Lighting in a Leased Factory: Levels, Daylight and What Gets Measured

November 21, 2026

A factory passes a lighting audit when the measured light at the work surface meets the level set for the task, with limits on glare. In Vietnam that level comes from QCVN 22:2016/BYT, and the check is made by a qualified body during workplace environment monitoring. The building helps or hurts through its roof lights, its height and its surfaces. Everything else is fixtures, which a tenant adds.

This guide is general information, not legal advice. Your occupational safety adviser or monitoring body confirms the values for your tasks.

What the regulation is

QCVN 22:2016/BYT is the national technical regulation on lighting, permitted lighting levels at the workplace. The Ministry of Health issued it by Circular 22/2016/TT-BYT, effective 1 December 2016. It applies to indoor workplaces and to the bodies that monitor them, and to employers.

The technical part is organised by type of space: general indoor areas, industrial and craft work, public areas, schools, health care and airports. The industrial and craft section is the one a factory uses. It sets a minimum maintained illuminance, written as Em, for each type of task. It also limits glare through the unified glare rating, UGR.

Two terms help when you read an audit report.

  • Maintained illuminance (Em). The average light level on the work surface that must be kept up over time, including dirt on fixtures and ageing lamps. Light output falls as fixtures get dirty, so a new installation is designed above the limit.
  • UGR. A score for glare from the fixtures. A lower score means less glare. The regulation sets a maximum per task.

We do not quote lux values here. They differ by task and the table in the regulation is the only safe source. Ask your adviser to mark the rows for your tasks, such as assembly, inspection, packing, warehousing and offices.

Vietnam also has TCVN 7114-1:2008 for lighting of indoor workplaces, based on ISO 8995-1:2002. The international standard has since been replaced by ISO/CIE 8995-1:2025. We found no Vietnamese adoption of the new edition, so confirm with your adviser which document your customers cite. Some foreign buyers and audit programmes use their own lighting criteria. See our guide to factory audit requirements.

Who measures and when

The Law on Occupational Safety and Hygiene requires an employer to arrange workplace environment monitoring at least once a year for harmful factors that have national limits, and to use an organisation that meets the legal conditions. Lighting is one of the factors measured, together with noise, heat, dust and chemicals. The monitoring body records readings at the work points and issues a report. If a reading falls short, the employer must fix the cause and keep records.

In practice you should also measure once at handover, before fit-out, so you know what the building gives and what you must add. Keep the readings with the handover report. See the handover condition guide.

What the building gives you

Building feature Effect on lighting What to check
Roof lights Free daylight in the day, but also heat and glare Number, size, condition, spread across the roof
Wall openings and windows Side light, mostly near the walls Clean glass, no blocked openings
Clear height Fixtures hung high spread light wider but lose level on the floor Mounting height and available brackets
Wall and ceiling colour Light-coloured surfaces bounce light and help Paint condition
Floor finish A glossy floor can reflect glare Epoxy or polished slab
Electrical capacity Lighting is a small load, but a big upgrade adds up Spare circuits at the distribution board
Emergency lighting Needed on escape routes Working battery fixtures and exit signs

Daylight is useful but not constant. Rain, evening and shift work all need electric light. Plan the electric system as if daylight did not exist, and treat daylight as a saving.

Roof lights and heat

Translucent roof sheets bring light and heat in together. Old sheets turn yellow, crack and leak. Too many roof lights heat the hall, and too few leave dark areas. Look at them in the afternoon and after rain. Our roof guide shows what to look for on the heat side.

Fixtures

Existing fixtures may be old and fall short on level, glare and colour rendering. Many tenants replace them with efficient LED fittings designed for high bays. The cost depends on the number of fixtures, so ask for a lighting plan from a supplier. The work belongs in the fit-out budget. Because lighting runs for long hours, the saving shows on the electricity bill quickly.

Looking for a factory now? Send my requirements

Matching light to the work

Different tasks need different levels. In general, the finer the detail and the higher the cost of an error, the more light and the tighter the glare control the work needs.

  • Detailed assembly, inspection and electronics. Need the highest levels and good colour rendering. See electronics factories.
  • Sewing and finishing. Need steady, shadow-free light at the machine. See garment factories.
  • Warehouse and storage. Lower levels, but light must reach the aisles between tall racks.
  • Offices. Follow the office rows of the regulation, with screens in mind.

Check the position of machines against the fixtures as well. Machine bodies, racking and partitions cast shadows that a general average does not show. Task lamps fix local gaps cheaply.

Questions to ask the landlord

  • How many roof lights does the building have, and are they intact?
  • Is the lighting circuit separate from power, and how much spare capacity is there?
  • Can we change the fixtures and fix brackets to the structure?
  • Are there recent lux readings or monitoring reports from the last tenant?
  • Is emergency lighting installed and tested?

A practical sequence for a tenant

  1. Before signing. List your tasks by area. Ask the landlord for the roof light count and the electrical single-line drawing.
  2. At the visit. Walk the hall in daylight and note dark corners. Return after dark or ask for photos of the lit hall if shifts will run at night.
  3. At handover. Measure the existing level at working height on a grid and record it.
  4. During fit-out. Ask the supplier for a lighting plan that shows the level for each task, the glare rating and the control zones. Put switches in zones so that a part of the hall can be dimmed when daylight is strong.
  5. After move-in. Schedule the first monitoring survey and clean fixtures and roof lights on a regular cycle. Dirt cuts light more than most people expect.

Controls and sensors can save energy, especially where daylight is strong. Daylight sensors dim fixtures under roof lights, and motion sensors suit warehouse aisles. Check that the electrical design leaves room for them.

Common problems

  • Yellowed or cracked roof sheets. They pass less light than they should and leak.
  • Dirty fixtures. Dust and oil mist cut output. Clean on a schedule.
  • A mix of old and new fixtures. Uneven light and different colours across one hall.
  • Flicker. Cheap drivers cause eye strain and can show on camera-based inspection.
  • Dark aisles. Light designed for open floor, then blocked by racking.
  • Glare from glossy floors or bare lamps. Shielded fixtures and matt finishes help.

Each one has a cheap fix, but list them in the handover report so that the landlord restores what belongs to the building, such as roof sheets.

Get a shortlist

Tell us your tasks and shifts, and we will note the roof lights, fixtures and electrical capacity at every unit we visit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

Which regulation sets workplace lighting levels in Vietnam?

QCVN 22:2016/BYT, issued by Circular 22/2016/TT-BYT of the Ministry of Health, sets the permitted lighting levels at indoor workplaces. It lists values by type of area and task. We found no replacement, but confirm the current text with your adviser.

Who measures lighting in a factory?

A qualified workplace environment monitoring body, hired by the employer. The Law on Occupational Safety and Hygiene requires monitoring at least once a year for harmful factors with national limits.

Do ready-built factories come with enough light?

Often not for detailed tasks. Many units have roof lights and basic fixtures designed for storage or general work. Assembly, inspection and electronics usually need added fixtures, which is a tenant fit-out cost.

Who pays for lighting upgrades?

Usually the tenant, as part of fit-out. If roof lights are broken, dirty beyond cleaning or missing from the approved design, ask the landlord to restore them at handover.