Does a Factory Tenant in Vietnam Need Its Own Environmental Permit?
November 9, 2026
In most cases the tenant, not the landlord, is responsible for the environmental permit or registration of its own factory operation. The Law on Environmental Protection 2020 ties the requirement to the project and the waste it creates: wastewater, dust or exhaust gas that need treatment and hazardous waste. Larger and higher-risk projects need an environmental permit before official operation, and small ones may only need a registration. The landlord and the park provide the base infrastructure, such as the wastewater plant, but they do not carry your permit for you.
This is general information, not legal advice. The categories, thresholds and issuing offices change, and a licensed environmental adviser or the park management board should confirm what applies to you.
What decides your category
Vietnamese law sorts projects by size and environmental risk. The list and thresholds are in the implementing decrees of the Law on Environmental Protection 2020, which have been amended since 2022. Three factors usually decide the category:
- Industry. Plating, dyeing, tanning, chemicals, paper, food processing with high wastewater and similar lines are at the higher end. Assembly of electronics and light mechanical work are typically lower.
- Scale. Output, wastewater volume, exhaust volume and land area.
- Waste. Whether you create hazardous waste or discharge to the environment.
Decree amendments in 2025 added some exemptions from registration for small facilities, for example those producing small volumes of waste or treating very small amounts of wastewater. Check your numbers against the current text before you rely on any exemption.
What a tenant usually has to do
| Item | Who | Notes |
|---|---|---|
| Environmental category of your project | Tenant with adviser | Based on process and scale |
| Permit or registration | Tenant | Permit for larger or higher-risk projects, registration for small ones |
| Impact assessment where required | Tenant | A separate study. See EIA for tenants |
| Wastewater connection to the park plant | Tenant and park | Written acceptance of your discharge quality and volume |
| Wastewater pre-treatment | Tenant | If your discharge exceeds the park’s limits |
| Hazardous waste handling | Tenant | Registered storage and a licensed collector |
| Exhaust and dust control | Tenant | Filters, stacks and monitoring where required |
| Monitoring and reports | Tenant | Periodic reports to the authority |
What the landlord and the park provide
A park usually has its own environmental approvals and a central wastewater plant. That helps, but it has limits.
- The park’s papers cover the park, not your process. Ask for the park’s discharge limits and what the plant is designed to treat.
- A building may have been built for warehouse use. Your process may change the environmental profile of the site.
- The landlord may need to cooperate in your permit file, by providing site papers and consenting to works such as pre-treatment tanks or stacks.
Write the landlord’s duty to help into the lease, and agree who pays for any pre-treatment or exhaust works that stay in the building.
When it matters in the timeline
The permit is tied to starting official operation. For projects that need it, you generally cannot operate commercially without it. The permit process also covers a trial run of treatment equipment, so allow time for that. Plan the environmental steps in parallel with the registration and the fit-out, not after them.
A typical order:
- Shortlist stage. Ask the park what industries and discharge it accepts, and get a written confirmation for your process.
- Before the lease. Work out your category with an adviser. If an impact assessment is needed, ask when it must be filed and who approves it.
- After the lease and registration. Prepare the permit file with the layout, the treatment design and the site papers.
- During fit-out. Install treatment equipment, storage and monitoring points.
- Trial operation. Run and measure under the rules.
- Before official operation. Hold the permit or registration that applies.
Some investment projects in industrial parks can use a faster procedure with fewer pre-approvals, replaced by commitments and checks after the start. Ask the park management board whether your project qualifies. See lease and investment registration.
Questions to ask before you sign
- Does the park accept my industry? Is this written in the park rules? See business line and park fit.
- What are the discharge limits, and what is the charge per cubic metre? See water and wastewater cost.
- Does the landlord have an existing permit or approval for the building, and does it name the activity I plan?
- Will the landlord sign the papers my permit file needs, and within how many days?
- Who pays for pre-treatment, stacks, fume extraction and hazardous waste rooms?
- Does the lease allow me to install equipment on the roof, the yard or the wall?
- What happens to the rent and the term if the permit is delayed? Can I get a rent-free period tied to the permit date?
Looking for a factory now? Send my requirements
Mistakes to avoid
- Assuming the park’s approvals cover you. They do not replace your own file when you are required to have one.
- Starting production for a trial without the right approval. Operating outside the rules can bring fines and stoppage.
- Skipping the wastewater test. A process that fails the park’s limits needs pre-treatment before connection.
- Leaving it until fit-out is finished. Treatment equipment needs space and power in the layout.
- Ignoring waste contracts. Hazardous waste needs a licensed collector from day one.
How it links to other checks
The environmental file touches the same papers as fire safety, land and construction. Check them together with the ready-built factory checklist, and review any change of use under fire safety approval.
Typical items by process
The categories below are examples of what to look at, not a ruling on your project.
| Process | Points to examine |
|---|---|
| Assembly and packing | Packaging waste, small volumes of domestic wastewater, lighting and noise |
| Machining and metalworking | Cutting fluids, metal chips, oil waste, dust and fumes from welding |
| Plastics | Fumes and dust from moulding and recycling, cooling water, scrap |
| Surface treatment | Wastewater with metals, chemicals storage, exhaust treatment. Often only allowed in selected parks |
| Food | High organic wastewater, odour, grease traps, cold room refrigerants |
| Furniture and wood | Dust, solvent fumes from finishing, wood waste and fire load |
If your process sits in the lower rows of risk, plan for pre-treatment and a longer file. If it sits in a row that the park does not accept, choose another park.
Who to talk to
Start with the park management company. They know the discharge limits, the authority that handles files in the park and the local practice. Then involve an environmental consultant who can classify your project and prepare the file. The consultant can also tell you whether an impact assessment applies and who approves it. Ask for the scope in writing, including who attends meetings with the authority and how many rounds of revisions are included.
How the lease should reflect the permit
Link the lease to the permit steps so that you are not paying full rent for a unit you cannot yet use.
- Rent-free or reduced rent until the permit or registration date, or for a set period after handover.
- Landlord cooperation. The landlord supplies papers and signs consents within a set number of days of your request.
- Works allowed. The lease allows treatment tanks, stacks, storage rooms and monitoring points, and sets the rules for removing them at the end.
- Termination right. If the permit is refused for a reason not caused by the tenant, the tenant may end the lease and recover the deposit.
These points are easier to agree before signing than after your fit-out has started. See also the lease agreement clause guide.
Get a shortlist
We note the park’s accepted industries and wastewater arrangements while we check each factory, so a unit that cannot take your process does not reach your shortlist. Send your requirements and we reply within 24 business hours. Tenants pay nothing for the search.
Frequently asked questions
Does a tenant in an industrial park need an environmental permit?
Many do, because the permit attaches to the project and its emissions, not to the building. Larger or higher-risk projects need a permit before official operation, and small ones may only need a registration. The category depends on your process, so ask your adviser.
Can I rely on the park's wastewater plant instead of a permit?
Connection to the park's wastewater plant is usually needed and does not by itself replace your permit or registration. You will need the park's written acceptance of your discharge as well.
When should I start the environmental work?
At the shortlist stage, before you sign. Permit steps, trial operation and approvals take time and can delay production if you start after fit-out.
Is an environmental impact assessment the same as a permit?
No. An environmental impact assessment is a study for certain projects. A permit is the licence to operate and discharge. Some projects need both.