Where to Find a Small Factory Unit, and What to Expect
November 21, 2026
Small ready-built factories of 500 to 1,500 m² exist in southern Vietnam, but they are harder to find than 3,000 m² units, they usually cost more per m², and they come with limits on power, crane and docks. The supply sits mainly in older industrial parks, in the outskirts of Ho Chi Minh City and in blocks owned by private landlords. If your process fits, a small unit is a cheap way to start. If it does not, a mid-size unit may be the better answer.
Who rents a small unit
Typical tenants are:
- Suppliers to a bigger customer. A Tier 2 or Tier 3 supplier that follows an OEM into Vietnam and needs a small line first.
- Companies testing Vietnam. A pilot plant before a bigger commitment.
- Light assembly and packing. Electronics sub-assemblies, small mechanical parts, cosmetics and medical device packing.
- Workshop-type processes. Tooling, moulds, repairs, prototyping and small machining.
If your process needs a large floor load, heavy power or an overhead crane, a small unit is usually not the right place.
Where small units are
Small units cluster where land is already built up and where owners built blocks of similar units. Based on the area guide on this site, the main areas are:
- The Binh Duong area, now part of Ho Chi Minh City. Thuan An, Di An and Tan Uyen have older parks and private blocks with units in the 500 to 2,000 m² range. This is the densest market for small units. See the Binh Duong industrial parks guide.
- Ho Chi Minh City outskirts. Hoc Mon, Cu Chi and Binh Chanh offer small plots and shorter trips to the city centre, at higher rents.
- Dong Nai. Bien Hoa has older parks with smaller units. Nhon Trach and Long Thanh are newer and tend to have larger plots.
- Long An, now part of Tay Ninh province. Lower land costs on the western side with a longer trucking time to the ports.
Because small units are scattered, a broker search saves time. A single park may have one unit that fits, and the rest of the stock is spread over many owners.
What you can expect on rent
The range seen on public listings for ready-built factories in southern parks is about US$4 to US$7 per m² per month. These are typical ranges, not quotes. For a small unit, expect the upper half of the range, since the landlord has fewer m² to recover costs over, and the minimum term is usually 3 years.
| Cost | Small unit | What to ask |
|---|---|---|
| Rent | Upper half of the range for the area | Is the quote on production area only? |
| Deposit | Commonly 3 to 6 months | Cash or bank guarantee? |
| Management fee | Per m² per month, on top of rent | Fixed for the term or reviewed yearly? |
| Power | Billed at the production tariff | What is the transformer size and is it shared? |
| Fit-out | Often small, but fixed items cost the same | What can be reused from the last tenant? |
A 1,000 m² unit at US$5 per m² costs about US$5,000 a month before VAT, the management fee and utilities. Use the cost guide to build the full monthly figure.
The limits to plan around
Power. Small units often share a transformer with neighbours or have a modest connection. Check the kVA actually available to the unit and how it is split. See reading the power supply for how to test it.
Crane and height. Few small units have crane beams. Clear height is often lower, around 6 to 8 m in older stock, which limits racking and tall machines.
Docks and truck access. One dock or a roller door is common. Check that a 40 ft container truck can reach it. Narrow roads and tight turns are the usual problem in older areas.
Floor load. Check the slab rating if you have heavy machines. Older blocks may have lower loads than new units.
Shared walls and neighbours. Many small units are in rows. Noise, vibration, dust, smell and fire risk from the next unit become your problem. Read standalone vs shared buildings before you choose.
Expansion. A small unit can be a dead end. If you will need double the area in two years, ask whether the neighbouring unit can be added, or whether the landlord has a bigger unit in the same park.
Looking for a factory now? Send my requirements
Papers matter more, not less
Small private blocks often have less standard paperwork than a large developer’s park. Before you pay a deposit, ask to see:
- The land use rights or the sublease from the park developer, and its remaining term.
- The construction permit for the building.
- The fire prevention approval and acceptance, and the use it covers.
- Proof that the owner can lease the unit, for example an owner authority or a company registration.
- A sample electricity and water invoice.
Our lease due diligence guide goes through each paper. If the unit is outside an industrial park, run extra checks, since zoning and environmental rules may not allow manufacturing there.
How to search efficiently
- Write your brief with a size range. For example, 800 to 1,500 m², not exactly 1,000 m². Flexible area gives far more matches.
- List the hard limits. kVA, floor load, clear height and whether a crane is required.
- Allow two or three areas. One park may not have the right unit.
- See at least three units. Prices and quality vary a lot.
- Ask for a break option. If the unit proves too small, you can move without paying the rest of the term.
Questions for the landlord of a small unit
Small units come from many kinds of owners, so ask more questions, not fewer:
- Is the unit inside an industrial park or outside? Who is the park developer?
- What is the remaining land lease term and who holds it?
- How many kVA does the unit have and is it metered separately?
- Which fire approval covers the building and what use does it cover?
- Are there any limits on hours, noise, vehicles or processes?
- Is the management fee fixed? What does it cover?
- Who pays for repairs to the roof, doors and floor?
- Can the lease be extended or the area increased?
- Is the rent quoted before or after VAT, and will you issue a proper e-invoice?
- What happens to the lease if the unit is sold?
Written answers are the minimum. If the owner will not put answers in writing, treat it as a signal.
When to step up to a mid-size unit
A small unit stops working when:
- You cannot add a line without removing another.
- Your power demand is close to the unit’s limit.
- You need a crane, higher racking or more docks.
- Stock and raw materials fill the work area.
- A customer asks for audits that the shared site cannot pass.
Plan for the move from the start. A break option after year one or two, or an agreement to move into a larger unit owned by the same landlord, saves a full relocation later. Our large factory guide covers what changes at the next size.
A note on landlords and invoices
Small units are often owned by individuals or small companies. Ask for a proper VAT e-invoice for rent, since your accounting and tax filings depend on it. If the owner cannot issue one, that is a risk to price in or a reason to choose another unit. The same applies to the lease itself: make sure the signatory has the authority to lease the unit.
Get a shortlist
Tell us the size range, power, height and move-in date and we will check which small units fit, on site, before they reach your shortlist. Send your requirements and we reply within 24 business hours. There is no fee for tenants.
Frequently asked questions
What is the smallest factory I can rent in Vietnam?
Standard developer units in industrial parks often start around 1,000 m². Smaller units of 300 to 800 m² exist, mostly in older buildings, private owners' blocks or flatted factories, and they need more checking.
Is rent per m² higher for a small unit?
Often yes. Landlords price a larger area and a longer term lower per m². Small units usually sit in the upper half of the US$4 to US$7 per m² per month range seen on public listings, depending on location and age.
Can a small factory have an overhead crane?
Rarely. Small units seldom have crane beams, and shared structures often cannot take one. If you need a crane, say so in your brief and expect fewer matches.
Is a small factory outside an industrial park a good idea?
It is cheaper and easier to find, but many sites outside parks are not zoned for manufacturing. Check land use, the fire approval and the environmental status before you rely on one.