A Requirements Template a Broker Can Search On
November 21, 2026
A good brief lets a broker say “no” to a unit without calling you. It uses numbers, marks what is a must and what is a wish, and states the dates. This page gives you a template to copy, explains each line and shows a filled example. Fill it in, send it, and you will get a shortlist that matches your process, not just your rent.
Why numbers beat adjectives
“Modern, spacious, good power” tells a broker nothing. “2,500 to 3,000 m², 9 m clear height, 630 kVA, 3 t/m² floor, 10 t crane” lets them search a list in minutes. The same applies to dates: “soon” is not a date. Write “keys by 1 April” and the broker can drop units that will not be free.
The template
Copy this and fill in each line. Use “unknown” where you do not yet know, and add your own estimate.
| Item | Your requirement | Must-have or nice-to-have |
|---|---|---|
| Company and industry | ||
| Process in one line | ||
| Production floor area (m², min and max) | ||
| Office area (m²) or number of desk staff | ||
| Warehouse or storage area (m²) | ||
| Clear height (m) | ||
| Floor load (t/m²) and heaviest point load | ||
| Power: connected load (kW), kVA wanted, voltage | ||
| Overhead crane: number, capacity (t), span | ||
| Loading docks and container access | ||
| Utilities: air, gas, water, cooling, wastewater | ||
| Fire or chemical storage needs | ||
| Headcount at start and at full ramp | ||
| Location priorities (areas, ports, workforce, customers) | ||
| Move-in date for keys and for production start | ||
| Lease term wanted, break option | ||
| Rent budget range (typical range, not an offer) | ||
| Expansion: area you may add later | ||
| Deal breakers |
What each line means
Process in one line
One sentence is enough: “SMT assembly and box build for automotive electronics” or “CNC machining and anodizing of aluminium parts”. The process tells a broker about dust, noise, wastewater, air and fire risk without a long description.
Area range
Give a minimum and a maximum. A broker finding a good unit at 3,200 m² when you wrote “3,000 m²” can show it, but only if the range is stated. Separate production, office and storage because listings do the same.
Clear height, floor load, power, crane
These four decide most rejections. Take them from your machine list and your racking plan. If you only have part of the data, say which part. Our guides on floor load, power supply in kVA and overhead cranes show how to find each number.
Utilities
List what the process needs beyond power and water: compressed air, nitrogen, chilled water, process wastewater, exhaust. Read the utilities checklist to see what ready-built units usually include.
Headcount and shifts
Peak headcount decides parking, toilets and canteen. Shifts decide gate traffic and the need for lighting. A plant of 300 workers has different needs from one with 40.
Location priorities
Rank what matters: distance to a port, distance to your customers, workforce supply, distance to your own staff housing. Say which areas you accept and which you do not. “Southern Vietnam” is too wide, but “Binh Duong area or Dong Nai, within 60 minutes of Cat Lai port” is a good brief.
Dates and term
Give the date you need the keys, the date you plan to start production and the lease length you want. Add whether you want a break option. If your dates depend on a customer contract, say so, because it affects how much fit-out time you can allow.
Budget
Give a range for rent in the form “typical range, not an offer”. Ranges seen on public listings for ready-built units in southern parks are about US$4 to US$7 per m² per month. A budget helps a broker avoid units far out of range, and does not commit you.
Deal breakers
Write what makes a unit unacceptable, for example “no flood history”, “no shared walls” or “no business-line restriction in the park”. It saves time on both sides.
Looking for a factory now? Send my requirements
A filled example
This is an example for illustration, not a real client.
| Item | Requirement | Type |
|---|---|---|
| Industry | Metal parts machining and assembly | |
| Process | CNC machining, washing, assembly and packing | |
| Production area | 2,500 to 3,000 m² | Must |
| Office | 150 m², 20 desk staff | Must |
| Storage | 300 m² within the building | Nice |
| Clear height | 8 m or more | Must |
| Floor load | 3 t/m² or more | Must |
| Power | 630 kVA or more, 380 V, dedicated | Must |
| Crane | 5 t, one bay | Nice |
| Docks | 2 docks for 40 ft containers | Must |
| Utilities | Compressed air room, water for washing line | Must |
| Headcount | 80 at start, 160 at full ramp | |
| Location | Binh Duong area or Dong Nai, within 60 minutes of Cat Lai port | Must |
| Keys | 1 April | Must |
| Production start | 1 July | |
| Term | 5 years, break option after year 3 | Nice |
| Budget | Within the typical US$4 to US$7 per m² per month range | |
| Deal breakers | Flood history, shared power, no fire approval for production |
A broker can read this in two minutes and know what to search.
Send it with these attachments
If you have them, add:
- the machine list with dimensions, weights and power
- a rough layout or a sketch
- the product types and the materials used
- any customer audit requirements that affect the building
- a short list of chemicals or gases you plan to store
None of these is required to start. A brief with half the data is better than waiting for a complete one.
Must-have or nice-to-have
Mark every line, and be strict. A must-have is something that, if missing, stops production or breaks a customer contract. A nice-to-have is something you would trade for a lower cost or an earlier date.
A useful test: if a unit met every must-have and failed every nice-to-have, would you lease it? If yes, you have the lists right. If no, move something from the nice list to the must list. And if everything is a must, the broker cannot find anything, so ask which two lines you could relax.
Common mistakes in a brief
- Too wide a range. “2,000 to 8,000 m²” returns units for different businesses. Narrow it to what you can actually use.
- Missing dates. Without a move-in date, units that will not be free for a year stay on the list.
- Leaving out the process. A broker cannot judge fire and wastewater fit without knowing what you make.
- Asking for everything. A crane, 12 m height, 2,000 kVA and a low rent do not often come together.
- Hiding the budget. A rough range saves time. It is not a commitment.
- Forgetting people. Headcount drives parking, canteen and housing needs.
What happens next
A broker reads the brief, filters units on the numbers and visits those that fit. The next step is a shortlist with notes and photos. See our guide on questions to ask a factory landlord for the follow-up visit.
Update the brief as you learn
The first brief is a starting point. After the first shortlist and visits, you will know more: that the height you asked for is not common, or that the power is the real limit. Send an updated brief with the new numbers and a note on what changed. Brokers search again from the new version, and the second shortlist is usually much closer to what you need.
Get a shortlist
Copy the template, fill in what you know and send your requirements. We reply within 24 business hours and send a shortlist of up to 5 factories we have checked on site. Tenants pay nothing.
Frequently asked questions
What should a factory requirements brief include?
Area range, clear height, floor load, power in kVA, crane needs, docks, location priorities, move-in date, lease term and any special utilities or permits. Use numbers, not adjectives.
How detailed should the brief be?
Detailed enough that a broker can reject a unit without calling you. Mark each line as must-have or nice-to-have. If you do not know a number, write your own estimate and say it is an estimate.
Do I need a final layout before I send the brief?
No. A machine list with dimensions, weights and power is enough. A rough layout helps but you can refine it after the first shortlist.
Does it cost anything to send a brief?
Not with us. Tenants pay nothing for the search or the shortlist. The owner pays our fee when a lease is signed.