Why Your Process Decides Which Factory Building Fits
November 21, 2026
Every production and storage room in a Vietnamese factory has a fire hazard class, and the class of the building follows from its rooms. The class is not a label on the door. It decides how fire resistant the structure must be, how big a compartment can be, how far people may travel to an exit and which fire systems are required. A building approved for a low class can be the wrong building for your process, however good the rent.
This guide is general information, not engineering advice. The consultant and the fire authority make the final call for your case.
The classes
The method sits in QCVN 06:2022/BXD, in the annex on the explosion and fire hazard of production and storage rooms. Rooms are tested from the most dangerous class downward, and the first class that fits applies.
| Class | In plain words | Typical trigger |
|---|---|---|
| A | Very high explosion and fire hazard | Examples: flammable gases and very volatile liquids |
| B | High explosion and fire hazard | Examples: combustible dusts and liquids that can form explosive mixtures |
| C1 to C4 | Fire hazard from combustible materials | Combustible solids and liquids, ranked by how much can burn per square metre |
| D | Moderate hazard | Non-combustible materials handled hot, glowing or molten or in ways that give off sparks, flames or heat |
| E | Low hazard | Non-combustible materials handled cold |
The split of C into four steps follows the specific fire load, which is the heat energy of the combustible material per square metre of floor. The numeric limits sit in the code table, so we do not quote them here. Your consultant will use the table with your real quantities.
The building takes its own class from its rooms. The code sets rules on how much floor area of each class a building may hold before the whole building moves up a class. That is why one small paint room can change more than its own walls.
What the class controls
| Item | How the class affects it |
|---|---|
| Fire resistance of the structure | Higher classes need more resistant columns, beams, roof and walls |
| Fire compartment size | The permitted area of a compartment shrinks as the class rises |
| Distance between buildings | Higher classes need more separation |
| Escape distance | The distance to an exit depends on the class and on how many people work in the space |
| Fire systems | Alarm, sprinklers, smoke exhaust and water supply requirements follow the class and size |
| Explosion protection | Class A and B rooms may need explosion relief and special electrical equipment |
Details differ by case, which is why your consultant must work from the approved design. Our guide to QCVN 06 shows where these topics sit in the code.
Matching a process to a class
The examples below show the direction of travel. They are not a ruling, since quantities and layout change the answer.
| Process | Usual direction |
|---|---|
| Spray painting, solvent cleaning, adhesives with flammable solvents | Toward A or B, often in a separate room |
| Woodworking, furniture, textile and garment, paper and packaging with large stocks | Toward C |
| Plastics moulding with large stocks of raw material and finished goods | Toward C, with the stock level mattering most |
| Welding, heat treatment and casting of metals | Toward D |
| Cold machining of metal and assembly of non-combustible parts | Toward E, unless oils or packaging add load |
Notice that packaging and oils matter. A metal parts line with large stocks of cardboard and foam is not a pure class E room. Fire load counts all the combustible material in the room, not only the product.
A simple example
This is an example, not a case. A tenant plans CNC machining plus a finishing area with a solvent-based coating line. The landlord’s building was approved for machining and light assembly. The machining area fits a low class. The coating line, with solvent storage and mixing, may need its own separated room at a higher class, with ventilation and electrical protection. The tenant either builds that room and gets a new approval or picks a unit already approved for the coating process. Finding that out after signing costs months.
Looking for a factory now? Send my requirements
How to check this before you commit
- Write down the process. List every step, every material, the quantities in the room and the storage heights. Include packaging.
- Ask for the building’s approved class. It appears in the fire design file or can be read from it. Ask the landlord for the approval and the approved drawings.
- Get a class per room from a consultant. Share your list and the layout. Ask for a short written opinion.
- Compare. If your rooms need a class above the building’s, ask what changes are needed and who pays.
- Put the answer in the lease. The landlord confirms the approved use, and the lease sets out the deadline and cost split for any new approval.
Our guide to fire approval and change of use lists the lease clauses. The general fire approval guide lists the papers.
Which industries need extra care
- Plastics and rubber. Stock levels drive the class. See plastic injection factories.
- Furniture and wood. Dust and finishing add risk. See furniture factories.
- Chemicals and batteries. Storage rules apply on top. See chemical storage.
- Electronics. Usually low load, but packaging stock and soldering fluxes add up. See electronics factories.
What to do if the class does not match
Do not stretch the use. Choose one of three paths. Pick a building already approved for your class. Ask the landlord to carry out the works and apply for the new approval, with the cost and schedule in the lease. Or split the process so that the higher-hazard step sits in a separated room or a separate building. The third path often costs less than rebuilding the whole unit.
Reading the class on the building’s papers
Where does the class appear? The fire design file normally states the hazard class of the building and of its main rooms, together with the fire resistance and the compartments. It may be written as a letter and number, such as C2 or D. If the papers do not show it, ask the landlord’s designer or the fire consultant who prepared the file. Check three details.
- Which rooms carry which class. A building may mix a low class in the hall with a higher class in a chemical store.
- The date. A file approved years ago followed the code of that time. The class names have stayed similar, but the thresholds and the rules around them have changed between editions.
- The layout. Compare the approved plan with what stands today. Added offices, racking and mezzanines change the picture.
Talking to the consultant
Give a consultant what they need to answer in one round: the list of materials with quantities, the largest amount stored in each room at one time, the way goods are stacked, the heating or hot work steps and the number of people. A short, honest process sheet saves a second visit. Ask for the class of each room, the class of the building and a list of what the approved design must change to match.
Get a shortlist
Tell us your process, materials and storage heights, and we will compare them with the approved use of each unit we visit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
What are the fire hazard classes for production in Vietnam?
Under QCVN 06:2022/BXD production and storage rooms are classed A and B for explosion and fire hazard, C1 to C4 for combustible materials, D for non-combustible materials handled hot and E for non-combustible materials handled cold.
Who decides the hazard class of my rooms?
A licensed fire design consultant works it out from your process, materials and quantities, using the method in the code. The fire authority checks it during design review. Do not rely on a landlord's opinion alone.
Can I run a higher-hazard process in a building approved for a lower class?
Not safely or legally without a new approval. The class drives fire resistance, compartment size, escape distance and sprinkler needs, so a higher class usually means design changes. Ask a consultant before you sign.
Does a small stock of solvents or plastics change the class?
It can. The class depends on the substance and the amount in the room. A small, properly stored quantity may stay within the room's class, but the consultant must assess it with your quantities.