What Do You Need to Store Chemicals Legally in a Leased Factory in Vietnam?
November 21, 2026
Storing chemicals in a leased factory is lawful when you meet three conditions: the substances are allowed in your quantities, the store is built and managed to the rules and the response plans are in place. The base law is the Law on Chemicals 2025 (Law 69/2025/QH15), in force from 1 January 2026. It replaced the Law on Chemicals 2007. In January 2026 the Government issued Decrees 24/2026/ND-CP, 25/2026/ND-CP and 26/2026/ND-CP to carry out the law, with effect from 17 January 2026.
This is general information, not legal advice. Chemical rules are new and being applied for the first time, and thresholds and deadlines sit in the decrees and circulars. Confirm your case with a chemical safety adviser and the park management board.
What the new framework includes
| Document | What it covers |
|---|---|
| Law 69/2025/QH15 | Chemical activities, storage, safety, accident prevention and response |
| Decree 24/2026/ND-CP | Lists of chemicals within the scope of the law |
| Decree 25/2026/ND-CP | Chemical industry development and chemical safety |
| Decree 26/2026/ND-CP | Management of chemical activities and hazardous chemicals in products |
| Circulars 01 and 02/2026/TT-BCT | Ministry of Industry and Trade guidance on the law and the decrees |
The English text of the law is on LuatVietnam. Decree numbers come from Vietnamese legal databases, so check them against the official gazette when you prepare your file.
What the law says about storage
Under the law’s storage article, organisations that store chemicals must:
- Meet the safety requirements for the type of chemical.
- Post warning information and signs at hazardous storage areas.
- Keep internal chemical safety rules.
- Hold equipment to respond to incidents.
For conditional and specially controlled chemicals, you must keep them in your own storehouse or use a licensed chemical storage service provider. Banned chemicals must be kept in a separate storehouse or isolated area, with a monitoring book. A provider of storage services needs a certificate of eligibility, and the rules on those certificates take effect from 1 July 2026.
So the question for a tenant is simple: which of your substances are on which list? Decree 24/2026/ND-CP carries the lists. Bring your chemical inventory with quantities and CAS numbers to your adviser.
Prevention and response plans
The law requires plans or measures to prevent and respond to chemical incidents.
- Above the threshold for listed chemicals: the plan must be approved before storage starts.
- Other hazardous chemicals: you still need prevention and response measures, issued before you store.
- Ongoing duty: carry out the plan, update it when your operation changes and keep the chemical database entry current.
- Equipment and people: keep response equipment and trained staff.
Plans or measures issued before the new law may continue to apply, according to the transition rules. Projects that have no plan or measures must have them in place before operating. Deadlines for some licences fall in 2026 and 2027, so ask your adviser which apply to you.
Fire safety adds its own rules
Chemical storage is also a fire topic. The national fire code is QCVN 06:2022/BXD with Amendment 1:2023, and the fire law is Law 55/2024/QH15. Together with your fire hazard class, they decide separation distances, fire resistance of walls, sprinklers and approvals. The fire approval of a ready-built unit was usually issued for warehouse or light production. A chemical store may need an update. See fire safety change of use, fire hazard classification and sprinkler systems.
What the store needs physically
We do not quote distances or volumes. Your adviser and the codes set them for your substances. These are the features to check in a unit.
| Feature | Why it matters | What to look for |
|---|---|---|
| Separate room or fenced yard store | Keeps chemicals away from workers and ignition sources | Space on the plan, a door to the outside |
| Compatible segregation | Acids, bases, oxidisers and flammables must not mix | Separate cabinets or bays with their own containment |
| Sealed floor and bunding | Contains leaks | Sloped slab, kerbs, no connection to storm drains |
| Ventilation | Removes vapours | Roof or wall openings, extraction fan |
| Fire protection | Sprinklers or other systems matched to the hazard | Existing system and its design basis |
| Ignition control | Reduces fire and explosion risk | Rated electrical fittings where needed, no hot work nearby |
| Signs and labels | Law and audit requirement | Warning signs, safety data sheets, chemical names |
| Emergency gear | Limits harm | Eyewash, shower, spill kit, extinguishers, fire alarm |
| Drainage control | Stops release to the park system | Closed sumps, no floor drains in the store |
Check the roof and the wall of the unit too. A hole for an extraction duct or a vent needs consent. See wind load and roof structure.
Looking for a factory now? Send my requirements
Wastewater and hazardous waste
Spills, washdown water and used chemicals are separate topics. Discharge limits and pre-treatment depend on the park plant. See wastewater discharge standards. Hazardous waste storage and licensed collection fall under the environmental file. See the environmental permit for a tenant. Plan these together with the chemical store, since a spill ends up in both.
What park rules and the lease add
- Park rules. Some parks ban certain chemicals or limit quantities. Ask the management board for the written list. See business line and park fit.
- Lease. Write consent for the store, for works such as bunding and for roof openings. State who holds the fire approval for the change.
- Insurance. Insurers ask what you store and where. See tenant insurance.
- Audits. Customer audits check storage, labelling and training. See what customer audits check in the building.
- Handback. The landlord may ask you to test the soil and floor at the end. Take a baseline at the start. See handover condition report.
Questions for the landlord and the park
- Does the park allow the chemicals and quantities I plan to store?
- Does the existing fire approval cover a chemical store?
- Is there a suitable room or yard area, with ventilation and containment?
- May I add bunding, sumps and extraction, and who approves the works?
- Does the landlord hold or share any chemical safety documents for the site?
- What is the park’s emergency plan and who do I call?
A chemical inventory your adviser can use
Most decisions start from one list. Build it before you shortlist a building.
| Column | Why it matters |
|---|---|
| Product name and supplier | To find the safety data sheet |
| CAS number | Unique identifier, used to match the lists in the decrees |
| Hazard class | Flammable, corrosive, toxic, oxidising or other |
| Maximum quantity on site | Decides thresholds and plan duties |
| Where used and where stored | Decides room size and layout |
| Compatible and incompatible materials | Decides segregation |
| Waste form | Decides the waste route |
With this list your adviser can say which substances fall on the conditional, special-control or accident-plan lists, and which need only basic safe storage.
Common mistakes
- Storing in the hall “for now”. Temporary storage becomes permanent and fails the first audit.
- Floor drains in the store. A spill then goes to the park system. Use closed sumps.
- Mixing incompatible materials. Acids next to bases or oxidisers next to solvents is the standard failure.
- No safety data sheets in the language of the workers. The sheet should be available where the chemical is used.
- Relying on the supplier’s storage. The duty follows the party that stores the chemical.
- Letting the quantity creep. A new product line can push you over a threshold. Review the inventory at each change.
Get a shortlist
Send us your chemical list with quantities and your process. We check store space, fire approval, drainage and park rules on site before a unit reaches your shortlist. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
Which law governs chemical storage in Vietnam?
The Law on Chemicals 2025 (Law 69/2025/QH15), in force from 1 January 2026. It replaced the Law on Chemicals 2007. Decrees 24, 25 and 26/2026/ND-CP give the detail.
Do all chemicals need a special permit to store?
No. The strictest rules apply to conditional and specially controlled chemicals and to chemicals on the lists with accident plan duties. Many ordinary process chemicals only need safe storage, labelling and response measures. Your adviser should check each substance against the lists.
Do I need a chemical accident prevention plan?
Where the quantity of a listed chemical passes the set threshold, the plan must be approved before storage begins. In other cases you still need prevention and response measures. Ask your adviser to check your quantities against the current thresholds.
Can the landlord store chemicals for me?
Only if the landlord holds the certificate for chemical storage services where the rules require one. Otherwise you store in your own storehouse inside your unit.