What Wind and Roof Load Standards Mean When You Lease a Factory
November 21, 2026
The national standard for loads on buildings is TCVN 2737:2023. It sets how designers account for dead load, live load, wind and other actions on a structure, and it replaced the older TCVN 2737:1995. For wind, it relies on base wind pressure data from QCVN 02:2022/BXD, the national regulation on natural and climatic data for construction. Steel structures, which means most ready-built factories, are designed under the steel design standard TCVN 5575. Its current edition is TCVN 5575:2024, which replaced TCVN 5575:2012. A unit built a few years ago was probably designed to the 2012 edition.
You will not run these calculations. You do need to know what they imply for a leased roof, because most roof problems appear when a tenant adds equipment. A fan, a duct or a row of solar panels is a new load that the original designer never saw. The text of TCVN 2737:2023 is listed on Thu Vien Phap Luat. Always have your engineer confirm which edition applies to your project.
What the loads are
A roof carries more than rain. The designer adds several kinds of load together.
| Load | What it is | Why a tenant cares |
|---|---|---|
| Dead load | Weight of sheets, purlins, frames and fixed equipment | Your add-ons become dead load |
| Live load | Temporary load, such as maintenance workers on the roof | Roof sheets are often not walkable |
| Wind load | Pressure and suction from wind on the roof and walls | Uplift can lift light roofs and pull out fixings |
| Special actions | Earthquake, temperature, impact and similar | Handled in separate standards |
Earthquake loads are set in a separate standard and not in TCVN 2737:2023. Tell your engineer if your equipment is heavy or sensitive to vibration, and ask for the whole design basis.
Why wind matters more than people expect
Light steel factories have large roof areas, low self-weight and big openings when doors are open. Wind can push down on one part of the roof and pull up on another. Uplift is often the critical case for the sheeting and its fixings, not the weight of the frame. In a storm, a poorly fixed roof sheet is the first thing to go, and a loose sheet can damage neighbouring buildings.
The design wind pressure depends on the location, the height, the shape and the terrain around the building. The map in QCVN 02:2022/BXD sets the base value for the district. We do not quote values here. Ask the landlord for the design basis and let your engineer read the figures for your address.
Older buildings and the 2023 edition
A unit built before 2023 was designed to the older edition of the standard. The 2023 edition changed the wind calculation method and updated the base pressures. Research papers comparing the two editions describe differences in the results. That does not make older buildings unsafe. It means two things for you:
- Do not assume. Ask for the as-built drawings and the design basis: which standard, which wind pressure, which load per square metre for the roof.
- Check before adding load. If you plan to add anything heavy or large, have an engineer compare the new load with what the roof was designed for, using current rules.
What to inspect on a visit
Walk the building inside and outside. Look for:
- Roof sheeting: rust, holes, dents, loose or missing screws, damaged ridge caps.
- Purlins and bracing: corrosion, sagging, bent members, missing bracing.
- Frame connections: rust at bolts and base plates, cracked welds, gaps at anchor bolts.
- Gutters and downpipes: blocked or overflowing, because ponding water adds load.
- Past repairs: patches, extra sheets, welded repairs that suggest earlier storm damage.
- Doors: large roller doors and dock doors that act as openings in wind.
If anything looks wrong, ask the landlord for a written repair plan before you sign. Our guide on roof insulation and heat has more checks on the roof sheets and leaks.
Adding solar panels, fans or plant to the roof
This is the most common roof change by a tenant. Treat it as a small design project.
- Get landlord consent in writing. Roof access, roof penetrations and the right to install should be in the lease or a signed side letter.
- Ask a structural engineer to check the roof. The check should cover dead load, wind uplift on the panels and the effect on purlins and fixings.
- Plan the fire and electrical side. Panels need a safe cable route, isolation switches and bonding. See our post on lightning protection and electrical safety.
- Check the energy rules. Rooftop solar for self-consumption is governed in Vietnam by Decree 58/2025/ND-CP, which has been amended in 2026, including the share of surplus power that can be sold to the grid. The rules have moved twice in two years, so ask a power adviser for the current version before you size the system.
- Agree the end of lease. Who removes the panels, who repairs the penetrations and who is liable for leaks. See reinstatement at lease end.
If the landlord owns the roof and sells you power, the model is different. The lease should state who owns the system, who insures it and what happens if the building is sold. See what happens if the landlord sells.
Looking for a factory now? Send my requirements
Roof works also need a permit path
Adding structural elements, mezzanines or large rooftop plant can trigger a construction permit or notice requirement, depending on the scale and the local rule. Our guide on fit-out works that need a permit lists what to ask the park board before you order.
Rainy season timing
Do not leave roof inspection until after you move in. Visit during or just after a heavy rain if you can. Stains on the floor, wet insulation and dripping at the wall-roof joint show where the building leaks. The same visit tells you how the drains cope. See flood risk for floor level and drainage.
Questions for the landlord
- Which standard and which wind pressure was the building designed to?
- Can I see the structural drawings and the roof design load?
- Has the roof had storm damage or repairs? Who did them?
- May I install rooftop equipment, and what is the maximum load?
- Who inspects and repairs the roof during the lease?
- Who pays for an engineer’s check when I add load?
What the engineer’s note should cover
If you pay for a structural check before adding equipment, ask for a short written note, not a verbal opinion. A useful note covers:
- the documents reviewed: drawings, design basis, site photos
- the loads assumed for the new equipment, including wind on it
- the members checked, such as sheets, purlins, rafters and fixings
- the result for each member and any reinforcement needed
- the standard and edition used for the check
- conditions: where the equipment may go, how it must be fixed and who inspects the work
Give a copy to the landlord. It protects both sides. If a leak or damage appears later, you can show what was checked and what was built.
Common mistakes
- Adding equipment on a verbal “yes”. Get consent in writing, with the weight and position stated.
- Ignoring fixings. The sheet may carry the weight, but the screws pull out in suction. Fixing details matter as much as the member size.
- Putting loads between purlins. Heavy items should sit over supports, not mid-span on a sheet.
- Walking on roof sheets. Many roofs are not designed for foot traffic. Use walkways and ask where safe paths are.
- Forgetting the access route. A rooftop unit needs a safe way to service it, with edge protection.
- Skipping the after-storm inspection. After a storm, check fixings and flashing around anything you added.
Get a shortlist
Tell us what you plan to put on the roof, such as solar, fans or ducts. We check the roof condition, the drawings and the landlord’s consent on site before a unit reaches your shortlist. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
Which standard sets wind load for buildings in Vietnam?
TCVN 2737:2023 covers loads and actions on buildings, including wind. It replaced TCVN 2737:1995, and it uses base wind pressure data from QCVN 02:2022/BXD.
Can I put solar panels on a leased factory roof?
Only with the landlord's written consent and a structural check. Panels add weight and increase wind uplift on the roof sheets and purlins, so an engineer must confirm that the roof can take them.
Was my building designed to the current standard?
If it was built before the 2023 edition, it was probably designed to the older one. That does not mean it is unsafe, but it means you should ask for the design basis and have an engineer review any added load.
Who pays for a structural check of the roof?
Usually the tenant when the tenant adds load, and the landlord when the check is about the condition of the base building. Agree this in the lease before you order equipment.