Taking Over a Running Factory and Its Equipment From a Leaving Tenant
November 21, 2026
You can take over a running factory in Vietnam in three ways: sign a new lease with the landlord and buy the equipment from the leaving tenant, take over the tenant’s existing lease with the landlord’s consent, or buy the company that holds the lease. The first route is usually the cleanest. The third carries the history of the company with it. Whatever route you pick, check four things before paying: who owns the land and building, who owns each machine, which permits transfer and what happens to staff.
This guide is general information, not legal or tax advice. Use a licensed adviser for the contract.
Why take over a running unit
- Speed. Power, fit-out, compressed air and offices exist. You may start in weeks rather than months.
- Lower fit-out cost. You pay for the used fit-out instead of building new.
- Existing approvals for a similar process. Fire approval and acceptance may already match.
- Possible workforce and supplier links. Only if the structure allows it.
The risks are the same items in reverse: old equipment, hidden liabilities, papers that do not match and staff issues.
The three routes
| Route | How it works | Main risk |
|---|---|---|
| New lease plus asset purchase | You sign a lease with the landlord. You buy listed machines and fit-out from the leaving tenant | Equipment ownership and liens |
| Assignment of the existing lease | The tenant transfers its lease to you, with landlord consent | Terms stay as they are, unpaid debts and obligations can follow |
| Share or company purchase | You buy the company, with its lease, assets and liabilities | You inherit history: tax, labour, environmental |
For most foreign tenants, the first route gives a clean start with the benefit of the equipment. The lease is new, on your terms. See our guide to subleasing for cases where the landlord does not take part.
Step 1: confirm the building
Go through the normal landlord papers. The leaving tenant’s lease is only as good as the landlord’s rights. Ask to speak to the landlord directly. Confirm remaining lease term, rent, deposit held and any arrears. If the landlord sells, your position changes, as covered in our post on a landlord selling the factory.
Step 2: list and prove the equipment
Make a schedule with one line per item.
- Description, make, model, serial number and year.
- Location in the unit.
- Who owns it, with proof: purchase invoice, customs declaration for imports, transfer papers.
- Whether it is pledged to a bank, leased from a supplier or on loan from a customer.
- Condition and last service.
- Whether it was imported with tax exemptions. If so, transfer may require customs steps. Ask a customs adviser.
Look for items that look like equipment but belong to someone else: customer tooling, moulds, leased compressors. Ask for written confirmation of ownership of each.
If you plan to add used machines of your own, read the rules in our guide to importing used machinery.
Step 3: test before paying
Run the machines. Ask for a test run with your material. Check power draw against the transformer. Check floors for cracks under heavy machines, oil stains and wear. Compare with the floor load and the power guide. Do not pay for a machine that cannot be tested.
Step 4: papers and approvals
| Item | What to check |
|---|---|
| Fire approval and acceptance | Does the approved use match yours? The papers stay with the building |
| Environmental documents | Held by the old company, usually not transferable. Ask your adviser what your project needs |
| Investment registration and business line | Your company needs its own, matched to the park |
| Customs and tax status | Your adviser checks. EPE status, if any, is held by the company |
| Utility accounts | Power, water and wastewater contracts move to your name. Agree meter readings on the day |
Review our guides to fire approval for a change of use and environmental permits.
Step 5: staff
Existing workers can be a benefit or a problem. If the business is transferred, Vietnamese labour rules on change of ownership can apply, and contracts, seniority and social insurance records matter. Do not promise jobs or assume you can leave staff behind without checking. Ask a labour adviser before you sign. Our guide to hiring workers around a new factory covers the hiring side.
Looking for a factory now? Send my requirements
Step 6: structure the payment
Pay in stages tied to events, not all on signing.
- A small payment on signing the asset schedule.
- The main payment on handover of the unit, equipment and keys, with a signed handover report.
- A holdback for a short period to cover hidden defects or unpaid bills.
Ask for proper VAT invoices for the asset sale. Your adviser should confirm tax treatment. Hold the money in a way that lets you stop payment if a lien appears.
Step 7: what the lease must say
- The landlord consents to the new tenant and the use.
- The deposit position: does the old deposit stay, is it refunded to the old tenant and replaced by yours?
- Who is responsible for damage that existed before handover?
- Reinstatement at the end: what must you remove? Items left by the old tenant could become your duty. See reinstatement at lease end.
Warning signs
- The seller cannot show ownership papers.
- A bank or supplier has a claim on machines.
- The tenant wants a fast cash deal and no landlord meeting.
- Utility bills or rent unpaid.
- The tenant is leaving because the building has a problem it will not name. Ask why.
What to model in the budget
Put each cost on its own line. The figures below are labelled as an example only.
| Line | Example note |
|---|---|
| Price for equipment and fit-out | Agreed from the schedule, line by line |
| New lease deposit and advance rent | Typically 3 to 6 months of rent as a deposit on listings, plus rent in advance |
| Replacement of items you reject | Machines that fail the test run |
| Re-layout or re-wiring | Your process may differ from the old one |
| Approvals or updates | Fire, environmental, registration, if your use differs |
| Cleaning and removal of leftovers | Scrap, chemicals, unneeded racking |
| Legal and adviser fees | Lease, asset sale, tax and labour review |
Compare the total with the cost of an empty unit plus new equipment. Used equipment is attractive when it is in good condition and matches your process. It is expensive when you must rebuild half of it. See our fit-out cost guide for the line items of a new fit-out.
Questions for the landlord
- Will you sign a new lease with me, and on what terms?
- Are there arrears, claims or disputes with the current tenant?
- Is the fire approval current for the way the unit is used now?
- Has the tenant made changes you did not approve?
- What condition will the unit be in at handover, and who pays to clear what is left?
A landlord who is open on these points is easier to work with for the next three years.
Get a shortlist
Some of the units we see are being vacated by a tenant who wants to sell fit-out or equipment. We check the building and the papers on site and tell you what we could not verify. Send your requirements and say if a unit with machines in place would suit you. We reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
Can I take over a factory lease from the current tenant?
Only if the lease allows it or the landlord agrees in writing. The usual routes are an assignment of the lease, a new lease with the landlord, or buying the company that holds the lease. Each has different risks.
Who owns the machines when a tenant leaves?
The tenant, unless the lease, a bank or a supplier says otherwise. Ask for proof of ownership and check for liens before you pay for any equipment.
Do the permits of the old tenant pass to me?
Usually not automatically. Many permits and registrations are held by the company, and your project may need its own. Fire approval stays with the building for its stated use.
What happens to the workers?
If you take over a business, the labour rules on change of ownership can apply. Ask a labour adviser before you agree to take staff or to leave them behind.