The Landlord Promised It, but Is It in the Contract?
November 21, 2026
If a promise matters to your plant, it must be in the signed lease or in an annex that the lease names. Spoken promises, brochures, chat messages and agent assurances are weak evidence once a contract says it covers the whole deal. Before you sign, list every promise you rely on, find each one in the text and add what is missing.
This is general information, not legal advice. Ask a licensed adviser to read the final lease.
Why promises vanish
Promises disappear for ordinary reasons. The person who made the promise leaves the landlord’s company. The agent who made it was not authorised. The lease was drafted by a lawyer who never heard the conversation. Or the lease says it replaces all earlier statements and the promise was not written down.
A factory lease is a long contract with money at stake. The signed text is what a court or arbitrator reads first. A promise outside the text is a matter of proof, and proof of a verbal promise is usually one person’s word against another’s.
Promises tenants commonly rely on
| Promise made in talks | Where it should appear |
|---|---|
| “The roof will be repaired before you move in” | Handover schedule with a date and acceptance test |
| “Power will be upgraded to the kVA you need” | Power clause with date, cost split and remedies. See power not delivered |
| “Rent is fixed for three years” | Rent clause and escalation schedule |
| “Two months rent-free for fit-out” | Rent-free clause with start and end dates. See rent-free period |
| “You can build a mezzanine” | Permitted works clause and landlord consent |
| “We will add two docks” | Landlord works annex with specification and date |
| “You have the option to take the next unit” | Option clause with area, rate and notice period |
| “You can leave after two years” | Break clause with notice and fee |
| “Deposit comes back in 30 days” | Deposit return clause with conditions. See the deposit guide |
| “Management fee will not rise” | Fee clause with cap or fixed amount |
| “The unit has fire approval for your use” | Warranty and attached copy of the approval |
Where a promise can live
In the main lease
The strongest place. The term is part of the contract and is read with the rest.
In an annex that the lease names
An annex signed by both sides and listed in the lease (“Annex 3: Landlord’s works”) is part of the contract. It suits long lists such as repairs, specifications, equipment and drawings. Make sure the lease says that the annexes form part of the contract.
In a side letter
A side letter is a separate signed document. It can be useful for a point that one side does not want in the main text, but it adds risk. It may conflict with the lease. The lease may say it overrides any side arrangement. A later buyer of the building may never see it. Use a side letter only if your adviser agrees, and make sure the lease refers to it.
In an email or message
Emails and chat messages show what was said and when. They support your case, but they are not a substitute for the clause. Use them to draft the text, not to carry the promise.
The clause that can erase your notes
Many leases contain an entire agreement clause. It says the contract is the whole deal and replaces earlier talks, offers and messages. Read it closely.
- If you signed one, any promise outside the contract is at risk.
- If you have a promise you rely on, it must be inside the contract or its annexes before you sign.
- If the other side wants the clause, ask them to list the important promises in an annex first.
Also check the clause on changes. A lease often says that changes must be in writing and signed by both sides. That works in your favour: a landlord cannot add new terms by phone either.
How to turn promises into clauses
- Keep a promise list from the first call. Write the date, who said it and what.
- Confirm each point by email after a meeting. “To confirm what we discussed: the landlord will replace the roof sheets on bays 2 and 3 by 15 March at its cost.” Ask for a reply.
- Ask who has authority. The person who promises must be able to bind the landlord. See when the lessor is not the owner.
- Give your lawyer the list with the draft lease and ask them to match each item to a clause.
- Make each promise measurable. Date, quantity, specification, standard, who pays, what happens if late.
- Add a remedy. Rent credit, right to do the work and deduct, right to end the lease.
- Read the final version again after the last round of edits. Clauses fall out in late drafts.
- Sign only the final text. Not a version marked draft, not a version with open brackets.
Looking for a factory now? Send my requirements
Vague promises and how to sharpen them
| Vague | Better |
|---|---|
| “Landlord will repair the roof” | “Landlord will replace the roof sheets over bays 2 and 3 and fix all leaks by 15 March, tested after rain, at its cost” |
| “Reasonable rent increase” | “Rent increases 3 percent each year on the anniversary” |
| “Good power supply” | “Dedicated 800 kVA, 380 V, available at the main panel by 1 April” |
| “Landlord will help with approvals” | “Landlord will sign and submit the documents listed in Annex 4 within 10 working days of request” |
| “Fair handback” | “Tenant removes its equipment and repairs damage, normal wear excepted, as listed in Annex 5” |
The numbers in this table are examples of style, not figures for your deal.
Language and versions
If the lease exists in English and Vietnamese, the promise must appear in both, and the clause on which version prevails must be clear. A promise in the English text only may not count if the Vietnamese text controls. See bilingual contracts.
If you already signed without it
- Collect the evidence. Emails, messages, minutes, drawings, quotes.
- Write to the landlord that you rely on the promise, citing date and speaker.
- Ask for an amendment that adds it to the lease. Landlords often agree to what they said before.
- Trade for it. Offer a longer term, a payment on time or a reference.
- Take advice before you withhold rent or stop work. See dispute resolution.
- Fix it at renewal. Use the next negotiation to write what was missing.
A last check before you sign
Read your promise list against the final contract. If you can point to a clause or annex for each item, sign. If you cannot, the promise is a hope. The negotiation guide and the list of questions for the landlord can help you prepare, and the lease clauses guide shows what to read first.
Get a shortlist
We note what each owner offers in writing, such as repairs, power works and rent-free months, so that you can ask for them in the lease. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
Are verbal promises from a landlord binding?
Do not count on it. Proving a spoken promise is hard, and a signed lease often says it replaces earlier talks. Put every promise that matters into the lease or a signed annex.
What is a side letter?
A side letter is a separate signed document that adds or explains terms outside the main lease. It can work, but it is safer to attach the promise to the lease as an annex and refer to it in the lease text.
What is an entire agreement clause?
It says the signed contract is the full deal and replaces earlier talks and messages. If you sign one, any promise that is not in the contract or its annexes is at risk.
Do emails and chat messages count?
They can help as evidence of what was said, but they are weaker than a signed clause. Use them to prepare the lease text, then make sure the final contract contains the point.