What Do BSCI, SMETA and RBA Audits Check in a Factory Building?
November 21, 2026
Social and safety audits look at people first, but the building decides how many findings they raise. Auditors walk the site, read documents and talk to workers. Their reports often list exits blocked, extinguishers out of date, electrical panels open, chemicals badly stored and papers missing. Many of these come from the building rather than from management. If you choose the unit with the audit in mind, you start ahead.
This guide covers the three schemes foreign buyers use most in Vietnam, the building items they check and how to test a unit for them. It is general information. Each scheme publishes its own current rules, and your buyer decides which one applies.
The three common schemes
| Scheme | Run by | Common in |
|---|---|---|
| amfori BSCI | amfori, a trade association of retailers and brands | Retail, apparel, home goods, many consumer products |
| SMETA | Sedex, a supply chain data platform. SMETA is the audit method | Retail, food, consumer goods |
| RBA VAP | Responsible Business Alliance, Validated Assessment Program | Electronics and related industries |
They share the same core: labour standards, working hours, wages, health and safety, environment and management systems. Health and safety is where the building comes in. Rules and versions change, so ask your buyer for the current protocol and any checklist in advance. The audit calendar and rules of amfori are on its audit help page.
Unannounced audits are the new normal
Some schemes now add unannounced visits. amfori states that it no longer accepts requests for fully announced BSCI audits from its members since 1 September 2024. In practice, you cannot clean up the week before. The unit must be ready every day. That favours buildings that are in good order from the start and clear about who maintains what.
What auditors check in the building
Legal papers for the site
Auditors usually ask for the papers that show the site is allowed to operate: construction permit or acceptance, fire prevention approval and acceptance, environmental papers and the land and building documents. A unit with missing approvals is a risk for you, even if the landlord holds the files. See our guide on fire safety approval and landlord papers and due diligence.
Fire safety
| Item | What the auditor looks for |
|---|---|
| Exits | Enough exits, doors that open outward and are never locked or blocked |
| Escape routes | Marked, lit and clear, with floor markings and exit signs |
| Alarm | Working fire alarm, audible across the site |
| Extinguishers | Right type, mounted, signed and in date |
| Hydrants and sprinklers | In service, with records of testing |
| Drills | Evacuation drills done, recorded and attended by workers |
| Emergency lighting | Works when power fails |
Fire codes and the fire approval set the rules for the building itself. See QCVN 06 fire safety and fire alarms and hydrants.
Electrical safety
Auditors look at panels, cables and earthing. Open panels, daisy-chained extension leads, burnt sockets and missing labels are common findings. See lightning protection and electrical safety.
Machines and equipment
Guards on moving parts, emergency stops, lock-out practice and valid inspection certificates for boilers, pressure vessels, cranes and lifts. See equipment safety inspection.
Chemicals
Labelling, safety data sheets, separate storage, spill control and worker training. The building supplies the storage room, floor containment and ventilation. See chemical storage requirements.
Working environment
Lighting, temperature, ventilation, noise and air quality. Auditors may ask for measurement records. See factory lighting, heat and noise and ventilation.
Welfare and facilities
Clean toilets in enough number, drinking water, a canteen that is hygienic, rest areas, first aid and a space for nursing mothers where relevant. See canteen, toilets and parking.
Housing
If workers live in a dormitory, auditors check the room size, beds, fire safety, sanitation and freedom to leave. See factories with dormitories.
Choosing a unit that is easier to pass
Use this checklist on each site visit.
- Papers complete. Ask for fire approval and acceptance, construction papers and environmental papers up front.
- Exits and layout. Count exits and measure the distance from the far corner of the hall. Look at the stairs, mezzanines and offices.
- Fire systems working. Ask for test records for the alarm, hydrants and sprinklers.
- Electrical room tidy. Open panels, loose wires and rust are red flags.
- Space for chemicals. Is there a room or yard area for a proper store?
- Welfare space. Is there room for toilets, a canteen and changing rooms without breaking the production flow?
- Lighting and airflow. Daylight, ventilation and a roof that does not leak.
- Surroundings. Open drains, waste piles and traffic conflicts show up on site tours.
Add a line item for audit fixes in your fit-out budget. See fit-out costs.
Looking for a factory now? Send my requirements
Who fixes what
Use the lease to avoid dispute later.
| Item | Usually the landlord | Usually the tenant |
|---|---|---|
| Structure, roof and base fire systems | Yes | Reports faults |
| Fire approval and acceptance of the building | Yes | Updates it for changes of use |
| Signs, extinguishers and layout inside the unit | Sometimes at handover | Yes during operation |
| Machines, guards and storage | No | Yes |
| Records and training | No | Yes |
Include in the lease a handover report with photos and a list of faults. See handover condition report.
Shared buildings and shared services
In a shared building, the auditor sees one structure with several users. Exits, stairs, fire alarms and sprinklers may belong to the landlord or the park, yet a blocked exit in a neighbour’s bay can still appear in your report. Ask who controls the common areas, how the fire alarm zones are split and how the landlord will respond if a neighbour causes a finding. A standalone unit is simpler to control. See standalone versus shared factories. If you share a gate, a canteen or a dormitory, write the rules for those services into the lease.
Before the first audit
A short preparation routine pays off. This is a routine, not a legal requirement.
- Ask the buyer for its checklist or protocol. Most schemes publish their questions, and buyers often add their own.
- Do a mock walk-through. Use the checklist and walk the site with a person who did not set it up. Fresh eyes spot blocked doors and open panels.
- Collect papers in one folder. Permits, approvals, test reports, inspection certificates, training records and drill records.
- Fix cheap items first. Signs, labels, extinguisher dates, housekeeping and lighting.
- List the big items for the landlord. Structure, roof, base fire systems and approvals. Send the list in writing and keep the reply.
- Train the team on how to receive an auditor. Who greets them, who holds the keys, who answers technical questions and where the papers are.
Findings that start with the building
These come up often enough to plan for.
| Finding | Likely building cause |
|---|---|
| Exit blocked or locked | Layout leaves too little space for racks and aisles |
| Escape distance too long | Hall depth and exit positions |
| No emergency lighting | Missing or failed base systems |
| Overheated or crowded workstations | Poor roof insulation and ventilation |
| Dark work areas | Too few skylights or poor lighting layout |
| Chemicals stored in the hall | No suitable store room |
| Flooded access in the wet season | Drainage and floor level. See flood risk |
| Worker toilets too few or far away | No space planned for welfare rooms |
If you can see these on the site visit, you can price the fix and ask the landlord to share the cost, or you can choose another unit.
Get a shortlist
Tell us which audit scheme your buyer uses and the headcount you plan. We check exits, fire systems, papers and welfare space on site before a unit reaches your shortlist. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
Which audit schemes do buyers use in Vietnam?
The common ones are amfori BSCI, SMETA from Sedex and the RBA Validated Assessment Program for electronics. Retail and brand buyers may also have their own supplier audit.
Do these audits check the building?
Yes, mainly health and safety: fire exits, extinguishers, alarms, electrical condition, chemical storage, ventilation, lighting and welfare rooms. They also check the legal papers for the site.
Can the factory be audited without notice?
More audits now include an unannounced element. amfori no longer accepts fully announced BSCI audit requests from its members since September 2024, so the building must be audit-ready every day.
Who pays to fix building faults found in an audit?
It depends on the fault and on the lease. Structure, roof and base services are normally the landlord's. Fit-out, signs, equipment and housekeeping are the tenant's. Agree the split before you sign.