Which Air Emission Rules Apply to a Factory You Lease in Vietnam?

November 21, 2026

Air emissions from Vietnamese factories are now governed by QCVN 19:2024/BTNMT, the national technical regulation on industrial emissions. It was issued with Circular 45/2024/TT-BTNMT and took effect on 1 July 2025. It merged several older regulations, including QCVN 19:2009 (dust and inorganic substances) and QCVN 20:2009 (organic substances), into one document. If your process makes dust, fumes, solvent vapour or combustion gases, this is the standard your exhaust is measured against.

For a tenant, the standard matters twice. It decides what treatment equipment your process needs. It also decides what the building must allow: roof openings, ducts, yard space and sampling points. This guide covers both. It is general information, not legal advice. Confirm the current text with a licensed environmental adviser.

What the standard covers

QCVN 19:2024/BTNMT sets permissible limits for pollutants in industrial emissions released to ambient air. It does not cover vehicle exhaust. It has separate tables for gaseous pollutants and for particles, and the limits are written as concentrations in the exhaust gas.

Two points shape how you read it:

  • Zones. The limits are given in columns for different protection zones. One column is for strictly protected areas, one is for emission-restricted areas and one is for everything else. Where local zoning has not yet been set, the regulation says the middle column applies. Your adviser should tell you which column fits your address.
  • Sources. The tables cover general industrial sources and some specific sectors that earlier regulations handled one by one. A paint booth, a welding shop, a boiler and a plastics line all fall under the same document, with different pollutants.

The standard sits under the Law on Environmental Protection 2020. Your emission duties usually appear in your environmental permit or registration. See our guide to the environmental permit for a factory tenant for how that file works.

When it applies to you

The circular has a transition rule, so the date of your project matters.

Situation Which rule applies
New project, file submitted after 1 July 2025 QCVN 19:2024/BTNMT from the start
Facility already operating, or file approved or complete before 1 July 2025 May keep earlier rules until the end of 2031
Same facility after 1 January 2032 QCVN 19:2024/BTNMT, unless the provincial People’s Committee sets an earlier date

A tenant moving into a ready-built factory with a new process counts as a new project in most cases. Do not assume that the previous tenant’s grandfathered status passes to you. Ask your adviser before you rely on it. The text of the circular is available in English on LuatVietnam.

What the building must allow

Emission control is equipment, and equipment needs a place. Before you sign, walk the unit with your process engineer and check each item below.

Process Typical exhaust What the building must allow
Spray painting or coating Solvent vapour and paint mist Booth footprint, filter and carbon unit space, a stack through the roof
Welding and cutting Fume and fine dust Local extraction, a filter unit outside or on the roof, duct routes
Woodworking and sanding Wood dust Dust collector, silo or bag room, fire separation from the main hall
Plastics and rubber Fumes and odour Extraction hoods, a scrubber or filter, space for cooling equipment
Boilers and ovens Combustion gases Stack with a sampling point, fuel storage, safe distance from walls
Electronics soldering Light fume Local extraction and a filter, usually modest ducting

Roof, wall and yard

Stacks and ducts mean holes in the roof or the wall. Each hole is a leak risk and a structural change. Ask whether the landlord allows penetrations, who seals them and who repairs the roof if they leak. Large filter units and fans also add weight to the roof or need a slab in the yard. See our guide on wind load and roof structure before you hang equipment on a roof.

Sampling points

Measurement of your exhaust needs a stack with a safe place to take samples. That means a platform, a ladder and access that meets safety rules. Plan these when you design the stack, not after the first inspector arrives.

Neighbours and the park

An industrial park has rules on odour, dust and noise at the boundary. Your emission may meet the national limit and still draw a complaint from the unit next door. Ask the park management board what its rules say and who handles complaints. Our post on bad neighbours in an industrial park covers the other direction: what to check about the units around you.

Monitoring and records

The permit or registration usually sets monitoring duties: which points, which pollutants, how often and who reports. Larger sources can be required to run automatic continuous monitoring. Smaller ones sample periodically through a licensed laboratory. The category depends on your size and process, so ask your adviser rather than guessing.

Keep the records in one folder: stack drawings, filter maintenance logs, laboratory reports and the permit. A landlord, a park inspector or a customer auditor may ask for them. See what customer audits check in a factory building.

Looking for a factory now? Send my requirements

Emissions outside versus air quality inside

This standard covers what leaves the stack. Air quality for workers inside the hall is a different subject with its own exposure limits and ventilation duties. Our guide on workplace chemical exposure explains that side. A good extraction design usually helps both, but the two are checked separately.

Questions for the landlord and the park

  • Does the lease allow roof and wall penetrations for ducts and stacks?
  • Who repairs the roof if a penetration leaks?
  • Is there yard or roof space for filter units, fans and a stack?
  • Has the unit ever held an environmental permit, and for which activity?
  • Does the park limit odour, dust or smoke at the boundary?
  • Can the landlord sign the site papers my permit file needs, and how fast?
  • What must I remove, and what must I repair, when the lease ends? See reinstatement at lease end.

What to prepare before the site visit

Write down every process step that makes dust, fume, vapour or heat. Add the expected air volume if your engineer has it. Ask your adviser which environmental category your project is likely to fall into. Then bring those notes to the visit so the building can be checked against the real equipment, not a general idea of “a factory”.

Common mistakes

  1. Choosing the unit before the process review. A unit with a low roof and no yard cannot take a large filter unit. Settle the emission equipment first, then look for space.
  2. Reading a number from an old table. Pre-2025 limits for dust and organic substances sat in separate documents. A supplier quoting them from memory may be using a replaced text.
  3. Treating the park as the permit holder. The park’s approvals cover the park. Your stack, your filter and your monitoring are your duty.
  4. Forgetting maintenance. Filters clog, carbon saturates and fans wear out. Plan spare parts, a maintenance log and who signs off each month.
  5. Leaving the landlord out. A roof penetration without written consent can become a dispute at handback, even when the work was sound.
  6. Underestimating timing. Duct design, equipment delivery, trial runs and the first measurements all take time. Do not plan full production for the day the lease starts.

A simple preparation list

Before you ask a landlord for a price, put these items on one page for your adviser and your engineer:

  • each step that makes dust, fume, vapour or hot gas
  • the materials and chemicals used, with quantities per month
  • fuel for any boiler, oven or burner
  • the expected exhaust flow if you have it
  • the location of the nearest homes, schools or other sensitive sites
  • your customer’s own environmental requirements, if any

With this page, the adviser can tell you the likely category and the likely monitoring duty. The engineer can size the equipment and the space. The page also makes a landlord’s answers easier to compare, because every landlord is answering the same questions.

Get a shortlist

Tell us your process and the exhaust equipment you expect. We check roof condition, yard space and park rules on site before a unit reaches your shortlist. Send your requirements and we reply within 24 business hours. Tenants pay nothing. For the wider code map, start with our factory building standards overview.

Frequently asked questions

What is the current industrial emission standard in Vietnam?

QCVN 19:2024/BTNMT, issued with Circular 45/2024/TT-BTNMT. It took effect on 1 July 2025 and replaces the older QCVN 19:2009 and QCVN 20:2009, among others.

Does the new standard apply to a tenant that is already operating?

Facilities already operating, or with an approved environmental file before 1 July 2025, may keep their previous rules until the end of 2031. A new project must follow the new standard from the start.

Who is responsible for emission control in a leased factory?

The tenant, as the operator of the process. The landlord must allow the works, such as roof openings, ducts and filter units, so write that consent into the lease.

Where do I find the emission limit for my process?

In the tables of QCVN 19:2024/BTNMT, which set limits by pollutant and by zone. Ask your environmental adviser to read the current table for your source and your location, and do not rely on a number from a listing or a brochure.