Skip to content
Send requirements

Guides / Standards

Which Building Standards Apply to a Leased Factory in Vietnam?

October 31, 2026

A leased factory in Vietnam sits under five groups of rules: fire safety, building design, structural loads, workplace health and the environment. The landlord settled most of the design and structure questions when the building was approved. The groups that depend on how you use the unit are fire safety, workplace conditions and wastewater, and those are the ones a tenant should check before signing.

This guide is general information, not legal or engineering advice. Codes change, so confirm the current edition with a licensed adviser or the park management board.

The map in one table

Area Main documents Who mostly carries it
Fire law and procedure Law on Fire Prevention, Fighting, Rescue and Salvage (Law 55/2024/QH15) and Decree 105/2025/ND-CP Landlord for the building, tenant for its own use and works
Fire technical code QCVN 06:2022/BXD with Amendment 1:2023 Landlord at construction, tenant when use or layout changes
Fire systems TCVN 7568-14:2025 (alarm), TCVN 7336:2021 (sprinklers), TCVN 3890:2023 (equipment) Landlord installs, tenant keeps them working in its area
Production building design TCVN 4604:2012 Designer and landlord
Loads and actions TCVN 2737:2023 Designer and landlord
Classification of works QCVN 03:2022/BXD Designer and landlord
Workplace conditions QCVN 22, 24, 26 and 27:2016/BYT and the chemical exposure regulations Tenant as employer
Wastewater QCVN 40:2025/BTNMT and the park’s own limits Tenant, with the park

A QCVN is a national technical regulation and is mandatory. A TCVN is a national standard. It becomes binding when a regulation, a permit or a contract refers to it. That is why the lease should say which standards the landlord promises the building meets.

What is already settled when you arrive

The building went through design, a construction permit and acceptance before anyone leased it. Three of the groups above belong to that stage.

  • Building design. TCVN 4604:2012 is the design standard for production buildings. See our guide to TCVN 4604 for what it covers.
  • Loads. TCVN 2737:2023 sets the loads and actions that a structure must carry, including wind. The slab rating, roof capacity and crane beams in the drawings come from it.
  • Classification. QCVN 03:2022/BXD sorts works into classes used by designers, including a fire technical classification.

You do not recheck these in detail. You check that the papers exist and that the building matches them: the design approval, the construction permit, the as-built drawings and the fire acceptance record. A landlord papers check covers each of them.

Your checks for this stage are practical. What floor load does the slab carry, what is the clear height under the beam and what crane capacity do the beams allow? Compare the answers with your machines and racking. If you plan to add a mezzanine, a heavy line or roof equipment, ask a structural engineer to confirm the structure first. Some fit-out works also need a construction permit.

What depends on your use

Three groups change with the tenant. The same building can pass for a metal assembly line and fail for a plastics warehouse.

Fire safety. The fire code sets rules by what is made or stored and how much can burn. The approval on file is for a stated use. If your use differs, you may need a new design review and acceptance before you start. Read the QCVN 06 guide and the fire hazard class guide before you pick a unit.

Workplace conditions. As the employer, you must keep lighting, noise, heat, dust and chemicals within national limits and measure them. The Law on Occupational Safety and Hygiene requires employers to arrange workplace environment monitoring at least once a year for harmful factors that have a limit. The building affects the result through its roof, vents and layout. See the guides on lighting, noise and heat and air and chemical exposure.

Wastewater and the environment. The national industrial wastewater regulation is QCVN 40:2025/BTNMT, and a park adds its own connection limits. Your permit or registration depends on your process. See the wastewater standard guide and our guide to the environmental permit.

Editions move, so ask which one applies

Several codes changed in a short time. This is why old papers and new advice sometimes disagree.

Change What happened
Fire law A new fire law and a new implementing decree took effect from 1 July 2025
Fire alarm standard TCVN 7568-14:2025 replaced TCVN 5738:2021
Industrial wastewater QCVN 40:2025/BTNMT took effect on 1 September 2025 and replaced QCVN 40:2011/BTNMT, with a transition for existing facilities
Workplace chemical limits A 70-substance regulation took effect on 1 October 2025 and an 80-substance regulation is set for 9 April 2027

A building approved under an older edition normally keeps its approved design. Works you add, and a change of use, are usually assessed under the editions in force when you apply. Ask your adviser to state the edition in writing. The lease should do the same for anything the landlord promises.

Looking for a factory now? Send my requirements

Questions to ask the landlord

  • Which fire design approval and acceptance record cover this building, and for which use?
  • Which hazard class was the building designed for?
  • What are the slab load, the roof load allowance and the crane rating, and where are they written?
  • Are there changes since the approval, such as mezzanines, partitions or new openings?
  • Does the park set limits on wastewater, noise or emissions that are stricter than the national ones?
  • Who pays and who applies if my process needs a new approval?

Who confirms what

No single adviser covers everything. A licensed fire consultant reads the fire papers against your layout. An occupational safety adviser or a licensed monitoring body handles workplace measurements. An environmental adviser deals with wastewater and emissions. The park management board knows how local offices apply the rules and how long they take. We do not give legal advice, and we do not replace any of them. Our part is to check the papers and the building on site before a unit reaches your shortlist.

For the national fire code itself, the text on a Vietnamese legal database shows QCVN 06:2022/BXD with its first amendment. For a first pass on any unit, use a ready-built factory checklist.

Common misunderstandings

  • “The building has a fire certificate, so I can start.” The documents cover the use the building was approved for. If your process differs, the certificate may not fit.
  • “The park approved my investment, so the building suits my process.” The investment registration and the park’s industry list say that your business line is allowed at that address. They do not check hazard class, floor load or wastewater quality.
  • “Standards are for designers, not tenants.” Many are written for designers, but the lease can make the landlord promise compliance, and the authorities check the result against them.
  • “We can sort it out in fit-out.” Fit-out fixes lighting, partitions and fans. It cannot add structure, change the age of the sprinkler design or create room for a treatment plant on a full plot.

A three-step routine for each unit

  1. Before the visit. Write a one-page process sheet: steps, materials, quantities on hand, storage heights, headcount per shift, the heaviest machine and any chemicals. Send it to the landlord and ask which use the building was approved for.
  2. At the visit. Walk the unit with the papers. Match the approved use with the real building, then check the fire systems, the roof and the drains.
  3. After the visit. Send the process sheet and the photos to your consultants. Ask each one for a short written opinion: fit, fit with works, or not fit.

A unit with the right size and rent but no answer on one of these steps stays on the list as “open”, not “yes”.

Get a shortlist

Tell us your process, your materials and your headcount, and we will note the fire papers, the building spec and the park limits for each unit we visit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

What is the difference between a QCVN and a TCVN?

A QCVN is a national technical regulation and is mandatory. A TCVN is a national standard, which becomes binding when a regulation, a permit or your lease refers to it. Fire and workplace health limits sit mostly in QCVN documents.

Does a tenant have to check the structural design of the building?

Not in detail. The landlord's design approval and construction permit cover the structure. A tenant should check the floor load, clear height and crane capacity against the process, and ask a structural engineer before adding heavy equipment, a mezzanine or a roof load.

Which codes change most often?

Fire, wastewater and workplace chemical limits all changed between 2022 and 2026. Papers issued earlier may cite older editions, so ask your adviser which edition applies to your works and your start date.

Who confirms which code applies to my process?

A licensed fire consultant for fire safety, an occupational safety adviser for workplace conditions and an environmental adviser for wastewater and emissions. The park management board can tell you how local offices apply them.

Looking for a factory now?

Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.

Send my requirements

Keep reading