Are Multi-Storey Factories Worth It for Your Process?
November 21, 2026
A multi-storey factory suits light, low-weight processes with small parts and a lot of people, such as electronics assembly, packing, garment finishing and light consumer goods. It does not suit heavy machines, presses, tall equipment or processes that move large volumes of bulky goods all day. In southern Vietnam, most industrial supply is single-storey, so multi-storey buildings are a niche, found where land is scarce or where a developer has built a product for logistics and light industry.
What a multi-storey factory is
There are three common forms:
- Cargo-lift buildings. Two to several floors, with goods lifts and sometimes a ground-floor dock. Each floor is a production or storage area.
- Ramp-up buildings. A ramp lets trucks drive to an upper floor, with docks at ground and upper level. More common for warehouses and light production.
- Flatted factories. Many small units on several floors with shared lifts, stairs and services, aimed at small and mid-size tenants.
The mix differs by developer. Ask which form the unit is and how goods reach each floor.
Who it suits
| Process | Suitable? | Why |
|---|---|---|
| Electronics assembly and testing | Yes | Light equipment, many workers, low weight |
| Garment finishing and packing | Yes | Light loads, flexible layout |
| Cosmetics, medical packing, small consumer goods | Yes | Light and clean, low truck traffic |
| E-commerce fulfilment | Sometimes | Needs ramps or large lifts, and floor flatness |
| Precision assembly | Sometimes | Needs low vibration, check neighbours |
| Metal machining and presses | No | Heavy floor loads and vibration |
| Plastics injection with heavy moulds | Rarely | Mould weights and cooling water |
| Wet processes and heavy wastewater | Rarely | Floor drainage and waste handling |
Floor load by floor
The ground floor of a modern single-storey unit is commonly rated at 2 to 3 tons per m². Upper floors in multi-storey buildings are usually rated lower. Public listings commonly show about 1 ton per m² on upper floors, and lower in older flatted blocks. These are examples from listings, not guarantees.
Ask for:
- The design load of each floor in tons per m².
- The point load limits, for racking and machine feet.
- The structural drawing or a certificate from the owner’s engineer.
- The vibration behaviour of the floor if you run sensitive equipment.
Heavy machines and high racking should stay on the ground floor. Our floor load guide explains how to read the numbers.
Lifts, ramps and goods flow
The cost of moving goods up and down often matters more than the rent difference between floors.
- Lift size and capacity. Can a pallet, a machine or a trolley fit? What is the rated load and the door size?
- Lift queue. If many tenants share the lift, peak hours become a bottleneck. Ask how many lifts serve your floor.
- Ramp for trucks. Check ramp width, slope, turning space at the top and the truck sizes allowed. A 40 ft container truck may not fit on all ramps.
- Loading at upper levels. Count docks per floor and check dock levellers.
- Fire lifts and stairs. Exit routes and fire stairs limit how many people and what fire load each floor can have.
Draw your flow from receiving to shipping on the floor plan. If goods cross floors more than once, a single-storey unit is likely cheaper in the end.
Fire safety
Fire rules are stricter for taller buildings with more floors and people, and each floor has its own limits on use, fire load, exits and sprinklers. A process that fits a single-storey warehouse may not fit an upper floor. Ask to see the fire prevention approval and acceptance, check the use it covers and see whether your racking or process needs a new approval. Read fire safety approval before you decide.
Power, services and height
- Power. Check the transformer and how kVA is shared between floors and tenants. See reading the power supply.
- Clear height. Upper floors often have lower clear height, around 5 m in some listings, versus 8 to 10 m for new single-storey units. See clear height.
- Roof and heat. The top floor takes the roof heat. Ask about insulation and ventilation.
- Wastewater and drains. Check floor drains and where wastewater flows on upper floors.
Cost view
Do not compare rent per m² alone. Build a monthly figure that includes:
- Rent for the floor area you use.
- Management fee and shared service fees.
- The cost of extra handling labour and lift time.
- Any limits on output that follow from lower floor loads or height.
- The cost of a second location if growth needs heavy machines later.
The cost guide shows how to price a unit on one basis.
Looking for a factory now? Send my requirements
When a multi-storey unit is a good start
- You are small, light and quiet, and want a modest rent.
- Your customer visits or audits are easy in a more urban location.
- You can keep heavy items on the ground floor.
- You expect to move to a larger single-storey unit later, and your lease allows it.
Questions for the landlord
- How many floors can be leased separately and which are available?
- What is the design load and clear height for each floor?
- How many lifts serve the floor, what is their size and rated load, and who controls the schedule?
- Is there a truck ramp, and what are its width, slope and turning space?
- What fire approval covers each floor and for which use?
- How is power split between floors and tenants?
- Are there limits on hours, noise or vibration?
- What shared fees apply, such as lift maintenance and security?
- Can you take more floors later?
Alternatives to compare
If a multi-storey unit does not fit, consider:
- A small single-storey unit if your process is light but needs a ground-floor dock. See small factories.
- A standalone building if you need privacy, power or truck access. See standalone vs shared.
- A split operation, with light assembly on an upper floor and heavy work at another site.
A short test is useful: draw one day of goods movement on the floor plan. If the drawing shows many trips across floors, choose another format.
Noise, vibration and neighbours
On upper floors, vibration travels through the structure. A sensitive process such as optical assembly or precision measurement can be disturbed by a press or a forklift on another floor. Noise also moves through floors and shafts. Ask what the other floors do, and if possible visit while they are running.
Also think about people. A building with many workers on many floors needs enough stairs, toilets, break areas and parking. Count them against your headcount, since a unit that looks right for equipment can be too tight for the number of people you plan to employ. See worker facilities for the basics.
Handover and fit-out on upper floors
Fit-out on an upper floor takes more planning. Materials travel by lift or ramp, so deliveries must be scheduled, and heavy items may need a crane lift from outside. Ask the landlord what rules apply to fit-out hours and delivery times, and whether there is a deposit for damage to lifts and common areas. Take photos and meter readings at handover, as described in the handover report guide.
A note on supply
Because supply is limited, a multi-storey unit may not be available in the park you prefer. Be open on location within the same region, and tell us the weights, the headcount and the goods flow so we can tell early whether a multi-storey format is realistic or whether a small single-storey unit is the better match.
Get a shortlist
Multi-storey supply is limited, so tell us your process early. Send your requirements with your weights, heights and goods flow. We reply within 24 business hours, check units on site and send a shortlist of up to 5. There is no fee for tenants.
Frequently asked questions
What is a multi-storey factory?
A factory building with two or more production floors, reached by cargo lifts, internal ramps or ramps for trucks. Developers build them where land is costly or scarce, mainly for light industry and logistics.
What floor load do upper floors have?
Listings commonly show ground floors at about 2 to 3 tons per m² and upper floors at about 1 ton per m² or less. Always ask for the design load of each floor and the drawing, since it decides which machines can go up.
Is a multi-storey factory more expensive?
Rent per m² may be lower on upper floors than on the ground floor, but upper floors add handling time and depend on lift capacity. Compare the whole cost of moving goods, not only the rent.
Are multi-storey factories common in southern Vietnam?
They are much less common than single-storey units. They appear mainly near Ho Chi Minh City where land is expensive, and in newer developer products. Supply is limited, so ask early.
Looking for a factory now?
Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.