Guides / Standards
Which Factory Equipment in Vietnam Needs a Safety Inspection Before Use?
November 21, 2026
Some machines are dangerous enough that Vietnamese law requires an independent safety inspection before use and at regular intervals. The Law on Occupational Safety and Hygiene 2015 (Law 84/2015/QH13) sets the principle. Decree 44/2016/ND-CP sets the inspection system. Circular 36/2019/TT-BLDTBXH lists the machinery and equipment that carry strict safety requirements. A tenant meets these rules at three moments: when a landlord’s crane or boiler comes with the unit, when the tenant brings its own equipment and when an audit asks for the certificates.
This is general information, not legal advice. The list and the inspection periods are set in the circulars and may change. A revised occupational safety law was reported in draft in mid-2026, so check the current text before you rely on any detail here.
What counts as strict-requirement equipment
The list in Circular 36/2019/TT-BLDTBXH covers machinery, equipment and substances with a high risk of accidents. For a factory tenant the groups that come up most often are:
| Group | Examples in a factory | Where it appears in a unit |
|---|---|---|
| Boilers | Steam boilers, oil heating boilers | Utility room, yard |
| Pressure vessels | Air receivers, gas cylinders, autoclaves | Compressor room, process area |
| Lifting equipment | Overhead cranes, gantry cranes, hoists, forklifts of 1,000 kg or more | Crane beams in the hall, the forklift fleet |
| Lifts and escalators | Passenger and goods lifts | Multi-storey units |
| Gas supply systems | Compressed, liquefied and dissolved gas systems, gas cylinders | Gas store, piping |
The list is long and uses thresholds. For example, the circular covers boilers and pressure vessels above a working pressure of 0.7 bar. Give your equipment list to your safety adviser and ask them to check each item against the current circular, including the thresholds for your sizes. The English text of the circular is on LuatVietnam.
How the inspection works
Decree 44/2016/ND-CP sets three kinds of technical safety inspection:
- First inspection before the equipment is used for the first time, or after installation or major repair.
- Periodic inspection at intervals set by the rules for each type of equipment.
- Irregular inspection after an incident or on request.
The inspection is carried out by a technical safety inspection organisation that holds a licence for that activity. The result is a certificate or a report. The user keeps it, and the equipment usually carries a mark or sticker showing the next date. Many equipment types also have to be registered or declared with the local labour authority before use. Ask your adviser how this works for your province.
People matter as well. Those who do work with strict safety requirements, such as operating cranes or boilers, usually need safety training and a certificate under the occupational safety rules. A good crane with an untrained operator fails an audit.
What this means for a leased factory
Equipment that comes with the unit
Overhead cranes are the typical case. A landlord may have installed a crane years ago and shown it as a feature. Before you rely on it:
- Ask for the inspection certificate and the date of the next inspection.
- Ask for the rated capacity plate and the load test record.
- Ask who inspected it and whether that body was licensed.
- Look at rail, hook, wire rope and the pendant control.
- Ask whether the crane beams and structure can carry the rated load.
If there is no certificate, do not use the crane. Ask the landlord to have it inspected and repaired before handover, or to pay for it. See our guide on factories with overhead cranes and floor load capacity.
Equipment you bring
If you install a boiler, a large compressor, a lift or a new crane, plan the first inspection before production starts. It needs access, documents from the maker and sometimes works such as a foundation or a ventilated room. Add it to the fit-out schedule. Our guide on compressed air and utilities covers receivers and piping.
Lifts in multi-storey units
Passenger and goods lifts sit on the list. In a multi-storey building the lift belongs to the landlord, and the inspection duty falls on whoever operates it. Ask who holds the maintenance contract and who gets the certificate. See multi-storey factories.
Who is responsible
| Item | Typical responsibility |
|---|---|
| Landlord’s crane, lift or boiler | Landlord provides valid certificates at handover. Lease says who maintains and re-inspects |
| Tenant’s own equipment | Tenant arranges first and periodic inspection |
| Operators | Employer trains and certifies them |
| Records | Whoever uses the equipment keeps them on site |
The lease should say who arranges and pays each inspection during the term. Without it, a crane can sit past its inspection date because each side assumes the other has it in hand. See who pays for repairs.
Looking for a factory now? Send my requirements
Where audits and insurers look
Customer audits and insurers look for inspection certificates and trained operators, and they often count a missing one as a serious finding. Keep a register of strict-requirement equipment with the type, location, certificate number, last date and next date. See what customer audits check in a factory building and tenant insurance.
Questions for the landlord
- Which equipment in the unit is on the strict-requirement list?
- Can I see the current inspection certificates and the next dates?
- Who maintains the crane or lift, and under what contract?
- Who arranges and pays periodic inspections during the lease?
- Are there past incidents or repair records for this equipment?
- May I install my own boiler, pressure vessel or crane, and where?
A simple equipment register
A register keeps the duties visible. Make one sheet per site with these columns:
| Column | Example content |
|---|---|
| Equipment | Overhead crane, air receiver, boiler, forklift, lift |
| Location | Bay, room or yard position |
| Owner and user | Landlord or tenant |
| Rated capacity or pressure | From the maker’s plate |
| Inspection certificate number | From the last report |
| Inspection body | Name of the licensed organisation |
| Last inspection date | Day, month, year |
| Next inspection date | From the rules for that equipment |
| Operators trained | Names and certificate dates |
Review it every month. Sort by next inspection date. Anything inside 60 days of expiry gets an inspection booked. This is a management habit, not a legal figure, so change the lead time to suit your supplier schedule.
What an inspector will ask you for
When an inspector or an auditor arrives, expect to show:
- The maker’s documents: manual, test certificate and drawings.
- The installation record and the first inspection certificate.
- Periodic inspection reports, with all faults and how they were cleared.
- Maintenance logs and repair records.
- Operator training and certificates.
- Rules for safe use posted at the equipment.
If the equipment came from the landlord or a previous tenant, some of these may be missing. Ask early. A re-inspection and a new test are often cheaper than a stoppage.
Common mistakes
- Using a landlord’s crane because “it was always used”.
- Moving a boiler or a pressure vessel without telling the inspector.
- Letting an inspection lapse because the contract was unclear.
- Hiring operators without the training that the rules require.
- Storing gas cylinders in the hall with no cage or ventilation.
- Treating forklifts as vehicles only, when the larger ones are on the equipment list.
Get a shortlist
Tell us which equipment you plan to use, such as an overhead crane, a boiler or a lift. We check the equipment, the records and the structure on site before a unit reaches your shortlist. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
Which law sets safety inspection for factory equipment in Vietnam?
The Law on Occupational Safety and Hygiene 2015 (Law 84/2015/QH13), with Decree 44/2016/ND-CP on technical safety inspection. Circular 36/2019/TT-BLDTBXH lists the equipment with strict safety requirements. A revised law has been in draft in 2026, so check the current text.
Which equipment is on the strict-requirement list?
It includes boilers and pressure vessels, lifting equipment such as overhead cranes, lifts and gas supply systems, among other items. Read the current list for your own machines.
Who carries out the inspection?
A licensed technical safety inspection organisation. The equipment owner or user must have it done at the times the rules require, such as before first use and at set intervals.
If the landlord installed an overhead crane, who is responsible for it?
The party that uses and controls it must make sure it has valid inspection records. Ask the landlord for the certificate before you use it, and write the duty to inspect into the lease.
Looking for a factory now?
Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.
Send my requirements