What Does an Injection Moulding Plant Need From a Leased Factory?
November 21, 2026
An injection moulding plant needs a building with a strong, flat floor, plenty of three-phase power, outdoor space for chillers and cooling towers, and a plan for moving heavy moulds. Check those four things in this order: power, floor, cooling and mould handling. Rent per m² matters far less than finding a unit where these already fit.
This guide covers injection moulding plants for parts, packaging and technical components, in standard ready-built units in southern Vietnam.
The key specs at a glance
| Spec | Why it matters | What to ask |
|---|---|---|
| Power in kVA | Presses, heaters, dryers and chillers run continuously | Transformer size, dedicated or shared, upgrade time |
| Floor load | Presses weigh tens of tons and moulds add point loads | Slab rating, thickness, foundation options |
| Clear height | Mould changes, hoppers and overhead feeds need height | Clear height under the beam |
| Crane | Moulds from a few hundred kg to many tons | Crane beams, capacity, hook height |
| Outdoor space | Chillers, cooling towers and silos | Yard size, roof loading, noise limits |
| Ventilation | Heat from presses and melting | Roof vents, insulation, fans |
| Docks | Resin in, finished parts out | Docks, truck turning space, covered store |
Power
Injection presses draw power continuously for heating barrels and for hydraulics or servo drives. Electric machines use less than hydraulic ones, but the total load still grows fast with each press. Chillers, dryers, mould temperature controllers, conveyors, crushers and compressors add to it.
Method to estimate:
- List each press, its installed power and how many you plan to run.
- Add chillers, dryers, compressors, lighting and offices.
- Agree a realistic demand factor with your electrical engineer.
- Compare with the transformer size, with room for growth.
Ask the owner whether the transformer is dedicated, what voltage the unit receives and what an upgrade costs and how long it takes. See power supply in kVA and transformer upgrades. If you run 24 hours a day, also check the electricity tariff and peak hours in electricity costs for factories.
Floor and foundations
A mid-size press may weigh from a few tons to tens of tons, and large presses much more. The footprint is small so the point load is high. Add a mould on the platen, a raw material store and forklift traffic.
Collect weights from your machine supplier, and ask the owner for the slab rating and thickness. Large presses may need a local foundation. Ask if the lease allows breaking the slab and what you must restore at the end. Our guide to floor load capacity explains point loads.
Also check the floor surface. Oil and resin spills are a fact of life. A sealed floor makes cleaning easier and keeps dust down.
Cooling water
Presses and moulds need cooling. Most plants use a closed loop with chillers or cooling towers. This needs:
- Outdoor space or roof space for the equipment
- Power for pumps and fans
- Water make-up and a way to dispose of blow-down water
- Noise control for neighbours
Ask the owner where the cooling plant can go and whether it is allowed. In a shared park, neighbours may object to noise, mist or fan drift. Also ask about water supply pressure and the monthly cost. See water and wastewater costs.
Mould handling
The mould shop is part of the plant, even when moulds are made elsewhere. Moulds come in and out of the presses on a schedule. A mould of 500 kg to several tons needs a safe way to lift, move, store and clean it.
Choose the lifting method early:
- Overhead crane over the press bay. Check span, capacity and hook height against the largest mould and the press opening.
- Gantry crane or jib cranes per press line, if the building cannot take an overhead crane.
- Mould carts and forklifts for smaller moulds, with ramps and clear aisles.
If you need a crane, read factories with an overhead crane and clear height. Allow a mould store with racking close to the press bay, plus a small bench area for maintenance.
Heat, fumes and ventilation
Barrels, dryers and hot parts make halls warm. Add Vietnam’s climate and the work environment can become tough. A well-insulated roof, roof vents and fans make a large difference. See roof insulation and ventilation and cooling.
Some materials create fumes when heated. Ask your supplier about local exhaust, and check the building allows ducting through the roof or walls.
Looking for a factory now? Send my requirements
Layout and flow
A typical plant flows from resin store to dryers to presses to finishing, assembly and packing, with regrind and scrap kept apart. A clear-span hall, with a straight run for central material feeding, makes this easier. Think about:
- A covered resin store, protected from humidity, near the dock
- Space for silos or bulk bag unloading
- A regrind area with dust control
- A QC room with temperature control for measurement
- Packaging stock, which takes more room than many first-time tenants plan
Fire and insurance
Plastic resin, packaging and finished goods burn well and give off heavy smoke. The unit should have fire approval for the use, and sprinklers where required. Read fire safety approval and factory insurance for tenants.
Noise, vibration and neighbours
Presses, crushers, compressors and chillers make noise. Parks set limits at the boundary of each unit. Ask the management board for those limits and for any complaint history. Chiller fans and cooling towers often draw the most complaints because they run all night.
Vibration matters less for moulding than for machining, but heavy presses can still disturb neighbours. Check what is next door.
Raw material and finished goods storage
Resin needs a dry, covered and clean store. Many resins absorb moisture, and wet material causes rejects. Plan the store close to the dock and the dryers. Finished parts and cartons take more space than first-time tenants expect, since plastic parts are light and bulky. Ask the owner about covered yard space, canopies and a second store.
Water, waste and recycling
Cooling loops need top-up water and a way to deal with blow-down water. Scrap and regrind need a clean path. If you plan in-house recycling or compounding, say so in your brief, since some parks restrict those processes. Painting, printing and plating of plastic parts bring solvents and wastewater, which are handled differently. See the environmental permit.
Questions to ask on the first visit
- Which press sizes can the slab take, and where are the stronger zones?
- Where do the chillers and cooling tower go, and who approves the location?
- What are the park limits on noise and water discharge?
- Can the roof carry ducting and silos?
- How long will a power upgrade take if we add presses next year?
Spare capacity and growth
Presses are added one by one. Plan the first hall for the presses you buy now, and check where the next ones go. Ask whether the transformer, the cooling plant and the floor all have room for ten to twenty per cent more load without a rebuild. If not, put the upgrade into the lease with a date and a cost split, so growth does not stall on a dispute.
Get a shortlist
Send the press list, the heaviest mould and your cooling plan, and we will check units against them. Send your requirements and we reply within 24 business hours with up to 5 factories we have checked on site.
Frequently asked questions
How much power does an injection moulding plant need?
Add the connected load of every press, the chillers, dryers, compressors and the mould shop, then apply a demand factor with your engineer. Compare the result with the transformer size of the unit and ask how long an upgrade takes.
Do I need an overhead crane for moulds?
For large moulds, yes, or a safe alternative such as a mould trolley and a forklift route. Check crane beams, hook height and rated capacity against the heaviest mould you plan to run.
Where does the cooling water come from?
Most plants use a closed loop with chillers and cooling towers. They need outdoor space, power, a water top-up and rules for blow-down water. Ask the owner where the plant can go.
Is a plastics plant allowed in every industrial park?
Most parks accept it, but some limit certain processes such as recycling, compounding with solvents or painting. Check the park's allowed sector list and tell us the full process in your brief.
Looking for a factory now?
Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.
Send my requirements