time of the sources we checked. Ask the zone authority which areas are open to new tenants.