Guides / Standards
What Wastewater Can Your Factory Send to the Park Treatment Plant?
November 21, 2026
The national standard for industrial wastewater in Vietnam is QCVN 40:2025/BTNMT, and it sets what may leave a plant into rivers and canals. A tenant in an industrial park usually sends wastewater to the park’s central plant instead. In that case the limit you must meet is normally the park’s own connection limit. So you need two numbers before you sign: the park’s limit and the quality of your own wastewater.
This guide is general information, not legal or engineering advice. An environmental adviser and the park management confirm the rules for your process.
The national standard
QCVN 40:2025/BTNMT is the national technical regulation on industrial wastewater. The Ministry of Natural Resources and Environment issued it with Circular 06/2025/TT-BTNMT on 28 February 2025. It took effect on 1 September 2025. It replaced QCVN 40:2011/BTNMT and also took over from several sector standards, such as those for steel, textile dyeing, rubber, seafood, pulp and paper.
You can see the text on a Vietnamese legal database.
What it does:
- It sets limit values for pollutant parameters in industrial wastewater discharged to receiving waters.
- Basic parameters are the organic load measured as COD or TOC and BOD5, and suspended solids.
- A second table sets extra parameters by type of business, such as acidity, temperature, nutrients, heavy metals and organic compounds. An appendix lists the business types.
- The limit depends on the receiving water. Columns A, B and C match the use of the receiving source, and where the discharge zone is not yet set, column B applies.
What it excludes: domestic and urban wastewater, livestock wastewater and produced water from offshore oil and gas. Domestic wastewater has its own regulation. Wastewater from a canteen or toilets is handled with simple traps and the park’s rules, and mixed flows are treated as industrial.
Transition
| Case | Rule we found |
|---|---|
| Facility already operating, or with an approved environmental impact assessment or a complete file lodged before 1 September 2025 | May keep applying earlier standards until 31 December 2031 |
| Same facilities from 1 January 2032 | Must meet QCVN 40:2025/BTNMT |
| New or expanded project filing after 1 September 2025 | Applies the new standard from the start |
| Existing facilities that want to switch early | Encouraged to apply it from 1 September 2025 |
As a tenant with a new project in a leased unit, expect the new standard to shape the design of any treatment you build. Check with your adviser how your case is classed.
The park connection limit
Industrial parks must have a central wastewater treatment plant under the industrial parks decree, Decree 35/2022/ND-CP. The plant takes wastewater from tenants and treats it to the national standard before it discharges. To protect the plant, the park sets inlet limits for each tenant. According to summaries of QCVN 40:2025, the standard leaves the requirement for wastewater sent to a shared sewer to the investor or operator of the park infrastructure. We could not confirm the clause in the full text, so ask your adviser to check it.
In practice that means:
- The park’s limits can be stricter than the national ones, or differ in parameters. Typical ones cover acidity, suspended solids, oil, heavy metals and organic load.
- The limits sit in the park’s wastewater service contract or regulations. Ask for them in writing.
- The park samples at your outlet, charges for tests and may apply surcharges or stop the connection for failures.
Our water and wastewater cost guide shows how the fees are charged, and the infrastructure check lists what to ask about the plant itself.
What the building must have
Wastewater control is half building and half process.
| Item | What to check in the unit |
|---|---|
| Separate drains | Domestic and process lines kept apart, so each can be treated or sampled |
| Floor drains and falls | Process areas drain to a collection point, not to the yard |
| Space for pre-treatment | A plot area for tanks and equipment, and permission to build |
| Sampling point and meter | An accessible outlet where the park can sample and a flow meter can sit |
| Bunding | Spill containment around chemical stores and tanks |
| Rainwater | Clean roof and yard water separated from process lines |
| Park connection | Position and size of the manhole and who pays to connect |
Looking for a factory now? Send my requirements
Pre-treatment by process
The examples show the usual direction. A consultant sizes the real system.
| Source | Typical concern | Typical step |
|---|---|---|
| Canteen | Fat and oil | Grease trap |
| Machining and washing | Oil, coolant, suspended solids | Oil separator, settling, filtration |
| Painting and coating | Solvents, metals, organic load | Separate collection, chemical treatment |
| Plating and finishing | Acidity, heavy metals | Neutralisation and precipitation |
| Dyeing and textile | Colour, organic load | Chemical and biological treatment |
| Food | Organic load, fat | Screening, fat removal, biological treatment |
Hazardous liquids stay out of the sewer. Spent solvents, used oil and concentrated coolants go to a licensed hazardous waste collector, with registered storage in your unit. See our guide to chemical storage.
Paperwork that goes with it
Wastewater sits inside your environmental file. Depending on your category, you need a permit or a registration, and for some projects an impact assessment. Our guides to the environmental permit and the impact assessment explain when each starts. Add the park’s written acceptance of your discharge to the file.
Budget
Pre-treatment is a fit-out cost, not a monthly fee. It needs design, equipment, a licensed operator and sampling costs. Put it in the fit-out budget before you compare rents. A cheap unit with no room for treatment can cost more than a dearer unit that has it.
Questions for the park and the landlord
- What are the inlet limits for my process, and are they written?
- What is the plant capacity, and is there room for my volume?
- How often does the park sample and what happens after a failure?
- Is there a meter on my outlet, and who reads it?
- Is there space on the plot for tanks, and may I build them?
- Does the lease let me connect and remove my equipment at the end?
A short example
This is an example, not a case. A tenant plans a machining line with parts washing and a canteen for 300 people. The process sheet shows oily wash water, coolant bleed-off and kitchen waste. The adviser proposes a grease trap for the canteen, an oil separator and settling tank for the wash line and a collection tank for spent coolant, which goes to a licensed collector and not to the sewer. The tenant asks the park for its inlet limits and for permission to place the tanks beside the building. The park confirms the limits in writing and asks for a drawing of the sampling point. That route took weeks, and it happened before signing.
Records to keep
Keep the park’s inlet limits, your test results, the park’s invoices for wastewater, the maintenance log for the treatment units and the hazardous waste manifests. Park audits, environmental inspections and customer audits all ask for them.
Get a shortlist
Tell us your process and your water use, and we will ask each park for its inlet limits and note the drains and space at every unit we visit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
What is the current national industrial wastewater standard?
QCVN 40:2025/BTNMT, issued by Circular 06/2025/TT-BTNMT of 28 February 2025 and effective from 1 September 2025. It replaced QCVN 40:2011/BTNMT and several sector standards. It sets limits for wastewater discharged to receiving waters.
Do I have to meet QCVN 40 if I send wastewater to the park plant?
The park plant must meet the national standard when it discharges. Your own limit is normally the park's connection limit, written in the park's wastewater contract. Ask the park for it in writing before you sign.
Can a factory discharge process water into the park sewer without checks?
No. Parks test inlets and can set surcharges or refuse discharge that exceeds their limits. Hazardous liquids such as spent solvents and coolants do not go to the sewer at all. They go to a licensed waste collector.
What pre-treatment does a tenant usually need?
It depends on the process. Canteens need grease traps. Machining, washing, painting, plating, dyeing and food lines may need oil separation, neutralisation, settling or biological treatment. An environmental consultant sizes it from your process data.
Looking for a factory now?
Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.
Send my requirements