Are the Sprinklers in This Factory Enough for Your Stock?

November 21, 2026

A sprinkler system is designed for a specific hazard and a specific way of storing goods. If your stock is heavier, taller or more combustible than what the design assumed, the system may not control a fire, even when it passes a test. Before you lease, ask what the sprinklers were designed for and compare it with your racking and materials.

This guide is general information, not engineering advice. A licensed fire consultant must check your case.

What the standard says

The Vietnamese design standard is TCVN 7336:2021, titled Fire protection, Water, foam automatic fire-extinguishing systems, Design and installation requirements. It replaced TCVN 7336:2003. Listings of the standard say it was prepared with reference to a Russian standard, so its method differs from NFPA 13, which many global insurers and customers use. The standard has a scope with exclusions. Summaries list buildings designed under special regulations and some storage types, so confirm that your storage arrangement is covered.

Two questions come before the standard.

  • Are sprinklers required? The fire code, QCVN 06:2022/BXD, and the approved fire design decide that, based on the building’s use, size, height and hazard class. See our guide to QCVN 06.
  • Is the system accepted? The fire authority reviews the design and accepts the installed works under the fire law and its decree. A system that exists but has no acceptance record is a gap.

The standard then sets the design rules: hazard groups, design density, the area each group of heads covers, the water supply and the time it must last. The values sit in the standard’s tables, so we do not quote any. Your consultant will use them with your numbers.

What a sprinkler design assumes

Think of the design as a contract between the building and one type of use.

Design basis What it fixes
Hazard group of the occupancy How fast water must be spread over the fire
Storage arrangement and height How much fuel is stacked above the heads
Head type and spacing Where water lands, and how quickly the heads react
Water supply Flow, pressure, tank volume and the time it must last
Pump and pipework Whether the supply reaches the farthest head at design pressure

When any row changes, the whole contract needs a look.

When existing sprinklers are not enough

Change by the tenant Why the design may no longer fit
Taller racking or denser stacking More fuel above the heads and less clearance below them
Plastics, foam, rubber, aerosol or battery stock A faster, hotter fire than the design group assumed
New mezzanine, platform or partition Beams and floors block the spray and need their own heads
Large machines, ducts or lights under the heads Obstruction of the spray pattern
Higher roof or new ceiling Changes the head position
Process change to a higher hazard class The hazard group is wrong from the start
More buildings on the same water supply Tank or pump no longer serves all demand

Even if the heads are right, the supply can fall short. A tank sized for an earlier tenant, a pump that has not been tested or a park main with low pressure can each leave a good-looking system unable to deliver its design flow.

What to check on site

Walk the unit with the approved drawings and the last test records.

  1. Heads. Look at the type and the spacing. Check for paint on heads, damage, corrosion, missing heads and heads covered by new ducts or ceilings.
  2. Clearance. Confirm the gap between the top of the stock and the heads. Racking and boxes should not sit tight against them.
  3. Pipework and valves. Look for leaks, rust and closed valves. Control valves should be locked or supervised in the open position.
  4. Pump room. See the pump, the controller, the power supply and the diesel or backup arrangement. Ask for the last run test and any fault log.
  5. Tank. Check size, level and condition. Ask what volume the design needs.
  6. Alarm link. Confirm that a flow switch or an alarm valve sends a signal to the fire panel. See fire alarms and hydrants.
  7. Papers. Ask for the design drawings, the hydraulic calculation, the acceptance record, test reports and service contracts. Compare the occupancy and storage stated in the calculation with yours.

If the calculation is missing, ask the landlord to find it or to have a consultant reconstruct it. Without it, nobody can say what the system was built for.

Insurance and customer audits

Insurers check sprinklers. They ask about the water supply, the storage heights and the maintenance record. Some customers and insurers require an international basis for the design. If yours does, say so before you choose a unit, because a system designed to a different method may need rework even where it meets the Vietnamese standard. See our tenant insurance guide.

Looking for a factory now? Send my requirements

What to write into the lease

  • The landlord confirms that the sprinkler system has design approval and acceptance for the agreed storage and use, and provides the calculation.
  • The tenant states its maximum storage height and materials, and the landlord confirms in writing that the system covers them.
  • Who pays for changes needed by the tenant’s stock, who applies and the deadline.
  • Who services the system each year and who pays.
  • A right to leave and recover the deposit if the authority refuses the tenant’s use.

Our fire approval and change of use guide lists more clauses, and the clear height guide shows how racking height interacts with the roof. For the hazard classes behind all of this, see the hazard class guide.

A simple example

This is an example, not a case. A landlord’s papers show a sprinkler design for general storage with racking of moderate height. The tenant plans to store plastic parts in cartons on racks that are higher than the design assumed. The consultant reads the calculation and finds that the design density suits the earlier goods. For the tenant’s stock, the options are lower racking, in-rack sprinklers where the design allows them, a different layout with more aisle space or another unit. Each option has a cost, and the tenant now knows it before signing. Without the calculation, the same tenant would have found out after the first insurer visit.

Testing and maintenance

A sprinkler system needs regular service, and the lease should say who does it. Ask for the service contract and the last report. Look for records of pump run tests, valve checks, alarm tests and head inspections. Equipment and layout rules for portable means sit in TCVN 3890:2023. A system with old paperwork and no service history should be treated as unproven until a technician has tested it.

Gaps that turn up on checklists

  • No calculation on file. The landlord has drawings but not the hydraulic calculation, so nobody knows the design basis.
  • Shared tank or pump. The water supply serves other units or tenants, and the demand adds up in a fire.
  • Painted or damaged heads. Heads covered in paint, lime or dust, or knocked by forklifts.
  • Closed or unmonitored valves. A closed control valve turns the system off without any sign.
  • Obstruction. Ducts, cable trays, lights and racking under the heads block the spray.
  • Stock above the design. The previous tenant stored light goods, yours are heavier or stacked higher.

If a gap is found, the choices are to repair it, to change the stock or layout to fit the system, to upgrade the system with a new approval or to look at another unit. Ask the landlord to state in writing which gaps it will fix before handover.

Get a shortlist

Give us your racking height, your materials and your insurer’s requirements, and we will ask for the sprinkler design papers and note the gaps at each unit we visit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

Which standard covers sprinkler design in Vietnam?

TCVN 7336:2021 covers the design and installation of automatic water and foam fire-extinguishing systems. It replaced TCVN 7336:2003. Whether sprinklers are required at all is set by the fire code QCVN 06:2022/BXD and the approved fire design.

Can I add high racking to a unit that already has sprinklers?

Only after a check. Sprinklers are designed for a stated hazard and storage arrangement. Taller racking, denser stock or plastics can mean the design no longer fits, and the change may need a new fire design review.

Do global insurers accept Vietnamese sprinkler design?

Some insurers and customers ask for a different basis, such as NFPA 13 or an insurer's own rules. Ask your insurer early and compare their requirement with what the building has.

Who pays to upgrade sprinklers for a tenant's stock?

It depends on the lease. When the need comes from the tenant's storage, the tenant usually pays and applies. Agree this in writing before you sign, with a deadline and a way out if approval is refused.