Guides / Checklist
The 25 Questions That Separate a Good Factory Lease From a Bad One
November 21, 2026
Twenty-five questions are enough to rank most factory offers. They fall into five groups: the building, the utilities, the papers, the money and the exit. Send the first group before you visit. Ask the rest on site, take notes and ask for the answers in writing before you go back for a second visit.
A landlord who answers fast and in numbers is easy to compare. One who answers in adjectives (“big power”, “very good floor”) is not. Push for figures and documents.
Before the first visit (send by email)
These save you a trip to a unit that cannot work.
- What is the usable production area, and what is the total built area? Offices, canopies and mezzanines often sit in the second number.
- What are the clear height, the floor load and the column spacing? Ask for the measurement under the lowest beam.
- What is the transformer size in kVA, and is it dedicated to this unit? Our power supply guide explains the answer.
- Is there an overhead crane, or can the structure take one?
- When can I move in, and in what condition?
On site: the building
- Can I see the structural drawings? Floor load and crane capacity should be on them.
- Has the roof leaked, and when was it last repaired? Ask to see the underside after rain, if possible.
- How many loading docks are there, and what is the truck route from the gate? Our loading dock guide lists what to measure.
- What was the unit used for by the last tenant, and why did they leave? The answer shows the real condition and the typical problems.
- Which parts of the building are shared with others? Walls, gates, roads, car parks and power can all be shared.
On site: utilities and services
- What is the water supply, and is wastewater connected to the park plant? Ask for the discharge limits that apply to your process.
- What happened with power cuts in the last twelve months? Ask the park management as well, and compare the answers.
- Which internet providers reach the unit, and how long does a new line take?
- Who handles security, waste collection and road maintenance in the park?
Papers and approvals
- Do you hold the land use rights or the land lease, and how many years are left? The remaining term of the park’s land lease caps how long you can safely lease.
- Can I see the construction permit and the fire approval and acceptance papers? Check that they match the building as it stands. See our fire approval guide.
- Is my business line allowed in this park and on this site? This affects your investment registration and your enterprise registration.
- Who signs the lease, and can I see proof of authority? For a company, check the registration. For an individual owner, check ownership papers and ask about co-owners.
The money
- What is the full monthly cost? Rent, management fee, pass-through taxes or fees, and VAT, itemised. Our cost guide shows how to compare.
- What deposit and advance rent do you ask for, and when is the deposit returned? Ask if a bank guarantee is accepted.
- How does rent change over the term? Fixed, stepped, indexed, or reviewed. Ask for a cap.
- Is there a rent-free period for fit-out? One to three months is common on a three to five year term.
The exit
- Who pays for repairs to the roof, the structure and the building services? The line between structural and non-structural work needs to be in the lease.
- Can I leave early, and what does it cost? Ask for a break option after a set period, with notice.
- What condition must I hand the unit back in? Ask about reinstatement, and take photos on day one. Our guide on reinstatement at lease end shows what to record.
How to score the answers
Use a simple sheet after each call or visit.
| Group | Pass | Warning sign |
|---|---|---|
| Building | Numbers backed by drawings | Only verbal figures |
| Utilities | Capacity and outage record known | Landlord cannot say |
| Papers | All documents shown | Missing or mismatched documents |
| Money | One itemised monthly cost | Items added later |
| Exit | Break option and reinstatement clear | “We will discuss later” |
A unit that fails the papers group is out, however attractive the rent. The others can often be fixed in the lease, if the landlord is willing.
Looking for a factory now? Send my requirements
Questions that landlords ask back
Expect these in return:
- What is your business line and your product?
- How many workers and what shift pattern?
- What machines will you bring, and what is the total power?
- Which month do you want to start, and for how long?
- Do you have an investment registration, or are you still planning?
Prepare answers. A clear brief gets a clear offer. Our requirements template helps you write one.
Red flags in the answers
Some replies tell you more than the facts do.
- “No problem, we can arrange everything later.” Ask for it in writing now.
- A different figure each time you ask. Rent, area or power that changes between calls shows loose records.
- No documents on the first visit. Landlords who own a proper factory can find the permit and the fire papers.
- Pressure to sign quickly. A deadline built to hurry you is a reason to slow down.
- No clear owner. If you cannot find out who has the authority to sign, stop until you can.
None of these ends the talks alone. Several together mean you should look at a different unit.
How to use the list on a call
Use it as a script. Read the question, write the answer and note the date and the name of the person who replied. After the call, send a summary by email: “Thank you for confirming the following…” and list the answers. If the landlord does not correct it, you have a written record to attach to the lease discussion.
Who should ask
Ideally two people from your side join the visit: one for the building and utilities, such as your engineer or maintenance lead, and one for the contract and money, such as your manager or finance contact. If you cannot visit in person, ask a local adviser to attend and report with photos. Send the question list before the visit, so the landlord has time to bring the right documents. A landlord who prepares is a good sign.
After the visit, rank the units by how complete the answers were, not just how good they sounded. Complete answers mean fewer surprises later.
Keep the list short on the first call
You do not need all 25 answers at once. On a first call, ask only about area, height, power, availability and the full monthly cost. These five decide whether a visit is worth the time. Ask the others when the unit passes that first test. A landlord who feels interrogated on day one may stop replying, while one who gets a few clear questions will usually answer them the same day.
Get a shortlist
We ask these questions, visit the unit and check the papers, and then send you notes and photos for each factory on the shortlist. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
When should I ask these questions?
Ask the first group by email or phone before the first visit, to save a trip. Ask the rest on site, and ask for answers in writing before you go back for a second visit.
What if the landlord will not answer?
A landlord who cannot give the transformer size, the fire papers or the monthly cost is either not ready or hiding something. Treat missing answers as a risk and move that unit down your list.
Should I get the answers in writing?
Yes. Ask for an email reply or a signed fact sheet, then make sure the lease repeats every point that matters. A spoken promise is hard to enforce.
Do these questions work for a park developer and a private owner?
Yes. Developers answer faster and with standard papers, private owners are often more flexible but need more checking of ownership and approvals.
Looking for a factory now?
Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.
Send my requirements